Total Years of Experience: 17 Years, 6 Months
December 2015
To Present
Lead Technical Office Engineer” HV/MV Substation”
at Ibn Omairah Contracting Company (IOC)
Location :
Saudi Arabia - Riyadh
Work responsibility
1. Technical support for any issue related to Electrical (Design & Tendering)
2. Electrical coordinator for substations between IOC, DAR & NG.
3. Prepare the weekly tasks required to finalize/close the design, and link it with PMO and SS Project Team.
4. Follow up the weekly report for Design Status.
5. Finalize any technical issue with Manufacturers - for purchasing process.
6. Attend site visits during Tender and design stage.
Substations:-
- 132/13.8 KV GIS Substations (8187 S/S, 8220S/S, 8219S/S&8502 S/S) in Saudi Electricity Company Central Operation Area (Design).
- CONSTRUCTION OF NEW 110/13.8KV KING KHALID HOSPITAL-2 SUBSTATION, JEDDAH(Tender)
- CONSTRUCTION OF NEW 110/13.8kV SUBSTATION FOR NATIONAL GUARD HOSPITSALIN TAIF(Tender)
- CONSTRUCTION OF 132/13.8Kv SUBSTATION #8360 AT KHAS•HM AL AAN, RIYADH(Tender)
- CONSTRUCTION OF NATIONAL GUARD 132/13.8KV S/S # 8857
- IN QASSIM AREA (Tender)
- CONSTRUCTION OF 400/132 KV GRID STATIONS AT QABEL, OMAN( Tender)
1. Technical support for any issue related to Electrical (Design & Tendering)
2. Electrical coordinator for substations between IOC, DAR & NG.
3. Prepare the weekly tasks required to finalize/close the design, and link it with PMO and SS Project Team.
4. Follow up the weekly report for Design Status.
5. Finalize any technical issue with Manufacturers - for purchasing process.
6. Attend site visits during Tender and design stage.
Substations:-
- 132/13.8 KV GIS Substations (8187 S/S, 8220S/S, 8219S/S&8502 S/S) in Saudi Electricity Company Central Operation Area (Design).
- CONSTRUCTION OF NEW 110/13.8KV KING KHALID HOSPITAL-2 SUBSTATION, JEDDAH(Tender)
- CONSTRUCTION OF NEW 110/13.8kV SUBSTATION FOR NATIONAL GUARD HOSPITSALIN TAIF(Tender)
- CONSTRUCTION OF 132/13.8Kv SUBSTATION #8360 AT KHAS•HM AL AAN, RIYADH(Tender)
- CONSTRUCTION OF NATIONAL GUARD 132/13.8KV S/S # 8857
- IN QASSIM AREA (Tender)
- CONSTRUCTION OF 400/132 KV GRID STATIONS AT QABEL, OMAN( Tender)
May 2014
To November 2015
Primary Team Leader design Engineer
at Jawda Engineering Consultant (JEC)
Location :
Egypt - Cairo
Work responsibility
1. Allocating tasks to staff
2. Reviewing all design documents before submission to client
3. Ensuring the performance of the staff is of a high standard
4. Reporting to management
5. Organizing holidays and training
6. Discussing and resolving problems
7. Handling complaints (from both staff and customers)
Work field
1. Substation general layout
2. Earthing system design calculations
3. Earthing grid layout
4. Reinforcement earthing plan & sections
5. Equipment earthing layout and details
6. Equipment arrangement layout plan & sections
7. Cables raceway cabling plan, section and details
8. Cables raceway loading calculation
9. Electrical wall openings layout & sections
10. Shielding system design calculations
11. Shielding protection layout and details
12. Bill of quantities
Substations
- 32/13.8 KV GIS Substations in Saudi Electricity Company Central Operation Area (8166 S/S, 8225S/S, 8116S/S & 8171S/S)
- 110/13.8 KV& 110/33 KV GIS Substations in Saudi Electricity Company Western Operation Area (BAB JEDDAH S/S, YANBU NORTH S/S, ADOM S/S, LAITH S/S, JAMOOM S/S, JEDDAH SEA PORT S/S and YANBU NAKHEEL S/S )
- 132/13.8 KV GIS Substations in Saudi Electricity Company Southern Operation Area (MOKHTARA S/S and NAJIRAN S/S)
1. Allocating tasks to staff
2. Reviewing all design documents before submission to client
3. Ensuring the performance of the staff is of a high standard
4. Reporting to management
5. Organizing holidays and training
6. Discussing and resolving problems
7. Handling complaints (from both staff and customers)
Work field
1. Substation general layout
2. Earthing system design calculations
