Ahmed Abdelwahab, IMAR, Engineering Consultants

Ahmed Abdelwahab

IMAR, Engineering Consultants

IMAR, Engineering Consultants

Location
Egypt - Cairo - 10th of Ramadan
Education
Bachelor's degree, Electrical Power Engineering and Machinery
Experience
35 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :35 years, 7 Months

IMAR, Engineering Consultants at IMAR, Engineering Consultants
  • Saudi Arabia
  • December 2015 to December 2021

(KSA) (from 05/12/2015 until 15/12/2021), Electrical Consulting
Engineer Site Manager at the Ministry of Finance in a Power Plant Project new Installation
Consists of an 8th Diesel Generators sets every one 4.2MW/13.8KV/60Hz, 900rpm and its all Auxiliaries.

Electrical Consulting engineer at Consulting Offices (Alzaid)
  • Saudi Arabia
  • March 2014 to December 2015

(from 01/03/2014 until 1/12/2015) Electrical Consulting engineer at the
Ministry of Health (Hospital) and Ministry of Higher Education. At the Following : (M.V and LV
Power Plant), Generators, Transformers, ATS, RMU, MDB, EMDB, UPS, Earthling Sys. Lightning Sys.
And (Low Current) Like: I.P Telephone Sys., F.A.S., Data Sys. C.C.TV, Public Address Sys. M.A.TV,
C.A.TV, Clock Sys. & B.M.S. .

Site Project Manager at Al-Taif for Installation, Operation and Construction Co.
  • Saudi Arabia - Riyadh
  • November 2008 to March 2014

Project manager Responsible for operation
And maintenance and installation, (KSA)(from 08/11/2008 Until 08/03/2014) In Olympic Committee
And Sport Cities & Swimming pools, Soccer Fields and MV Switchgear & Low Voltage DB. In the Sites
Of the General Presidency for Youth Welfare.

Electrical Maintenance Engineer at National Telecommunication Co. Ltd.(Natel)& Delta Electromechanical Co.
  • Saudi Arabia - Alqasim
  • April 1996 to April 2008

Electrical Maintenance Engineer of Power Plant, (KSA) (from 10/04/1996 until 30/04/2008) Overseeing maintenance Programs and operation for Television Broadcasting Stations project (TV Station) to transformers, switch gear(ATS's), generators Sys.(2Generators Caterpillar each 900KVA /380V /3ᴓ), and its control panels, Aux. etc., Uninterruptible Power Supply 60KW(UPS), Studio Control Lighting, Low Voltage Device, Water pumps, Air Compressors, Chillers(3x120Ton's), AHU's, FCU's and all related accessories.

Electrical Maintenance Engineer in MV Power Plant at Iman Trading & agencies & contracting Co
  • Saudi Arabia - Alquryat
  • October 1992 to November 1994

Electrical Maintenance Engineer in MV Power Plant, (KSA) (from 23/10/1992 until 30/11/1994) Operation and Maintenance of Radio Broadcasting Stations Affiliated to the Ministry of Information in the field of Generator power station 11KV. Each
Generator 3.5MVA (6 generators -diesel engine, 4Gen. Synchronizing), (Oil, SF6) CB's & Operation, Maintenance and Calibration of Protective Devices & Transformers & Batteries and related Accessories.

General of Electrical Engineer (Hospitals) at Walled Alyahyai establishment for trading
  • Saudi Arabia - Qatif
  • March 1990 to January 1992

General of Electrical Engineer (Hospitals), (KSA) (from 1/3/1990 until 31/1/1992) Head of the Department of electrical and electronics of the of Saudi hospitals : In Generators, switch gear, Automatic Transfer Switches (ATS), control panels, Low Current devices, elevators, …etc.

Electrical Power Engineer at General Company for Food Trade: Electrical Power Engineer
  • Iraq - Basra
  • October 1986 to January 1990

(Iraq) (from 26/10/1986 until 24/1/1990) Responsible Department Working and Operating Complex Refrigerated Warehouse and Frozen and Consequently: Freezing and Cooling Stores (10 Stores, each capacity 2000tons), Cooling Towers, Water Pumps, 4Electrical Generators (Pillar each 500KVA), ATS's, Transformers (4x500KVA), MV Switch Gears, Lightings, All control panels and all related accessories.

Electrical maintenance engineer in Glass factory at El-Nasr Company for electric and electronic "equipment's" Philips”
  • Egypt - Alexandria
  • March 1982 to January 1985

Electrical maintenance engineer in
Glass factory, (Egypt) (from 27/3/1982 until 24/1/1985). Installation and Overall there are two Generators
(Cummins each 500KVA /380V /3ᴓ), ATS's, Electric Crane, Air Compressors, Water pumps &
Temperature, levels, Pressures Transmitters and Controller of Glass Furnaces and all related accessories.

Education

Bachelor's degree, Electrical Power Engineering and Machinery
  • at Menufia University
  • January 1981

Specialties & Skills

Electrical Panels Design
Word Excel Access & AutoCAD
HVAC Control & Repairing
Panels Design Installation testing& Commissionin
Electronic Boards Repairing
MS Office (Word, Excel, and Access)
ETAP Power Station and Load flow, short circuit, Coordination &Protection relay setting
HVAC System & Split units and AHU Systems
AutoCAD & Dialux & Load Calculation
Electrical Design, Installation and commissioning. Also Electronic Circuits Repairing

Languages

Arabic
Native Speaker
English
Intermediate

Training and Certifications

Oscilloscope and its application (Training)
Training Institute:
Electronic Industries Research and Development Center (Egypt)
Date Attended:
November 1984
Duration:
60 hours
Automatic control (Training)
Training Institute:
Electronic Industries Research and Development Center (Egypt)
Date Attended:
February 1984
Duration: