Operations Director à Trojan Concrete
  • Egypte - Le Caire
  • Je travaille ici depuis mai 2020
Precast Division Manager à Fibrex Precast
  • Émirats Arabes Unis - Abu Dhabi
  • avril 2007 à novembre 2018

Key Projects to Credit:
• Al-Rreef Villas Project, ARV, Abu Dhabi, UAE
• Yas Retail Mall, YM, Abu Dhabi, UAE
• Baynunah Academic Complex, BAC, Zaid City, UAE
• Al-Rreef Down Town Project, 46 Buildings, Abu Dhabi, UAE
• Qusahwira Development Project, Qusahwira, UAE
• Deerfield’s Town Square Mall, Abu Dhabi, UAE
• Emirates National School, Sharjah, UAE
• Abu Dhabi Shooting club Project, Abu Dhabi, UAE
• Khalifa University Extension, Abu Dhabi, UAE
• Abu Dhabi Central Market Project, Abu Dhabi, UAE
• Al Bateen Airport Project, Abu Dhabi, UAE
• Alreef 2 Villas Project, ARV2, Abu Dhabi, UAE
• Other Private projects in Abu Dhabi, UAE

Highlights:
• Successfully managed new projects like ARV, YM and BAC and overcome key challenges like different designs depending on the needs of each project, large employment and training and used good planning techniques in project overlaps.
• Accurately estimated manpower and equipment requirements to conclude projects on time and within budget.
• Contributed to new revenue streams by redesign of traditional work to precast work and application of value engineering.
• Considerably Improved the project execution time from tender stage to handover to the clients.
• Received appreciation letter from Six Construct Co. Ltd. for successfully executing precast concrete works, in Yas Mall project.

Key Responsibilities:
• Carry out detailed analysis to prepare an exhaustive list for manpower, materials, equipment, staff and engineers including overhead costs for the project.
• Develop design, shop drawings and connection details for all precast types, mould designs with the help of AutoCAD as per the drawings and program, precast guide specifications according to PCI specification.
• Prepare financial and progress reports, daily, weekly and monthly reports on all production and erection progress including initial labors rate analysis.
• Design training programs for the employees, based on the training needs of the employees, to fulfill business targets and requirements.
• Develop mix designs in coordination with laboratory and ensure timely approval of the same from appropriate authority, prepare quality manual and method statements of the company for production and erection.
• Supervise the work of team of engineers, draftsmen and foremen for pricing and planning the scope of work and was responsible for timely execution of all precast activities within cost, quality and PCI standards.
• Ensure procurement of materials at the right time and storage in the right place strictly in compliance with goods receiving control procedure.
• Comply with company quality management system in accordance with the requirement and recommendations of the quality assurance /quality control manager at each and every stage.
• Follow calibration procedure and schedule for the instruments, used by the employees, in taking measurements and conducting tests.
• Ensure timely payment of sub-contractors and clients, as per agreed time schedule specified in the contract, for smooth workflow.
• Prepare profit and loss accounts and balance sheets, carry out analysis for assessing financial stability, profitability & productivity.
• Submit half yearly and monthly budget to the operations manager, for scrutiny and approval, before implementation of the same.
• Motivate the team members of sales, service, projects, safety, production, logistics, erection, delivery, human resources and finance to help them achieve their goals within the defined timeline.
• Coordinate with the safety engineers to ensure safety procedures are followed by every department and implement factory safety plans at site.

Precast Engineer à Alfara’a Precast
  • Émirats Arabes Unis - Abu Dhabi
  • novembre 2004 à mars 2007

Key Responsibilities:
• Prepared production plan, along with resource requirements in advance to fulfill production targets, monitored daily production output, resolved problems encountered during production and ensured implementation of quality control system.
• Instituted and implemented appropriate quality control system to meet the quality specifications of input materials procured from local and international markets
• Coordinated and followed up with technical team to ensure that all drawings required for production were released in time to meet production schedule.
• Collected data on requirements from concerned persons and carried out detailed analysis to determine the right and safe capacity of cranes.
• Supervised the work of the erection team of precast units, such as H.C. slab, cladding panel, boundary wall, domes and manholes and provided technical guidance.
• Was responsible for civil, architecture and electro-mechanical works at project site to ensure smooth progress of work as project schedule by resolving erection and site obstructions.
• Provided technical support to the client regarding precast units, both during project execution as well as post completion of project.