3. Earthing grid layout
4. Reinforcement earthing plan & sections
5. Equipment earthing layout and details
6. Equipment arrangement layout plan & sections
7. Cables raceway cabling plan, section and details
8. Cables raceway loading calculation
9. Electrical wall openings layout & sections
10. Shielding system design calculations
11. Shielding protection layout and details
12. Bill of quantities
Substations
- 32/13.8 KV GIS Substations in Saudi Electricity Company Central Operation Area (8166 S/S, 8225S/S, 8116S/S & 8171S/S)
- 110/13.8 KV& 110/33 KV GIS Substations in Saudi Electricity Company Western Operation Area (BAB JEDDAH S/S, YANBU NORTH S/S, ADOM S/S, LAITH S/S, JAMOOM S/S, JEDDAH SEA PORT S/S and YANBU NAKHEEL S/S )
- 132/13.8 KV GIS Substations in Saudi Electricity Company Southern Operation Area (MOKHTARA S/S and NAJIRAN S/S)
May 2013
To May 2014
Senior Electrical Design Engineer
at Power System Projects - PSP
Location :
Egypt - Cairo
Senior Electrical Design Engineer at
Power System Projects - PSP - is one of Elsewedy Cables turnkey subsidiary that provides an EPC solution within the power generation and high voltage substation projects.
With enthusiastic and expert Engineers and Employees, Power System Project is doing the best to serve its clients with a good performance and high efficient service delivery solutions that span the Electrical & Mechanical activities for power system projects, maximizing our full service portfolio to integrate Engineering, Procurement, and Construction services with experienced project management team that can tailor our services to meet our customer projects and business activities.
Work field
1. Layout and Sections.
2. Opening Details Layout.
3. Electrical Equipment Arrangement.
4. Cable Raceway Layout & Sections.
5. Earthing System Calculation & Layout.
Projects :-
1. DIWANIA (4X125 MW) 9E Gas Power Plant in IRAQ
Power System Projects - PSP - is one of Elsewedy Cables turnkey subsidiary that provides an EPC solution within the power generation and high voltage substation projects.
With enthusiastic and expert Engineers and Employees, Power System Project is doing the best to serve its clients with a good performance and high efficient service delivery solutions that span the Electrical & Mechanical activities for power system projects, maximizing our full service portfolio to integrate Engineering, Procurement, and Construction services with experienced project management team that can tailor our services to meet our customer projects and business activities.
Work field
1. Layout and Sections.
2. Opening Details Layout.
3. Electrical Equipment Arrangement.
4. Cable Raceway Layout & Sections.
5. Earthing System Calculation & Layout.
Projects :-
1. DIWANIA (4X125 MW) 9E Gas Power Plant in IRAQ
July 2011
To April 2013
Electrical Design Engineer & COORDINATOR
at AL DAR (AL FANAR)
Location :
Egypt - Cairo
is one of the leaders in providing design and engineering services for substations. Provide Design & Engineering services for Civil, Electrical, Mechanical and protection Design for Utility, Industrial and other consumer substations of Medium & Extra High Voltages up to 380kV. Covers GIS, AIS indoor and Outdoor Substations.
Work field
1. Sub station Layout.
2. Cable Raceway (H.V, M.V &L.V).
3. Wall Openings and Cutout Floor.
4. Duct bank & Man Hole.
5. Electrical Equipment arrangement layouts.
6. Earthing (Calculation, Earth Grid, Equipment earthing &Reinforcement layouts)
7. Lighting (Indoor &Outdoor Calculation and Layouts, Branch Cable Sizing, Panel board schedule & Lighting SLD)
8. Operational Single Line Diagram.
9. Shielding System.
10. Preparing Bill of quantity.
11. Review Technical offers.
Substations:-
380/132/13.8 KV GIS Substations in Saudi Electricity Company Central Operation Area (9027 S/S, 9017 S/S, 9029 S/S, 9020 S/S)
132/13.8 KV GIS Substations in Saudi Electricity Company Central Operation Area (8839 S/S & 8189)
