Alden Real, Senior Electrical Engineer

Alden Real

Senior Electrical Engineer

Radiant Engineering Enterprises LLC

Lieu
Philippines
Éducation
Baccalauréat, Bachelor of Science in Electrical Engineering
Expérience
32 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :32 years, 10 Mois

Senior Electrical Engineer à Radiant Engineering Enterprises LLC
  • Qatar - Doha
  • Je travaille ici depuis décembre 2014

Maintenance Enforcement Program (MEP), electrical distribution design review, materials and cost review, work schedule monitoring and problem analysis

Technical Writer à Saudi Aramco, JAL OSS TSD
  • Arabie Saoudite - AlKhafji
  • juin 2013 à août 2014

1. Prepare technical work scope of Saudi ARAMCO projects for bidding purposes.

2. Review plans and drawings for the electrical equipments and fixtures indicated on the drawings to ensure that all the data is correct and with in international standard and codes. Propose changes if there is discrepancy on the standard & codes.

3. Ensure that all the MV and LV electrical equipments (transformers, LBS, switchgears, switchboard, panel board, motor control compartment, disconnecting panel and ring main unit); component devices and fixtures (fluorescent, hi bay, flood light, outlet, switches, emergency light, exit lights, smoke and heat detectors) and materials (wires, conduits, cable trays, splicing/junction box) are within SAUDI ARAMCO Standards and according to the approved plans.

4. Prepare the technical specification of materials, equipments, devices, fixtures, components, accessories needed in the projects and ensure that it is mention/written in the scope of works and/or in the drawings.

5. Prepare variation order, amendments and addendum on the scope of works if there is a discrepancy on the actual works and materials differences.

Electrical Engineer à Universal Technology & Environmental Co. Ltd. (UTE)
  • Arabie Saoudite - Jeddah
  • novembre 2011 à mai 2013

In-charge in all electrical works in the following projects
a. Sludge Treatment Plant - Yanbu, Kingdom of Saudi Arabia - 4.5MUSD
Installation of Horizontal Disc Dryer, Pelletizing Machine, Screw Conveyors, Packing machine, Thermal Oil Boiler, Pumps, Transformers, MV & LV Supply (Switchgear, Panels & cablings), Telephone & Data system, Fire Detection & Alarm system, Control & Instrumentation System, Overhead Cranes, External Lightings, grounding protections & Lightning protection systems.
b. Sewerage Treatment Plant - Al-Nabah, Kingdom of Saudi Arabia - 1.33MUSD
Installation of Transformers, MV & LV Supply (Switchgear, Panels & cablings), decanter machine, pumps, Telephone & data system, Fire detection & alarm system, Control & Instrumentation system, external lightings, grounding protection & lightning protection system.
c. Expansion of RO & Water Treatment Plant Project (30, 000 M3/day) - ARAR, Riyadh, KSA - 30MUSD
Installation of well pumps (9 units, 1kv, 130kw), 33 KV transmission pole lines (18 KM), Generator (4 unit, 1800 KVA, 13.8KV), transformers, Pumps, MV & LV Supply (Switchgear, panels & cablings), Telephone & data system, Fire detection & Alarm system, Control & Instrumentation system, Overhead cranes, external lightings, grounding protection & lightning protection system.
d. New RO & Water Treatment Plant - Abo Arish, Jizan Kingdom of Saudi Arabia - 35MUSD
Installation of 33 KV transmission pole lines (30 KM), Generator (4 unit, 1800 KVA, 13.8KV), transformers, Pumps, MV & LV Supply (Switchgear, panels & cablings), Telephone & data system, Fire detection & Alarm system, Control & Instrumentation system, Overhead cranes, external lightings, grounding protection & lightning protection system.

Supervisor à NOMAC
  • Arabie Saoudite - Jeddah
  • novembre 2010 à octobre 2011

To handle all works in preventive and corrective maintenance of plant machine, equipments and auxiliaries. Maintain communications and relations as are necessary to report on the status of matters requiring action and to ensure that corrective action is undertaken. Helps Maintenance Manager in executing corrective and planned maintenance with due regard to annual scheduled maintenance plan.

QC Team Leader à ResoluteCM Corp / AMEC Earth & Environment
  • Afghanistan
  • mars 2009 à avril 2010

To handle all QC works in construction of Dining Facility (DFAC), K-span building, Vehicle Maintenance building, Bath House, Medical building, Gymnasium, Theater, Barracks and officers barracks. And Supervise to Subcontractors in their day to day activities. Prepare, review and updates schedules with Project Manager, QC Manager & QC Superintendent to ensure that the projects and/or works by the sub-contractors are with-in the target dates. Monitoring, checking and evaluating the activities done by the sub-contractors. Supervise the work done by the QC Superintendent/Engineers in construction and safety works..

