QA/QC Manager
Archirodon construction overseas
Total years of experience :23 years, 6 months
• Review of Contract documents for the preparation of Quality programs
• Preparation and assesses the implementation of Project Quality Plan (PQP), Inspection & Test Plans (ITP), system procedures, material submittals and other QA/QC documentation as per Scope of Work and ensure compliance as per contractual requirements.
• Liaises, attends meeting and maintains close contact with the Employer’s quality representative regarding quality matters on site and/or as affecting the work.
• Manages and coordinates all quality activities on site, including assignment of quality personnel (QC Engineers, QC Inspectors, Document Controllers, and 3rd Party Testing/Inspection Company) to particular activities / work areas on site .
• Controlling that all the materials delivered at site have been inspected and ensure its compliance with P.O, approved drawings and specification in addition to coordinating the relevant Tracking Systems for correct identification of materials.
• Fully liaising with PM / Construction Manager / Quality Engineers on daily basis to assisting Project personnel to identify problems and potential or actual non-conformances and monitor the effectiveness of the corrective and preventive actions undertaken.
• Issuance of NCRs in case of noncompliance through Cooperating with the Project Quality Engineer (PQE) to analyses of non-conformities.
• Coordinate with all disciplines of Execution Teams and Contractors for Quality related matters
• Ensuring that all measuring and testing equipment are under the control of the Quality Department in the correct equipment calibration management and such records are available.
• Conduct and /or Participate in Quality & Technical meetings with clients Sub-Contractors or Vendors
• Participates in Internal Quality Audits as part of the audit team.
• Participate in the process of evaluation to approve vendors as Company's suppliers.
• Arrange training programs for the education of Staff on Quality related areas to update their skill and knowledge to develop Quality & Safety culture.
Reconstruction Of Tripoli Port Breakwater (220 Million American Dollars).
1- Implementation of Company Quality Management System.
2- Review of Contract documents for the preparation of Quality programs.
3- Preparation of Project Quality Plan (PQP), Inspection & Test Plans (ITP), system procedures, work instructions, method statements, material submittals and other QA/QC documentation as per Scope of Work and ensure compliance as per contractual requirements.
4- Ensure the inspections of materials before acceptance as per ITP and applicable Standard/Specifications.
5- Check that all materials used in the project delivered at site have been inspected and ensure its compliance with P.O, approved drawings and specification.
6- Closely monitoring of site activities and fully coordinates with PM / Construction Manager / Quality Engineers on daily basis.
7- Issuance of NCRs in case of noncompliance.
8- Coordinate with all disciplines of Execution Teams and Contractors for Quality related matters.
9-Preparation & review of method statements
10-Conduct and /or Participate in Quality & Technical meetings with clients Sub-Contractors or Vendors.
11- Participates in Internal Quality Audits as part of the audit team.
12- Participate in the process of evaluation to approve vendors as Company's suppliers.
13- Arrange training programs for the education of Staff on Quality related areas to update their skill and knowledge to develop Quality & Safety culture.
• Project 1- Construction and Finishes for 74 Villa and 100 Townhome in Marassi - Emaar Project
• Title Senior Quality Control Engineer
• Site Sidi Abd Elrahman-North Coast-Egypt
• Owner Emaar Misr
• Main Contractor ARABTEC Egypt for construction
• Owner Consultant Engineering Consultant Group (ECG)
• Project Managment Turner Construction International
• Responsibilities
1- Establishing and maintaining ARABTEC quality management system in accordance with ISO 9001
2-Supervision for all civil construction activities (R.C. footing,
R.C. columns, beams, earth work, steel reinforcement work and formwork…) are according to specification and drawing and soil test
3-Checking Reinforcement steel details at site as per approved shop drawings and Specs
4-Make inspection for finishing activities (Block works,
Plaster works, Paint, ceramic…)
5-Supervision of the concrete casting and testing.
6-Review of testing reports for Project Materials & check of
material arriving to site before using it
7- Follow up progress according to time schedules
8- Follow up IR, NCR, RFI, Material reports.
9-Preparation & review of method statements, quality plans, Inspection and test plans.
• Project 1: Reconstruction Of Tripoli Port Breakwater (220 Million American Dollars).
• Title Senior Quality Control Engineer
• Period June 2009 - Till Now
• Site TRIPOLI, LIBYA
• Owner
Libyan Maritime & Port Authority
• Consultant ROYAL HASKONING ( HOLLAND)
• Responsibilities
1-Ensuring that Archirodon quality management system is established and maintained in accordance with ISO 9001
2- Checking construction procedures for execution of Breakwater, Pre-cast Concrete cubes and accropodes, parapet walls and permanent site facilities
3- Carrying out routine tests for rock to be used in breakwater construction such as grading test, dimensional ratio test, drop test
4-Follow-up of the concrete casting and testing
5- Quality Control on batch plant and laboratory activities
6-Checking Reinforcement steel details at site as per approved shop drawings and Specs
7-Follow up the tests and inspect of the materials arrived to the site
8-Preparation and follow up NRI, NCR, RFI, Material Receiving reports.
