Sr. Site Supervisor
THE ARAB BUILDERES OF BUILDING
مجموع سنوات الخبرة :21 years, 5 أشهر
am working last 2 years in this company
Position Sr. Site Supervisor
Land Surveyor
Duration from Nov 22 2011 to Continuous
Consult East Consult
1) Mohamad Bin Zayed City ( 2 Villa 2nd Floor + Boundary Wall)
2) Al Khaldia Abu Dhabi ( 1 Majlus + 2 Room + Boundary Wall)
3) Khalifa Bin Zayed City B ( 1 Villa 2nd Floor + Boundary Wall)
Responsibilities
✓ Study of approved drawings, specifications and contracts to meet the requirement of design
✓ Control survey & monitoring of excavation area by Digital level high accuracy as
Per design.
✓ Layout for excavation
✓ Adjust lobar on sites
✓ Check Quantity of Material (steel, concrete, block, plaster, tiles)
✓ Preparation of as built data and submission to consult engineers.
✓ lay out block work kicker for building work
Employer THE ARAB BUILDERES OF BUILDING
Position Sr. Site Supervisor
Land Surveyor
Duration from Nov 22 2011 to Continuous
Consult East Consult
1) Mohamad Bin Zayed City ( 2 Villa 2nd Floor + Boundary Wall)
2) Al Khaldia Abu Dhabi ( 1 Majlus + 2 Room + Boundary Wall)
3) Khalifa Bin Zayed City B ( 1 Villa 2nd Floor + Boundary Wall)
Responsibilities
✓ Study of approved drawings, specifications and contracts to meet the requirement of design
✓ Control survey & monitoring of excavation area by Digital level high accuracy as
Per design.
✓ Layout for excavation
✓ Adjust lobar on sites
✓ Check Quantity of Material (steel, concrete, block, plaster, tiles)
✓ Preparation of as built data and submission to consult engineers.
✓ lay out block work kicker for building work
Employer: Rashid Gharib Gen Transport & Contracting Est.
Position Site Supervisor
Duration Jun 10 2010 to Nov 10 2011
Projects: In Madina Zayad (Abu Dhabi) Interlocking Works & Future
Ducting for Etisalat, Electrical & Water Line & (Protection)
Location: Madina Zayad
Consultant: WESTERN REGION MUNICIPALITY (WRM)
Responsibilities
✓ Study of approved drawings, specifications and contracts to meet the requirement of design
✓ Coordination on drawings and site with MEP contractor
✓ Adjust Labor AS The Site Requirement
✓ Calculation The Material as The Site Requirement
✓ Make Daily Report
✓ Submit Application For Site Inspection
Setting out control point’s base from Dubai Municipality Datum
Area measurement for construction purpose
To Control Lines and Levels for different activities
Preparation of as built data and submission to superstructure engineers
Pilling work setting out & checking of verticality of pile
Pier work setting out & checking of verticality of pier
Position Sr. Site Supervisor
Land Surveyor
Duration from Nov 22 2011 to Continuous
Consult East Consult
1) Mohamad Bin Zayed City ( 2 Villa 2nd Floor + Boundary Wall)
2) Al Khaldia Abu Dhabi ( 1 Majlus + 2 Room + Boundary Wall)
3) Khalifa Bin Zayed City B ( 1 Villa 2nd Floor + Boundary Wall)
Responsibilities
✓ Study of approved drawings, specifications and contracts to meet the requirement of design
✓ Control survey & monitoring of excavation area by Digital level high accuracy as
Per design.
✓ Layout for excavation
✓ Adjust lobar on sites
✓ Check Quantity of Material (steel, concrete, block, plaster, tiles)
✓ Preparation of as built data and submission to consult engineers.
✓ lay out block work kicker for building work
Employer: Rashid Gharib Gen Transport & Contracting Est.
Position Site Supervisor
Duration Jun 10 2010 to Nov 10 2011
Projects: In Madina Zayad (Abu Dhabi) Interlocking Works & Future
Ducting for Etisalat, Electrical & Water Line & (Protection)
Location: Madina Zayad
Consultant: WESTERN REGION MUNICIPALITY (WRM)
Responsibilities
✓ Study of approved drawings, specifications and contracts to meet the requirement of design
✓ Coordination on drawings and site with MEP contractor
✓ Adjust Labor AS The Site Requirement
✓ Calculation The Material as The Site Requirement
✓ Make Daily Report
✓ Submit Application For Site Inspection
Employer Five Star Contracting LLC
Position Chief Surveyor
Duration 8 Nov 2007 to 13 Dec 2009
Projects
1. Development and Infrastructure Facilities at Madinat Zayed (Abu Dhabi)
2. DUBAI METRO PROJECT
a) Jadaf-1
b) Jadaf-2
c) Al Nahada
d) Airport free zone
e) Rashidiya station
Responsibilities
1: Setting out control point's base from Dubai Municipality Datum.
2: Layout for railway substructures
3: Setting out of diaphragm walls
4: To Control Lines and Levels for different activities
5: Preparation of as built data and submission to superstructure engineers.
