Work with KAR GROUP Iraqi company of oil & gas as a piping Engineer for fabricate pipe network of gas power station by using solar turbine in khurmala oil field -Erbil kurdstan -Iraq.
Work in operation department as an engineer to help with pre-commissioning commissioning works with Vetra group operational campany -Erbil Refinery- Iraq Kurdstan.
-Supervising of the third party inspection of the storage tanks performed by S.G.S Swiss company and inspection all mechanical work in erbil Refinery expansion project .
QA/QC supervisor engineer for izomeration unit stationary equipments of northen refineries company .
Mechanical engineer for unit one boiler rehabilitation Almarjal company .Baiji thermal power station Iraq.
Mechanical engineer for unit one boiler rehabilitation Almarjal company .Baiji thermal power station iraq.
Mechanical engineer for (F.D.fan) an rehabilitation Almarjal
company, Baiji thermal power station Iraq.
Mechanical engineer for gantry crane rehabilitation Almarjal company Baiji gas power station Iraq under supervision of FLOOR company
Instalation and maintenance for water treatment unit which supplying water for main boilers for thermal power plant.
Instuling chiled water central AC system
General study of mechanical engineering in AC system and flow study stat of flud and gas with study of strees analysis