9-Preparation & review of method statements, quality plans, Inspection and test plans.
•Project 1- (Quay Wall Construction) For New Container Terminal at Damietta Port In Egypt (320 Million American Dollars).
•Owner 1- Damietta International Ports S.A.E 2- KGL-Ports International
•Main Contractor Archirodon Construction Overseas Company
• Site Damietta, Egypt
• Title Quality Control Engineer
•Responsibilities
1-Ensuring that a quality system is established and maintained in accordance with ISO 9001
2- Checking construction procedures for execution of diaphragm walls & bored Piles
3-Follow-up of the concrete casting and testing
4- Quality Control on batch plant and concrete laboratory activities
5-Preparation and follow up NRI, NCR, RFI, Material and Other reports.
6-Preparation & review of the method of statements, work procedures, quality plans, Inspection and test plans, construction plans
7-Checking Rft. steel details as per approved shop drawings and Specs
8-Follow up the tests for the civil works and materials arrived to the site
•Project 1- Construction of Administration Building for National
Petrochemical Company( 22, 000, 000 Saudi Riyals)
•Owner National Petrochemical Company ( NATPET )
•Main Contractor GAP INSAAT (Part of calik group in turkey)
•Owner Consultant Abiat -Delta Egypt consulting office Joint venture
contract
•Site Saudi Arabia-YANBU
•Title Consultant Engineer
•Responsibilities
1-Supervision for all civil construction activities (R.C. footing,
R.C. columns, beams, earth work, steel reinforcement
work and formwork…) according to specification and
drawing and soil test.
2-Make inspection for finishing activities (Block works,
Plaster works, Paint, ceramic…)
3- Follow up NRI, NCR, RFI, Material and Other reports.
4- Follow up progress according to time schedules
5-Supervision of the concrete casting and testing.
6-Review of testing reports for Project Materials& check of
material arriving to site before using it
• Project Construction of Hamma Sea water desalination plant (turn key project) (200 Million American dollar).
• Owner Ministry of Water Resources (H.W.D)
• Main Contractor Contract Joint-venture Between Orascom construction industries Algeria and Besix company
• Site Algeria
• Title Site engineer.
• Responsibilities
1-Execution of all Civil construction activities (R.C. footing,
R.C. columns, beams, earth work, steel reinforcement
work and formwork…) according to specification and
drawing and soil test.
2-Coordination With Batch plant for concrete Mixes &
quantities
3-Develop and lead the team of work to identify their jobs
4-Review the invoices of sub contractors before payments
5-Handling over all items to consultant
Technical Office engineer
January 2005 - July 2005
· Project : Western Libya Gas Project / Mellitah Plant (Agip Gas)
· Main Contractor : HYUNDAI Engineering & Construction Co.
· Site : Libya
· Sub-contractor : MHDA General & Industrial Contracting Company
· Title : MHDA Site & Technical Office Engineer.
· Project : El Khoms - GMR1 (400 Kv T/L)
· Main Contractor : KEC International Limited.
· Site : Libya
· Sub-contractor : MHDA General & Industrial Contracting Co.
· Title : MHDA Technical Office Engineer.
· Project : Al Rewees - Shakshouk (220 Kv T/L).
· Main Contractor : ELPCO
· Site : Libya
· Sub-contractor : MHDA General & Industrial Contracting Co.
· Title : MHDA Technical Office Engineer.
· Project : Al Zahra - Al Harsha (220 Kv T/L).
· Main Contractor : ELPCO
· Site : Libya
· Sub-contractor : MHDA General & Industrial Contracting Co.
· Title : MHDA Technical Office Engineer.
• Project 1- Construction & raising the efficiency of dair mouas &
ELwasty train station (3, 000, 000L.E) (turn key project).
• Contractor Nile company for construction & pavement
• Site Egypt
• Title Quality Control Engineer.
• Responsibilities
1-Make inspection for all civil construction activities (R.C.
footing, R.C. columns, beams, earth work, steel
reinforcement
2-Make inspection for finishing activities (Block works,
Plaster works, Paint, ceramic…)
3-Review of testing reports for Project materials
4-Follow-up of the concrete casting and testing.
5-Follow up progress and adjusted schedules Effective in
facilitating communication between management, project
team and consultants
• Project 1- construction & finishing of choueifat international school (6 October City) (9, 000, 000 L.E)
2- Construction & finishing of a covered hall for playing (6, 000, 000L.E) (turn key project) (Saloum).
3- Construction & finishing of a feeding building for military forces officers (500, 000L.E) (turn key project) (Saloum)
4- Construction & finishing of an office building for military forces officers (300, 000 L.E) (turn key project) (Saloum)
5- Construction & finishing of Mubarak Olympic Village (22, 000, 000 L.E) (turn key project )
6- construction of concrete sheds for heavy duty equipments for military forces (4, 000, 000 L.E)
• Contractor MHDA General & Industrial Contracting Co.
• Site Egypt.
• Title MHDA Site engineer.
Civil engineering