Adnan Qarout, constuction manager

Adnan Qarout

constuction manager

consolidate contractor company CCC

Location
Jordan - Irbid
Education
Bachelor's degree, Civil Engineering
Experience
29 years, 8 months

Share My Profile

Block User


Work Experience

Total years of experience :29 years, 8 months

constuction manager at consolidate contractor company CCC
  • Oman - Muscat
  • July 2008 to December 2015

As construction manager my responsibility for all the site works , in addition to have meetings with consultant, and to coordinate with other sub contractors.

constuction manager at consolditete contractor company ccc
  • Oman - Muscat
  • July 2008 to December 2015
CONSTRUCTION MANAGER at 2015 - Dualization of Farq Roundabout–Marfa’a Daris Road, Wilayat Nizw
  • January 2015 to July 2015

Oman Contract Value: US$. 78, 029, 314 million.
The project comprises the dualization of the existing single carriageway road from Farq Roundabout to Marfa’a Daris (about 17 km). The existing road passes through the dense urban development of the Town of Nizwa adjacent to a major wadi. The works comprise upgrading existing junctions to signalized intersections, provision of new signalize intersections, the construction of five new roundabouts, three pedestrian bridges, six pedestrian underpasses and two wadi bridges.

PROJECT ENGINEER at Aseelah-Ras Al Hadd Road Project (RHA)
  • September 2009 to November 2009

Planned and supervised the major functions of the project section which included the responsibility for the planning and co-ordination of all manpower and equipment, materials supplies, and sub-contracted services, towards the proper completion of the work on schedule with approved drawings, specification, cost and quality limitations.

  • August 2008 to September 2009

Port Interchange Project (SPIN) - Oman Contract Value: US$ 127, 651, 600 million.

The project comprises the construction of a main Cloverleaf interchange, two subsidiary flyovers and the dualization or realignment of the highways leading to the interchange.

CONSTRUCTION MANAGER at 2014, Development of Muscat International Airport Main Contract1 (DMIA)
  • December 2009 to June 2009

Oman Contract Value: US$ 1, 168, 831, 169 million.
Construction of New Runway, 4000 m long, 60 m wide with 2 shoulders of 7.5 m, taxiways 25 m wide with two shoulders of 17.5 m, rapid exit taxiway, link taxiways, dualization of existing roads, service roads, 8 bridges, earthworks, utilities system, utility buildings, airfield lighting system, drainage and sewage collection system and upgrading of the existing runway.

at Construction of an Integrated Salam Resort & Sp
  • Oman
  • July 2008 to August 2008

Value: US$ 64, 935, 065 million.
Advanced earthworks and reclamation to construct a Marina

at NON-CCC GROUP
  • January 1986 to January 2007

Project Construction of a part of the complimentary works for Qassim Al-Madinah - Rabigh Road Interchanges.

Manager
  • Saudi Arabia
  • January 2005 to January 2006

Value: US$ 3, 090, 000 million.

Section Engineer
  • January 1997 to January 2004

Rabigh Expressway - Contract Value: US$ 90 million.

Project
  • January 1995 to January 1997

Value: US$ 36, 050, 000 million.

Duties:
Executed the following activities, Box Culverts Construction works under roads (Utility culvert - Waste Water - Storm Culverts), Electrical Civil Work (Telephone, Electrical Lighting Column), House connections (Waste Water Connections, Ductile pipes), Storm Water Connections Asbestos pipes, Finishing inside culverts (Water Proofing, Plaster, Painting, Executed Roads, Curbstone work.

Project
  • January 1992 to January 1995

of the Central Area District - 2 in Madinah - Saudi Arabia Contract Value: US$ 25, 750, 000 million

Site Engineer
  • January 1986 to January 1992

Executed the following activities:
Box Culverts Construction works under roads (Utility culvert - Waste Water - Storm Culverts)
Electrical Civil Work (Telephone, Electrical Lighting Column)
House connections (Waste Water Connections, Ductile pipes),
Storm Water Connections Asbestos pipes,
Finishing inside culverts (Water Proofing, Plaster, Painting, Executed Roads, Curbstone

  • January 1989 to January 1991

in Artificial Stone (Walls, Arches, Top Slab

  • January 1987 to January 1989

Executed Foundations, Column, Slabs) Under Ground Water Tanks,

Site Engineer at Pile Caps and Jacket Pile
  • January 1986 to January 1987
Site Engineer at Jordan National company
  • January 1984 to January 1985

construction of schools, main post offices
Duties

Site Engineer
  • to
at ADNAN QAROUT
  • to

Review contract/tendering documentation, to ensure a thorough understanding of the relevant contract requirements liaising with planning and budgeting engineers as necessary to establish and implanting systems for the section.
Assess and influence content of client/ partner construction drawings and procedures, prior to issue, in order that construction execution is optimized in the most cost effective and timely manner.
Ensure that all actions and activities assigned to the section at the mobilization stage are implemented within agreed time scales.
Establish together with relevant Managers and Engineers, the resourcing requirements for the section, including staffing, PMV etc. to ensure that these are accurate.
Plan/schedule the work priorities and resources in line with the Construction Schedule monitoring subsequent progress, ensuring the corrective action is agreed and implement where variation from Schedule occurs.
Provide technical advice and guideline in the event of any contractual/ legal matters or complications relevant to his scope of work.
Monitor the supervision or the work being undertaken within own scope of work to ensure full compliance with all relevant standards e.g Contract documents, specification, method statements, CCC policy and procedures.

Establish and subsequently monitor all work processes and systems within own Section/area to ensure that CCC policy and procedures i.e ISO 9000. Safety procedures are constantly implemented.

Education

Bachelor's degree, Civil Engineering
  • at University of Alabama
  • December 1983
Bachelor's degree, Civil Engineering
  • at Civil Engineering
  • December 1983

Specialties & Skills

BRIDGES
BUDGETING
CUSTOMER RELATIONS
ENGINEERING
MATERIALS MANAGEMENT
MICROSOFT WORKS
PROCUREMENT
UPGRADES
UTILITIES

Languages

English
Intermediate