EPM (Equipment Processing Manager) at Huawei Technologies
  • Pakistan - Islamabad
  • February 2022 to March 2023

• Followed up with Customer/Warehouse/Survey/Design/PO Office/FSC teams for Power EP.
• Verifying site Designs and checking available margins in locked BOQ contracts and Inventory in regional WH.
• Verifying and modifying Power SDBOQ/EDBOQ according to actual site solution and shared it with PO Office for Publication.
• Verifying published SDBOQ/EDBOQ and initiating PR/MR requests.
• Verifying MR and share it for DN as per actual site design.
• Issuance of I&C and FWD/REV TRP PO to subcons after getting WBS approval.
• Initiating TN & INTN requests to complete urgent MR.

MW Transmission Site Engineer at Huawei Technologies
  • Pakistan - Islamabad
  • November 2016 to February 2022

Worked in Huawei Pakistan as MW Transmission Engineer on CMPAK project (North region/Centter).
• Coordinate with Subcon POCs and teams for EHS, I&C, QC, CIAG, cutover and other activities.
• Coordination with Customer about WO approval, Joint Visits, Sites ATP and other related issues.
• Conducted LOS surveys on CMPAK sites for New and upgradation of links.
• Supervised MW I&C of Huawei RTN 300/900 series (including RTN320/380H/905 1A & 2A RTN950/950A & 980) by using latest WebLCT/MDT tools on CMPAK Rollout and Expansion projects.
• MW links I&C and troubleshoot (HSB, SD, XPIC, MIMO, SDB, IBT etc) and supervised installation of 0.3, 0.6, 0.9, 1.2 & 1.8m MW Antennas with EHS/QC/QA/CIAG tasks closed in ISDP.
• Configured E2E media, done E2E Ping test and ready sites for EPLA/SEPLA/LAG/Cutover/Hot Swap activities.
• Successfully replaced RTN (905/950A/980), control cards (CSHN/CSHOF/CSHNA/CSHUN) and IF cards (ISU2/ISV3/ISM6/ISM8) in minimum time within outage window.
• Installed EG4/EM6/EM6F/EM6D/EM6X cards and done RTN-RTN & RTN-PTN optical connectivity and ready sites for 3G/4G traffic shifting.
• Performed Pre ATP & ATP activities with customer and subcon at CMPAK sites.

BSS/MW Transmission Engineer at EESPAK Pvt Ltd Pakistan
  • Pakistan - Islamabad
  • July 2012 to July 2014

Worked in EESPAK as Transmission/BSS Engineer and having experience in following areas of MW TXN & BSS at CMPAK / MOBILINK Huawei TXN Swap Project & TP ZTE Swap Project.
•Conducted LOS/2G/3G surveys at Mobilink & CMPAK sites in North & Center regions.
•Installation, commissioning and troubleshooting of Huawei RTN 900 series (including 905 1A / 905 2A / 910 / 950 / 950A & 980.) at Mobilink and CMPAK sites.
•Installation & commissioning of MW NEC iPASOLINK 200, 400 & 1000 at Telenor sites.
•Worked on (HSB, SD, XPIC) Links at CMPAK sites in C1 and C2 regions.
•Supervised 0.3, 0.6, 0.9, 1.2 & 1.8m MW Antennas installation.
•Performed quality check, Pre ATP’s & PAT activities at CMPAK, Mobilink & TP sites.
•Installation of Huawei 3G equipment at Mobilink & CMPAK sites.
•Installation & commissioning of Huawei 4G equipment at PTCL EVO Project in North region.
•Done RRU/RF Antenna expansion activities at Mobilink sites.
•Done CES Battery Power Swap at Mobilink sites.
•Installation of ZTE SDR 8700/8900A and swap NSN at Telenor sites in C1 region.

BSS/NGN Engineer at tier 4 pvt ltd. islamabad
  • Pakistan - Lahore
  • May 2011 to June 2012

Worked as BSS/NGN Engineer and having Experience in following areas of Transmission in CMPAK TXN Swap Project and PTCL NGN Project: • Installation of ZTE NGN equipment in PTCL (Multan & Lahore region)
• Integration of ZTE ZXR10 Switch and MSAG in PTCL (Multan & Lahore region)
• Conducted NGN PAT in PTCL (Multan & Lahore region)
• Conducted Cutover from Alcatel/EWSD to ZTE NGN at PTCL sites in Multan region.
• Conducting LOS Surveys on CMPAK SWAP Project in Faisalabad region.
• Installation and Commissioning of Huawei RTN 910/950.
• Create Cross Connection and physically E1 through of RTN (910)
• Working on MW (1+0, 1+1, XPIC) Links at CMPAK sites in Multan.
• MW ATPs on CMPAK Project in Multan Region.
• BTS 3012 installation & Expansion at Ufone sites.
• Working on BTS swap project from Huawei 3012 to 3900 at Ufone sites.
• Coordinate Ufone BTS swap ATP's.

