As construction manager my responsibility for all the site works , in addition to have meetings with consultant, and to coordinate with other sub contractors.

constuction manager à consolditete contractor company ccc
  • Oman - Muscat
  • juillet 2008 à décembre 2015
CONSTRUCTION MANAGER à 2015 - Dualization of Farq Roundabout–Marfa’a Daris Road, Wilayat Nizw
  • janvier 2015 à juillet 2015

Oman Contract Value: US$. 78, 029, 314 million.
The project comprises the dualization of the existing single carriageway road from Farq Roundabout to Marfa’a Daris (about 17 km). The existing road passes through the dense urban development of the Town of Nizwa adjacent to a major wadi. The works comprise upgrading existing junctions to signalized intersections, provision of new signalize intersections, the construction of five new roundabouts, three pedestrian bridges, six pedestrian underpasses and two wadi bridges.

PROJECT ENGINEER à Aseelah-Ras Al Hadd Road Project (RHA)
  • septembre 2009 à novembre 2009

Planned and supervised the major functions of the project section which included the responsibility for the planning and co-ordination of all manpower and equipment, materials supplies, and sub-contracted services, towards the proper completion of the work on schedule with approved drawings, specification, cost and quality limitations.

  • août 2008 à septembre 2009

Port Interchange Project (SPIN) - Oman Contract Value: US$ 127, 651, 600 million.

The project comprises the construction of a main Cloverleaf interchange, two subsidiary flyovers and the dualization or realignment of the highways leading to the interchange.

CONSTRUCTION MANAGER à 2014, Development of Muscat International Airport Main Contract1 (DMIA)
  • décembre 2009 à juin 2009

Oman Contract Value: US$ 1, 168, 831, 169 million.
Construction of New Runway, 4000 m long, 60 m wide with 2 shoulders of 7.5 m, taxiways 25 m wide with two shoulders of 17.5 m, rapid exit taxiway, link taxiways, dualization of existing roads, service roads, 8 bridges, earthworks, utilities system, utility buildings, airfield lighting system, drainage and sewage collection system and upgrading of the existing runway.

à Construction of an Integrated Salam Resort & Sp
  • Oman
  • juillet 2008 à août 2008

Value: US$ 64, 935, 065 million.
Advanced earthworks and reclamation to construct a Marina

à NON-CCC GROUP
  • janvier 1986 à janvier 2007

Project Construction of a part of the complimentary works for Qassim Al-Madinah - Rabigh Road Interchanges.

Manager
  • Arabie Saoudite
  • janvier 2005 à janvier 2006

Value: US$ 3, 090, 000 million.

Section Engineer
  • janvier 1997 à janvier 2004

Rabigh Expressway - Contract Value: US$ 90 million.

Project
  • janvier 1995 à janvier 1997

Value: US$ 36, 050, 000 million.

Duties:
Executed the following activities, Box Culverts Construction works under roads (Utility culvert - Waste Water - Storm Culverts), Electrical Civil Work (Telephone, Electrical Lighting Column), House connections (Waste Water Connections, Ductile pipes), Storm Water Connections Asbestos pipes, Finishing inside culverts (Water Proofing, Plaster, Painting, Executed Roads, Curbstone work.

Project
  • janvier 1992 à janvier 1995

of the Central Area District - 2 in Madinah - Saudi Arabia Contract Value: US$ 25, 750, 000 million

Site Engineer
  • janvier 1986 à janvier 1992

Executed the following activities:
Box Culverts Construction works under roads (Utility culvert - Waste Water - Storm Culverts)
Electrical Civil Work (Telephone, Electrical Lighting Column)
House connections (Waste Water Connections, Ductile pipes),
Storm Water Connections Asbestos pipes,
Finishing inside culverts (Water Proofing, Plaster, Painting, Executed Roads, Curbstone

  • janvier 1989 à janvier 1991

in Artificial Stone (Walls, Arches, Top Slab

  • janvier 1987 à janvier 1989

Executed Foundations, Column, Slabs) Under Ground Water Tanks,

Site Engineer à Pile Caps and Jacket Pile
  • janvier 1986 à janvier 1987
Site Engineer à Jordan National company
  • janvier 1984 à janvier 1985

construction of schools, main post offices
Duties

Site Engineer
  • à
à ADNAN QAROUT
  • à

Review contract/tendering documentation, to ensure a thorough understanding of the relevant contract requirements liaising with planning and budgeting engineers as necessary to establish and implanting systems for the section.
Assess and influence content of client/ partner construction drawings and procedures, prior to issue, in order that construction execution is optimized in the most cost effective and timely manner.
Ensure that all actions and activities assigned to the section at the mobilization stage are implemented within agreed time scales.
Establish together with relevant Managers and Engineers, the resourcing requirements for the section, including staffing, PMV etc. to ensure that these are accurate.
Plan/schedule the work priorities and resources in line with the Construction Schedule monitoring subsequent progress, ensuring the corrective action is agreed and implement where variation from Schedule occurs.
Provide technical advice and guideline in the event of any contractual/ legal matters or complications relevant to his scope of work.
Monitor the supervision or the work being undertaken within own scope of work to ensure full compliance with all relevant standards e.g Contract documents, specification, method statements, CCC policy and procedures.

Establish and subsequently monitor all work processes and systems within own Section/area to ensure that CCC policy and procedures i.e ISO 9000. Safety procedures are constantly implemented.

Éducation

Baccalauréat, Civil Engineering
  • à University of Alabama
  • décembre 1983
Baccalauréat, Civil Engineering
  • à Civil Engineering
  • décembre 1983

Specialties & Skills

BRIDGES
BUDGETING
CUSTOMER RELATIONS
ENGINEERING
MATERIALS MANAGEMENT
MICROSOFT WORKS
PROCUREMENT
UPGRADES
UTILITIES

Langues

Anglais
Moyen