6: Pilling work setting out & checking of verticality of pile
7: Pier work setting out &checking of verticality of pier
8: Control survey & monitoring of excavation area by Digital level high accuracy as
Per design.
9: lay out block work kicker for building work
10: Pile cap & Pier alignment as per design setting out 11: Pier head alignment as per design requirement
12: Setting out of all over ground station railway track
13: Topographic survey for construction purpose
14: Area measurement for construction purpose
Setting out control point’s base from Dubai Municipality Datum
Area measurement for construction purpose
To Control Lines and Levels for different activities Preparation of as built data and submission to superstructure engineers Pilling work setting out & checking of verticality of pile Pier work setting out & checking of verticality of pier
Lay out block work kicker for building work
To Control Lines and Levels for different activities
Lay out block work kicker for building work
To Control Lines and Levels for different activities
Position Sr. Site Supervisor
Land Surveyor
Duration from Nov 22 2011 to Continuous
Consult East Consult
1) Mohamad Bin Zayed City ( 2 Villa 2nd Floor + Boundary Wall)
2) Al Khaldia Abu Dhabi ( 1 Majlus + 2 Room + Boundary Wall)
3) Khalifa Bin Zayed City B ( 1 Villa 2nd Floor + Boundary Wall)
Responsibilities
✓ Study of approved drawings, specifications and contracts to meet the requirement of design
✓ Control survey & monitoring of excavation area by Digital level high accuracy as
Per design.
✓ Layout for excavation
✓ Adjust lobar on sites
✓ Check Quantity of Material (steel, concrete, block, plaster, tiles)
✓ Preparation of as built data and submission to consult engineers.
✓ lay out block work kicker for building work
Employer: Rashid Gharib Gen Transport & Contracting Est.
Position Site Supervisor
Duration Jun 10 2010 to Nov 10 2011
Projects: In Madina Zayad (Abu Dhabi) Interlocking Works & Future
Ducting for Etisalat, Electrical & Water Line & (Protection)
Location: Madina Zayad
Consultant: WESTERN REGION MUNICIPALITY (WRM)
Responsibilities
✓ Study of approved drawings, specifications and contracts to meet the requirement of design
✓ Coordination on drawings and site with MEP contractor
✓ Adjust Labor AS The Site Requirement
✓ Calculation The Material as The Site Requirement
✓ Make Daily Report
✓ Submit Application For Site Inspection
Employer Five Star Contracting LLC
Position Chief Surveyor
Duration 8 Nov 2007 to 13 Dec 2009
Projects
1. Development and Infrastructure Facilities at Madinat Zayed (Abu Dhabi)
2. DUBAI METRO PROJECT
a) Jadaf-1
b) Jadaf-2
c) Al Nahada
d) Airport free zone
e) Rashidiya station
Responsibilities
1: Setting out control point's base from Dubai Municipality Datum.
2: Layout for railway substructures
3: Setting out of diaphragm walls
4: To Control Lines and Levels for different activities
5: Preparation of as built data and submission to superstructure engineers.
6: Pilling work setting out & checking of verticality of pile
7: Pier work setting out &checking of verticality of pier
8: Control survey & monitoring of excavation area by Digital level high accuracy as
Per design.
9: lay out block work kicker for building work
10: Pile cap & Pier alignment as per design setting out 11: Pier head alignment as per design requirement
12: Setting out of all over ground station railway track
13: Topographic survey for construction purpose
14: Area measurement for construction purpose
Employer Dubai Contracting Company LLC
Position Land Surveyor
Duration July 2003 to Nov 2007
(a) PROJECTS
• 55 storey high rise building AL Salam Tower (Satwa)
• 9th Building AL Barsha (Barsha)
• 8th Story Building Mankool Building (Karama)
• 7th Story Hotel Fear Mount (Palm Jumeirah)
• Dubai - U.A.E
• Consultant: Atkins
(b) PROJECT: Al durrah residence 55 floor tower
LOCATION: Sheikh Zayad road near trade center Dubai
CONSULTANT: W.S Atkins
(c) PROJECT: Dubai pearl development office towers
: C2, 65 floor, c3, 55 floors make 2 rafts
LOCATION: Media city, city of Dubai
CONSULTANT: E contractor
CLIENT: The Dubai pearl
Responsibilities
✓ Setting out control point's base from Dubai Municipality Datum
✓ Area measurement for construction purpose
✓ To Control Lines and Levels for different activities
✓ Preparation of as built data and submission to superstructure engineers
✓ Pilling work setting out & checking of verticality of pile
✓ Pier work setting out & checking of verticality of pier
Employer Habib Rafiq Pvt. Ltd. Pakistan Position Surveyor
Duration Jan 2002 to Jan 2003
Projects
1. Defence Housing Scheme Phase 1-2 Islamabad Pakistan
Responsibilities
✓ Lay out block work kicker for building work
✓ To Control Lines and Levels for different activities
Metric Three Years Diploma in Surveyor From Government College of Technology RASOL M.B.DIN ( Mandi Bahuddin Pakistan)
I have a diploma in surveyor