project manager
Al Shirawi Group Of Companies
Total years of experience :12 years, 7 months
1. Worked for various clients : Merras - Nakheel - ADNOC - ENOC - EMARAT - Dubai holding investments - Dubai properties
2. Handled petrol pump projects for ENOC - Emarat - ADNOC works for building, infrastructure including steel structure, cladding, tanks, building concrete, aluminum & connection.
3. Maintaining project cost within budget by following up continuous monitoring for cost control resources expenses
4. Following projects invoices submission, certification & payment by ensuring continuous site wapproval on time
5. Getting project start on time from getting client design NOC & trial pits till completing project & DLP along with all related payments
6. Worked infrastructure network with various diameter for sewerage - irrigation - potable waterwater - fire fighting
7. Completed earth & roads work including asphalt - tiles - granite - kerbs
8. Maintaining always safe project environment for all team as site for avoiding fines & injuries
Client : RTA
Consultant : Parsons
Joint Venture : ChinaState
1. Handling Dubai Intelligent traffic system 2020 project all over Dubai city by supervising civil, electrical project engineers and manpower as per requirements
2. following up for all drilling works HDD - NDRC
3. Check progress program & schedule and overseeing quality control, ensuring that all materials used and work performed are as per specifications
4. Coordinate with government authorities like DEWA, RTA, Military, DUSUP, DOLPHIN, Police, DM for NOC, Permits and ensure all Work Permit conditions are fully adhered by site team.
5. Ensure health and safety followed by site staff site.
Client: DEWA
Project: Meydan Canal Gate ( direct & LILO circuit)
Approved Engineer by :
Dubai Electricity & Water Authority(DEWA) (132 & 11KV)
Roads & Transport Authority (RTA)
1. Handled different projects (Creek Harbour - Dubai Meydan Canal Gate) by supervising site engineers and manpower as per requirements for surveying setting out, leveling and excavating, duct bank arrangement, trough placement, sand bedding, laying infrastructure electricity HV/MV cables 11/33/132KV, jointing, sand filling, cover placement, backfilling, link box, route marker and reinstating (grass, tiles, asphalt) as per specifications.
2. Responsible for all drilling works HDD - NDRC as an approved Drilling Engineer by DEWA.
3. Check plans, drawings and material submittals for accuracy of calculations and overseeing quality control, ensuring that all materials used and work performed are as per specifications, also Preparation of measurement sheets, site progress report, quotations and overtime sheets
4. Coordinate with government authorities like DEWA, RTA, Military, DUSUP, DOLPHIN, Police, DM for NOC, Permits and ensure all Work Permit conditions are fully adhered.
5. Ensure health and safety on site and coordinate for safety issues with HSE manager.
6. Attending weekly progress meetings with various government & project parties
dewa works
- Projects :
a) Arabian Ranches 2 - Shallow Services and Internal Roads - Package 2,
Value : 95, 000, 000 AED - Client : EMAAR - Consultant : Parsons
b) R977 - RTA Various Improvements and Implementing Quick Wins
Value : 55, 000, 000 AED - Client : RTA - Consultant : Alturath
1. Laying infrastructure services & networks (water, electricity LV-MV-HV, irrigation, fire fighting, telecom, sewerage, gas line)
2. Preparing road works (formation, sub base, curbstone, road base, asphalt design & laying) streetlight, sign boards, traffic lights, hydraulic system & road markings.
3. Coordinate with government authorities (DEWA, RTA, DM, Tarakhess, JAFZA) for NOC, Traffic Diversions & Permits, also Co-ordination with client, consultant, sub-contractors, suppliers, site staff and other departments managers to ensure overall company effectiveness
4. Ensure health & safety on site with HSE manager.
1. Receive samples from customers and ensure they are well identified and in a proper sequence, Follow-up laboratory tests of various construction materials including soil, aggregate, concrete, asphalt, steel, tile, wood, plastic ...etc
2. ِِPrepare asphalt mix design by Following Standards (BSEN - BS - AASTHO - ASTM).
3. Inspect equipment, machineries and tools to ensure it is safe and proper used and Ensure tests are carried out in accordance with relevant standard test methods and according to agreed customers’ requirements.