Work field
1. Sub station Layout.
2. Cable Raceway (H.V, M.V &L.V).
3. Wall Openings and Cutout Floor.
4. Duct bank & Man Hole.
5. Electrical Equipment arrangement layouts.
6. Earthing (Calculation, Earth Grid, Equipment earthing &Reinforcement layouts)
7. Lighting (Indoor &Outdoor Calculation and Layouts, Branch Cable Sizing, Panel board schedule & Lighting SLD)
8. Operational Single Line Diagram.
9. Shielding System.
10. Preparing Bill of quantity.
11. Review Technical offers.
Substations:-
380/132/13.8 KV GIS Substations in Saudi Electricity Company Central Operation Area (9027 S/S, 9017 S/S, 9029 S/S, 9020 S/S)
132/13.8 KV GIS Substations in Saudi Electricity Company Central Operation Area (8839 S/S & 8189)
October 2007
To July 2011
SENIOR Electrical Design Engineer
at Jawda Engineering Consultant (JEC)
Location :
Egypt - Cairo
Jawda Engineering Consultant (JEC) is a consultant firm with a wide experience in design as well as consultancy services in the field of substations, power stations, and transmission and distribution systems including Electrical, Civil, Architectural and Mechanical works.
Work field
1. Power and Control Cable Raceway (Cable routing).
2. Load calculation for Power and Control Cable Raceway.
3. Electrical Equipments Arrangement.
4. Substations General Layout (GIS or AIS).
5. Wall Openings and Cutout Floor.
6. Coordination between Electrical, Civil and Architecture Departments.
7. Preparing Bill of Quantity.
Substations:-
110/13.8 KV GIS Substations in Saudi Electricity Company Western Operation Area (Al-HARAMAIN S/S, ICY4 S/S, Al-AMAL S/S, SHORAN S/S, Al-NUZLA 2 S/S, ICY5 S/S, BADER S/S, BANI NAJJAR S/S and AL ANDLUS S/S)
132/13.8 KV GIS Substations in Saudi Electricity Company Western Operation Area(TABOUK S/S # 1&7, TABUK 5-B, TABUK 10 and TABOUK UNIVERSITY S/S )
132/33/13.8 KV GIS Substations in Saudi Electricity Company Southern Operation Area (SABYA S/S)
132/13.8 KV GIS Substations in Saudi Electricity Company Southern Operation Area (JIZAN INDUSTRIAL S/S)
132/13.8 KV AIS Substations in Saudi Electricity Company Southern Operation Area (BILGURISHI S/S, KKUC S/S and EXTENSION OF MISQI S/S).
Work field
1. Power and Control Cable Raceway (Cable routing).
2. Load calculation for Power and Control Cable Raceway.
3. Electrical Equipments Arrangement.
4. Substations General Layout (GIS or AIS).
5. Wall Openings and Cutout Floor.
6. Coordination between Electrical, Civil and Architecture Departments.
7. Preparing Bill of Quantity.
Substations:-
110/13.8 KV GIS Substations in Saudi Electricity Company Western Operation Area (Al-HARAMAIN S/S, ICY4 S/S, Al-AMAL S/S, SHORAN S/S, Al-NUZLA 2 S/S, ICY5 S/S, BADER S/S, BANI NAJJAR S/S and AL ANDLUS S/S)
132/13.8 KV GIS Substations in Saudi Electricity Company Western Operation Area(TABOUK S/S # 1&7, TABUK 5-B, TABUK 10 and TABOUK UNIVERSITY S/S )
132/33/13.8 KV GIS Substations in Saudi Electricity Company Southern Operation Area (SABYA S/S)
132/13.8 KV GIS Substations in Saudi Electricity Company Southern Operation Area (JIZAN INDUSTRIAL S/S)
132/13.8 KV AIS Substations in Saudi Electricity Company Southern Operation Area (BILGURISHI S/S, KKUC S/S and EXTENSION OF MISQI S/S).
September 2006
To September 2007
Electrical Design Engineer
at Electro Technique (ET)
Location :
Egypt - Cairo
Electro Technique (ET) is one of leading company in electric power trading and industries, specialist on panel builder manufacture and trading for electric power, control, protection & automation serving power sector of power plant, substation, and automation.
Work field
1- Earthing.
2- Power and Control Cable Raceway
3- Electrical equipment Arrangement
Substations:-
Turbine Inlet Air Cooling For Block (E), (C), (D) and (F)132/4.16/0.48 KV in Riyadh Power Plant-9 Saudi Electricity Company Central Operation Area.
Work field
1- Earthing.
2- Power and Control Cable Raceway
3- Electrical equipment Arrangement
Substations:-
Turbine Inlet Air Cooling For Block (E), (C), (D) and (F)132/4.16/0.48 KV in Riyadh Power Plant-9 Saudi Electricity Company Central Operation Area.
Share on Facebook
Share on Twitter
Share Via Email