NIP Internee at ptcl ( pakistan telecommunication company limited)
  • Pakistan - Islamabad
  • April 2010 to April 2011

• Worked on NewBridge Alcatel (SUN Based), Loops Symbia (Windows Based) & Tellabs (Windows Based) Systems.
• Addition of newly installed nodes at NMS using DXX 8100 Network Node Manager
• Configuration and troubleshooting of DXX Circuits.
• Conduct PAT of the above mentioned nodes using standard test protocols.
• Remotely DXX network monitoring throughout all over Pakistan.
• Provide second level support to the O&M resources during fault rectification from NMS.
• Grooming of E1 for proper media utilization via Tellabs 8100 series for corporate customers.

Core Network internee at relacom (pvt) ltd, pakistan
  • Pakistan - Islamabad
  • November 2010 to January 2011

• Worked as CN Core Network Internee for installation and commissioning of NGN (UMG8900) of HUAWEI for the project of a Defense department of Pakistan.
• Conducted PAT for UMG8900.
• Fault Management with HUAWEI according to SLA.
• Connectivity of MD110 with UMG8900 and softX3000.
• Creation of M2UA links, SS7, SIGTRAN, M3UA and QSIG conversion into SS7.

NMS-NOC Associate Internee at Imunar Pvt Ltd
  • Pakistan - Islamabad
  • January 2010 to March 2010

• Main responsibility was to remotely monitored network devices (Routers, Switches, Modems etc) those are installed in Restoration Hardware Stores in USA.
• Remotely configure and troubleshooting of Routers, switches etc.
• Remotely monitoring of alarms and states of network devices.
• Troubleshoot network devices to customers through Call or by email.

Education

Master's degree, Electronics & Communication Engineering
  • at Beijing University of Posts and Telecommunications
  • July 2016

I got scholarship for 2 Years English program Masters (Electronics & Communication Engineering) from Chinese Government. Now I am working on my final year research work Thesis. My area of research is 5G Ultra Dense Network. We are trying to make a 3 Tier architecture and give new design of virtualization of cell.

Bachelor's degree, Telecommunication And Networking
  • at COMSATS Institute Of Information Technology, Wah Cantt.
  • September 2009

I have done my final year project on ""GSM based Energy Meter " to digitize the collection of customers Energy meter data and generate bills.

Diploma, Information Technology
  • at SWEDISH Institute of Technology, Wah Cantt.
  • August 2005

I have done Visual Basic based FM transmitter controller as a final year project.

High school or equivalent, Science
  • at F.G Boys High School, Wah Cantt.
  • July 2002

Matriculation (Science) F.G Boys High School, The Mall, Wah Cantt. 2002

Specialties & Skills

Teamwork
Troubleshooting
Comissioning
Equipment Installation
Telecommunications
ALCATEL NewBridge
BTS 3900
RTN 600/ 900 series
Huwaei UMG
TelLabs
ZTE ZXR / Switch
NEC iPasslink

Languages

English
Expert
Urdu
Native Speaker
Chinese
Beginner

Memberships

International Student Council
  • Fund Raising/Cultural shows etc
  • September 2014
Capmpus Telecom Council
  • Researcher
  • October 2014

Training and Certifications

CCNA (Training)
Training Institute:
UET, Taxila, Pakistan
Date Attended:
July 2009
Duration:
180 hours
Transmission/ Quality/ Troubleshooting (Training)
Training Institute:
Huawei Pakistan
Date Attended:
March 2013
Duration:
8 hours
Dispersion Management in Optical Fiber System (Training)
Training Institute:
CIIT, Pakistan
Date Attended:
November 2008
Duration:
3 hours
WCDMA (Training)
Training Institute:
Huawei Pakistan
Date Attended:
February 2014
Duration:
8 hours

Hobbies

  • Traveling
  • Internet Browsing
  • Playing and Watching Gamaes