Resident Engineer à Ministry of Defence & Aviation
  • Arabie Saoudite - Riyad
  • septembre 2003 à novembre 2004

Key Responsibilities:
• Coordinated all the site activities and resolved day to day problems at site to improve coordination and smooth progress as per schedule.
• Provided technical guidance to the site team and ensured execution of work meeting all the quality specifications and standards.
• Followed up with the procurement department to ensure availability of the construction materials of right quality as per requirement schedule.
• Prepared daily, weekly and monthly reports on status of various site activities and submitted the same to the senior management for feedback and advice.
• Studied and scrutinized drawings and specifications to provide clarifications to the contractor and team for compliance with the same.
• Arranged manpower and other resources required for execution of work at site, as per actual requirements, ensuring proper and full utilization.

Construction Manager à Ministry of Housing, Utilities and Urban Communities
  • Egypte - Le Caire
  • mars 1999 à septembre 2003

Key Responsibilities:
• Developed design and drawings to match the requirements of community housing and utilities within budget amount and time schedule.
• Worked out the bill of materials, along with complete material specifications, to meet the requirements as per design, local and international standards.
• Prepared project plan and schedule, comprising all the activities involved, their durations and interdependencies, identifying the critical path.
• Explained the project schedule and drawings to the construction team members at the outset of the project to ensure their involvement.
• Monitored daily progress of construction of work and resolved constraints faced during execution to ensure timely progress and control actual expenses.
• Conducted periodic review meetings, involving external agencies, internal team members to improve coordination and ensure completion of the project conforming to project specifications within approved budget and schedule.

Site Engineer à Negeda Contracting
  • Egypte - Le Caire
  • juin 1996 à mars 1999

Key Responsibilities:
• Developed the project site by undertaking necessary site clearance, labeling and dressing, construction of site office and utilities.
• Studied and scrutinized construction drawings and material specifications to provide clarification to the contractor and project team.
• Coordinated with procurement team and provided delivery schedule of construction materials to ensure uninterrupted availability.
• Arranged inspection of plant and machinery and incoming materials to ensure their qualities match the specifications as per project documents.
• Liaised with local electricity authority and other government authorities to arrange electric connection and obtain necessary permits to undertake construction work.
• Managed and coordinated all the site activities and resolved all site related problems to ensure uninterrupted progress of project.

Éducation

Baccalauréat, Civil Engineering
  • à Zagazig University
  • novembre 1996

MEMBERSHIPS: • 2017: License for Unlimited Buildings ( Dubai Municipality) • 2012: Membership, (Society of Engineers) • 1997: Membership, (Egyptian Syndicate of Engineers)

Specialties & Skills

Civil Engineering
Project Management
Construction Management
Quality Control
Production
Technology, Customer Service, Production Cost, Product Quality, Inventory Control
Quality Control, Contract Documentation, Labour Productivity, Operational Profitability
Leadership, Team Management, Coordination, Analytical Ability, Problem Solving, Decision Making
Precast Design, Structural Analysis, Scheduling, Planning, Direction, Safety Management
Project Evaluation, Cost Benefit Analysis, Onsite Management, Resource Utilization, Coordination
Tender Drawings, Specifications, Estimation, Bill of Quantities, Method Statements
Vendor Management, Negotiation, Procurement, Material Efficiency, Budgetary Control
MS Project, AutoCAD, MS Office, Internet Applications

Langues

Anglais
Expert
Arabe
Expert

Formation et Diplômes

Oct 2007: IELTS Preparation (Formation)
Institut de formation:
British Council Teaching Centre, UAE
May 2005: Total Quality Management ( Society of Engineering, Abu Dhabi) (Certificat)
Jun 2009: Project Management Professional, (Abu Dhabi, UAE) (Certificat)