Total Years of Experience: 13 Years, 5 Months
January 2013
To Present
PM
at ESTC
Location :
Saudi Arabia - Riyadh
• Increased the company growth by securing new partners, consulting engagements and by delivering new projects.
• Capable of leading high performing teams under tough deadlines, to meet expectations of multiple customers.
• Problem solver - Creativity and forethought in solving complex project issues
• Organizational ability and multi-tasking skills.
• Managed budget for the organization to influence organization's financial profitability
• Capable of leading high performing teams under tough deadlines, to meet expectations of multiple customers.
• Problem solver - Creativity and forethought in solving complex project issues
• Organizational ability and multi-tasking skills.
• Managed budget for the organization to influence organization's financial profitability
April 2012
To December 2012
Network Design Engineer for Ericsson
at MMASE
Location :
Saudi Arabia
" Fully commands in Telecordia Ne (Network Engineering Tool)
" Design RF as well as Transmission
" Design core layer RNC
" Creating Modules in Ne (Network Engineering Tools) according STC Data
" Preparation of the Reports relating to the completion of Tasks
" Updating the records in Network Engineer Tool (Telcordia) USA
" Place the structure and Equipments (like BTS, tower, antenna etc&)
" Design power equipment (like rectifier and Batteries)
" MOP Migration in NE.
" Design RF as well as Transmission
" Design core layer RNC
" Creating Modules in Ne (Network Engineering Tools) according STC Data
" Preparation of the Reports relating to the completion of Tasks
" Updating the records in Network Engineer Tool (Telcordia) USA
" Place the structure and Equipments (like BTS, tower, antenna etc&)
" Design power equipment (like rectifier and Batteries)
" MOP Migration in NE.
July 2011
To January 2012
2G RF Engineer/ Field Engineer
at SNG Telecom
Location :
Pakistan - Islamabad
" Installation and Configuration of Huawei RTN 910 and 950
" MICROWAVE: Assembling 0.3m, 0.6m, 1.2m, 1.8m, installation and alignment according to the Design.
" Using site master (FREQ/VSWR & DTF).
" Using software TEMS Investigation 9.0
" Done drive tests and Scanning for new sites and on air using TEMS Drive testing Kits in idle and dedicated modes for single and cluster sites.
" Used MapInfo for the post processing of drive tests.
" New site survey according to nominal plan to decide the most appropriate site location, Site Auditing for existing sites to verify site database and cell design criterias (checking Azimuths, Mechanical & Electrical tilts, Panoramic views etc.)
" Determine actual network coverage & performance by Drive test using Drive Test Tool TEMS.
" MICROWAVE: Assembling 0.3m, 0.6m, 1.2m, 1.8m, installation and alignment according to the Design.
" Using site master (FREQ/VSWR & DTF).
" Using software TEMS Investigation 9.0
" Done drive tests and Scanning for new sites and on air using TEMS Drive testing Kits in idle and dedicated modes for single and cluster sites.
" Used MapInfo for the post processing of drive tests.
" New site survey according to nominal plan to decide the most appropriate site location, Site Auditing for existing sites to verify site database and cell design criterias (checking Azimuths, Mechanical & Electrical tilts, Panoramic views etc.)
" Determine actual network coverage & performance by Drive test using Drive Test Tool TEMS.
June 2009
To August 2009
Maintenance Engineer on STC Microwave O&M Project
at ACES
Location :
India
" Perform Troubleshooting, Operation and Maintenance for Ericsson Mini-link Traffic Node(2P, 6P & 20P).
" Trouble shooting the Ericsson site fault handing in the field of operation and maintenance. I Know how to do PMR.
" Monitor and Troubleshoot alarms for Ericsson MMU2, MMU2B, MMU2C, MMU2F, MMU2D, ETU2, ETU3, LTU155e/o, LTU, LTU16x2, NPU8x2, NPU1B, NPU2 and NPU3.
" TX and RX Frequency, powers, Capacity, Modulation adjustments according to designs.
" Replacement of faulty boards MMU, LTU, TRU and NPU of all types
" Creation and deletion of traffic routings and re routing according to requirements.
" Trouble shooting the Ericsson site fault handing in the field of operation and maintenance. I Know how to do PMR.
" Monitor and Troubleshoot alarms for Ericsson MMU2, MMU2B, MMU2C, MMU2F, MMU2D, ETU2, ETU3, LTU155e/o, LTU, LTU16x2, NPU8x2, NPU1B, NPU2 and NPU3.
" TX and RX Frequency, powers, Capacity, Modulation adjustments according to designs.
" Replacement of faulty boards MMU, LTU, TRU and NPU of all types
" Creation and deletion of traffic routings and re routing according to requirements.
Share on Facebook
Share on Twitter
Share Via Email