AHMED ABDUL FATTAH ASKAR, Projects Site Manager

AHMED ABDUL FATTAH ASKAR

Projects Site Manager

Precast FZCO

Location
United Arab Emirates - Abu Dhabi
Education
Bachelor's degree, Bachelor of Science, Electrical & Computer Engineering
Experience
18 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :18 years, 3 Months

Projects Site Manager at Precast FZCO
  • United Arab Emirates - Dubai
  • My current job since February 2014
Project Manager at NAYAA CONTRACRING
  • United Arab Emirates - Al Ain
  • January 2013 to February 2014

 Plans and controls execution of assigned projects. Acts as the primary on-site leader for execution teams on assigned projects.
 Responsible for flawless and profitable project execution in compliance with contractual obligations (accurate, on-time, billed, within budget & scope of contract).
 Primary on-site leader for execution team consisting of both front line delivery teams and subcontractors. Attends job progress meetings as required, steers corrective actions and defines recovery plans where needed. Escalates issues when required.
 Drive project review meetings. Analyse and audit engineering contract and standard compliance, execution issues and change requests, costs, billings, collections, and payables. Make changes to optimize performance and continuously strive to improve margins.
 Investigates opportunities for improvements in the project scope that will result in value added change orders. Performs associated cost estimates, prepares proposals and secures customer acceptance.

Telecom Team leader/PM at ENIVICON-Emirates
  • Other
  • February 2009 to October 2012

Project Engineering
 Monitoring projects with respect to cost, resource deployment, time over-runs and quality compliance to ensure execution of projects within the time & cost parameters.
 Preparing bill of Quantity & detail engineering; conducting project review meetings for evaluating project progress & taking adequate corrective actions, if required.
 Design, integrate, implement and commission Structured Cabling and fiber optics Network System (Voice/Data/Video)

Installation & Commissioning / Maintenance
 Anchoring commissioning of networks; drawings, ensuring completion of project in minimum turnaround time effective resource utilisation to maximize the output.
 Ensuring preventive maintenance of networks including schedules / shutdown maintenance to ensure trouble-free and seamless operations.
 Preparing various project reports for identifying areas of obstruction / defects, conducting troubleshooting, service and repair to rectify the network.

Team Management
 Leading, mentoring & monitoring the performance of team members to ensure efficiency in process operations and meeting of project targets.
 Creating and sustaining a dynamic environment that fosters development opportunities and motivates high performance amongst team members.

Notable Accomplishments
 Effectively carried out the maintenance effectively so that the client can run the system with old device’s itself.
 Significantly executed all assigned projects before the client desired time which led to client satisfaction.

Network Project Engineer at HITEKNODFAL
  • Other
  • December 2007 to December 2008

 Executing the Projects & assignments efficiently and achieving milestones and scheduled completion.
 Survey, plan, design, integrate, implement and commission small, medium and large-scale projects Communications Networks (copper & fiber optics) ISP/OSP.
 Manages the entire communications networks to preserve the international standards TIA/EIA & ITU-T,
 Ensuring superior levels of quality by adhering to approved design, contractual terms and conditions, project scope and method statements
 Ensuring strict compliance to engineering standards & practices, government regulations, and quality standards.
 Ensuring accuracy of executed work as per approved drawings and adherence to engineering standards and minimise / eliminate repeat works
 Following, monitoring and recording of verbal and written instructions and design changes to protect company's interest.
 Arranging and making all changes which were made during execution from the approved plan.
 Controlling all costs including manpower (own and hired) and material within budgeted levels by careful planning and execution and achieve the budgeted margin or more.

Network implementation Engineer at Xperts Xchange (Communication network solutions)
  • Other
  • October 2005 to December 2007

•planning and design for telecommunications Outside/Inside Plant projects covering mainly on telephone facilities such as primary and secondary distribution cables for both copper and fiber optic cables link to support the LAN / WAN cable networks for the inter building Data and voice infrastructure

•Supervise technicians for the construction and installation of the telecommunication infrastructure inside the buildings.

•Prepare engineering detail design for the voice and data Transport Infrastructure and their components such as equipment racks, conduits, patch panels and other components from Communication Equipment Room to the information outlets

Education

Bachelor's degree, Bachelor of Science, Electrical & Computer Engineering
  • at 10th of Ramadan High Technological engineering faculty
  • August 2005

Specialties & Skills

Telecom Infrastructure
Distribution Network Design
Cabling
Fiber Optics
Network Engineering

Languages

English
Intermediate
Arabic
Expert