Construction Engineer
Taif
مجموع سنوات الخبرة :13 years, 1 أشهر
on installation pre-cast concrete canal at marib dam project, Yemen (1997)
5- Five &half years as Construction Engineer for Alaharmin Co.
A-OFFICE WORK
1-My work in the last five years (2007-2012) in TALAL TAHER CONSULTANT OFFICE; made me gain the experience in preparing BILL OF QUANTITYS, (B.O.Q) for the projects which have been designed by the office, not only this but also I worked as quantity surveyor & transferring these quantity to the B.O.Q.
2-Preparation of steel buildings requirements (if part of the project contain steel bldg.), which are necessary for steel bldg.local suppliers.
3-Checking &making the required corrections on the supplier steel bldg.’s shop drawings with design data and approve them for manufacturing.
B- SUPERVISION
1-TALAL TAHER OFFICE, my work as consulting Engineer five years(from 2007-2012).
Most of the clients request supervisors for their projects and we executed the supervisions as per the specification applicable in the kingdom of Saudi Arabia,
And according to the applying procedures of the office in the supervisions.
on diversion works, canal net works &buildings
on net works project for lowering ground water at alsalamuh district
for