Lead Technical Support Engineer EIB/KNX division
MTTS (Modern Times Technical Systems)
Total years of experience :16 years, 0 months
Leading a team of engineers dedicated to design & estimation of lighting control System according to client needs.
• Assisting the design engineer by consulting and discussing conceptual & cost effective ideas with the client.
• Selection of appropriate control devices & preparing bill of material/ quantity based on the
Engineering drawings and arranging material using the just in time technique.
• Responsible for technical review of controllers, instruments and other outsourced items.
• Planning and supervising every stage of design from device selection to the final panel
Testing.
During project execution, working as a project coordinator, monitoring work procedure, safety and technical troubleshooting besides managing and assigning daily work, checking work progress and directly report to Client’s responsible of Engineering Projects.
Preparing software and complex logics according to client’s need to achieve a flexible and user friendly system
‐ Solely responsible for the dimming & lighting control system for 3 main buildings including
the residential Building in the palace
‐ Supervised the subcontractors for the termination of lighting control panels
‐ Prepared software for all the buildings and assigned suitable light scenes for different
Rooms in coordination with the
a Jeddah based company which carries out projects throughout
Saudi Arabia in Industrial Automation that includes programming PLC’s of major brands like Siemens,
GE‐Fanuc and Allan Bradley, installation and commissioning.
• Assisted the project engineer to develop ladder logic according to the client requirements using
SIMATIC manager.
• Assisted in Preparation of all required graphics and creating HMI interface for projects.
• Worked with a team of engineers to prepare (SCADA) Supervisory control and data acquisition
for substations and power plants.
Responsible for installation, set-to-work, maintenance and troubleshooting of Marine electronic equipments (Radar, Echo Sounder, HF and VHF sets etc) installed on PCG Boats.
• Involved in the Installation of Marine Power Generation and Distribution System.
• Supervising the installation of Parameter Monitoring & Safety Circuits for Main Engines
• Reading Lighting & Power Layout Plans for the boats and supervise the subcontractors to pull cables and conduits according to the plans
• Installation and rectification of control circuitry used for various Marine electrical equipments
(Pumps, Motors, Exhaust blowers etc).
• Maintenance of Battery Chargers, Motors and all other Electrical and Electronic equipments related to Boats.
Field Assignments:
Inspection of HP (High Pressure), LP (Low Pressure) & MP (Medium Pressure) Ajax
Compressors at Bobi Oil & Gas Field (OGDC), Sanghar, Pakistan
Analyzed Murphy panel used for monitoring and safety of various parameters related to
Ajax Compressors.