QC Engineer
Nov Tuboscope
Total years of experience :15 years, 9 months
Inspection and control the tool in service petroluem companies by using a certified NDT level 2 (5 Methods).
Quality Control Engineer for poles and galvnizing steel ..
QA/QC Engineer for P.E.T for packaging materila thats made from plastic (polymers) .
29 Jun. 2008 - Building and Construction of pressure vessels and 17 July 2008 pipelines in the branch of Egyptian Natural gas co. in ALEX.
8 Aug. 2008 - 21 Aug. 2008 Determination, Treatment and Safety of oil production, and controlling it by DSC in the field of Qarun Petroleum co.
11 Jul. 2010- 29 Jul. 2010 Quality control of pipelines by using the four inspection methods (MT, PT, UT, RT), and How to read the radiographic films in Egyptian Natural gas co.
Methods of welding, Types of its Defects and weld oil pipelines, Construction of pipelines by using
Flanges and valves, Construction of natural oil 's
Storage tanks and Treatment stations in Qarun Petroleum
co.
2006- 2011 Cairo University B.Sc. of Metallurgical Engineering. Cumulative grade: Good. Graduation Project: Hyper-Eutectic Aluminium-Silicon Alloys. Project Grade: Excellent. Under Supervision: Prof. Dr. Salah Ezz