senior site engineer
Ben Laden Gruop
Total years of experience :17 years, 7 Months
Supervise the implementation of civil activities for 4 Tunnels around Al masjid Al haram, 2 service tunnels to connect between them.
Every Tunnel Length is about 1000 m. and divided to 2 lanes (pedestrian & emergency lane). Each tunnel contains service culvert and Toilets for Passengers.
Each Tunnel contains different types of finishing systems and materials & contains different types of MEP systems (ventilation system & fire alarm system & firefighting system & water supply and drainage & Eletritical and cables system).
Mange labors & materials and the construction equipment to achieve the best productivity rates.
Manage subcontractors responsible for finishing system such as (Aluminum cladding system & marble cladding system & flooring system & ceiling system).
Plan and Coordinate site activities between different subcontractors.
Monitor the performance of subcontractors.
Lead the execution of project activities regarding the standard & specification to achieve required Quality.
Prepare documents to assure quality as required.
Lead the execution of Health and safety standard.
-Lead and supervise the maintenance and new establishments for several EDITA facilities such as distribution centers and factories.
- lead execution to develop and maintain different structures.
-lead execution of solution design activities required.
-lead the pre-contract activities to develop solutions supporting engineering value.
- managing internal civil related projects: initialization, planning, exaction, monitoring, control, closure.
project Cairo west Air force base
-supervise the implementation of several taxiways, which include soil replacement
- supervise the implementation of civil works for 3 shelters which including ( formwork, steel work, pouring, finishing)
- Site Engineer at ORASCOM for Construction Industries (June 2008 Till Feb. 2013
- Power Station of North Giza, Giza, Egypt (November 2011 till 2013)
Supervise the implementation process of a project, which contains 3 turbines, . and 6 R.C.C.P lines And waret structures like pump house, discharge bld.and infrastructures.
Supervise the implementation of civil work like: dewatering woks, excavation works, piling and foundations works, shoring and lagging systems, R.C. works
”.
- - Thermal Power Station of Abu Qir, Alexandria, Egypt (September 2009 until October 2011)
Supervise the implementation process of a project, which contains 2 turbines, 2 boilers, 2 cheminies and R.C.C.P lines And pump house.
Supervise the implementation of civil work like: dewatering woks, excavation works, piling and foundations works, shoring and lagging systems, R.C. works
-
- New Workshop for NATIONAL STEEL FABRICATION CO., Al-ain Elskona, Suze, Egypt (June 2008 until Aug. 2009)
Supervise the implementation process of a project, which contains 18 hangers for production, storage areas, city housing staff, mosque and administration buildings in about 100 Sqkm in 450 million pounds budget.
t.
- Site Engineer at DALTEX (Sep. 2006 until April 2008)
- Supervise the implementation process of a project, which contains 4 private villas, swimming pool, water networks of a SPA building at 6th of October city, Giza, Egypt.
- Supervise the implementation process of a project which contains water supply, drainage and irrigation networks in about 3 Sqkm and 20 milion pounds budget.
.
General Degree: Good Graduation Project: Contractors, Specifications and Quantities Graduation Project Degree: Very Good