Facilities Unit Manager à HItachi Global Storage Technologies Philippines Corp.
  • Philippines
  • janvier 1999 à février 2009

I. To handle all works in the Facilities Department (Supervise Electrical, Mechanical & Civil)
II. To handle all works in the overall planning, operation, maintenance and safety of Facilities Equipment and their Manpower such as :
8 units - 1.50 MW, 6.6 KV, 3 Phase, YANMAR Diesel Engine Generator
5 units - 350 tons centrifugal Hitachi Chillers
4 units - 300 tons Centrifugal Mc quay Chillers
3 units - 200 tons Compressor Carrier Chillers
11 units - 75 KW Hitachi Air compressors
49 units - Air Handling units (AHU)
1 unit - liquid waste incinerator (not operational due to clean air act)
2 unit - Waste Water Treatment and recycled Water Treatment Plant
2 unit - Water Treatment Plant
3 unit - Power Substation (34.5 KV, 6.6 KV & 44O/220V & 180/110 V)

III. To handle all works in the construction of new buildings, renovation, modification of facilities and installation, commissioning and testing of new equipments used in the power generation and distribution.
IV. To ensure that the ISO 9001, 14001 & Safety procedures/standard shall practice/implement at the work place

Planning Foreman à Semirara Coal Corporation
  • Philippines
  • septembre 1997 à janvier 1999

To handle all works in the planning section of power plants for the monitoring, planning and implementation of plant operation and maintenance.
1. Responsible in the safety awareness of the employees, conduct emergency fire drill and evacuation, report emergency situation and investigate the incident/accident and make some countermeasure to prevent or eliminate the recurrence.
2. Responsible in the preparation of department budget for plant operation and maintenance and construction, renovation & modification works.
3. Responsible in the consolidation of plant budget form operation and maintenance section and responsible in the procurement/purchasing of the materials needed in the operation and maintenance of the plant.
4. Develops and maintain a cost-effective system of day to day preventive maintenance, repair and operation of plant equipment, machineries and Facility.
5. Plans, scheduled, review and implement preventive maintenance programs, methods and procedure in accordance with the establish standards and quality.
6. Control and maintain an effective and economical cost of maintenance, repair and replacement with in the budget.

Electrical Foreman à Semirara Coal Corporation
  • Philippines
  • février 1996 à août 1997

Responsible for the overall planning, leading, Organizing and Controlling of all Electrical/Electronic activities relating to the safe and efficient maintenance, repair and operation of all power generating units and its auxiliaries, such as;

2 units - 36 tons/hour Coal Fired Boiler (SGP)
2 units - 7.5 MW Steam Turbine Generator
2 units - 1.5 MW Diesel Engine Generator (NIIGATA)
1 unit - 1.2 MW Diesel Engine Gnerator (CUMMINS)

Electrical Foreman à Building Care Corporation / Asian Development Bank
  • Philippines
  • octobre 1991 à novembre 1994

Given an authority by the shift Engineer to handle all works regarding for the operation and maintenance of the machine equipments in the buildings such as;

5 units 4.16 KV, 380 Y / 220 V, 1 MW emergency stand by generator (Caterpillar); 5 units 34.5 KV / 380/ 220 V, 5 MW substation; 7 units 125 KVA uninterrupted power supply banks (UPS); 1 unit 380 V, 200 HP electrical Fire Pump; 1 unit 200 HP diesel fire pump, 4 units 350 tons, 380 v centrifugal chillers and 4 units passenger elevators.

Electrician à FAMVA Construction
  • Philippines
  • mars 1988 à mai 1990

1. Responsible in the installation of main power panel, distribution panel, power meter, lighting and outlets of the project contracted
2. Report to electrical Foreman all works completed and remaining works needed
3. Reading electrical plans, given by the electrical foreman for the projects
4. Lay out and installation of Conduits and wirings
5. Tapping of electrical wiring and main service entrance wire
6. Responsible in the checking/testing of the electrical power outlets and lighting fixtures

Éducation

Baccalauréat, Bachelor of Science in Electrical Engineering
  • à University of North Eastern Philippines (UNEP)
  • avril 1990

Langues

Anglais
Expert

Adhésions

Integrated Institute of Electrical Engineers of the Phils.
  • Life member
  • October 1994

Formation et Diplômes

Industrial Controls (Formation)
Institut de formation:
Meralco Foundation
Date de la formation:
November 1993
Durée:
45 heures
Industrial & Commercial Power System Design (Certificat)
Date de la formation:
June 1995
Short Course on Theory, Selection, Application & Maintenance of Transformers (Certificat)
Date de la formation:
October 1996
AutoCad (Formation)
Institut de formation:
Global Pinoy Solution, Jeddah, Saudi Arabia
Date de la formation:
August 2011
Durée:
48 heures

Loisirs

  • Playing Guitar, Playing chess and watching action movies
    awardees for chess tournament