Total Years of Experience: 9 Years, 2 Months
June 2016
To Present
Executive Sales Engineer
at Shirazi Trading Compny
Location :
Pakistan - Lahore
organizing sales visits demonstrating and presenting products
establishing new business
attending trade exhibitions, conferences and meetings
reviewing sales performance
negotiating contracts and packages
aiming to achieve monthly or annual targets
establishing new business
attending trade exhibitions, conferences and meetings
reviewing sales performance
negotiating contracts and packages
aiming to achieve monthly or annual targets
April 2015
To June 2016
Maintenance Supervisors / Engineers
at ICI Soda Ash
Location :
Pakistan
Organizing routine servicing schedules.
Allocating work to a team of fitters.
Checking and calibrating instruments to make sure they are accurate.
Fitting new parts.
Carrying out quality inspections.
Responding immediately to equipment breakdowns.
Allocating work to a team of fitters.
Checking and calibrating instruments to make sure they are accurate.
Fitting new parts.
Carrying out quality inspections.
Responding immediately to equipment breakdowns.
July 2014
To August 2014
Internee
at Pak Elekron Limited (PEL)
Location :
Pakistan - Lahore
Project Accomplished: Designed 3 Phase 30 MVA Power Transformer.
During the internship I was introduced with different stages of power transformer manufacturing including
i. Winding production,
ii. Phasing,
iii. Assembling and Testing.
Learned about different types of winding, Phase Sequence, Oil Filling Technique, Core Cutting, Vapor Phase Drying, Routine Tests, Type Tests, and Special Test.
During the internship I was introduced with different stages of power transformer manufacturing including
i. Winding production,
ii. Phasing,
iii. Assembling and Testing.
Learned about different types of winding, Phase Sequence, Oil Filling Technique, Core Cutting, Vapor Phase Drying, Routine Tests, Type Tests, and Special Test.
June 2013
To July 2013
internee
at ICI
Location :
Pakistan
Tasks Accomplished: During internship we were orientated with Safety Orientation Conferences & Time Management
lectures, after that we studied Single Line Diagrams (SLD) of whole ICI electrical network, then our team of internees
surveyed the Gas Turbines in ICI, analyzed the troubleshooting scenario being performed on Medium Voltage
Switchgears, Power Centers, Motor Control Centers, Transformers, PLCs, etc. We were assigned to design and implement motor starting circuit (Direct-on-line starting, Star-delta starting, Auto Star-delta starting).
lectures, after that we studied Single Line Diagrams (SLD) of whole ICI electrical network, then our team of internees
surveyed the Gas Turbines in ICI, analyzed the troubleshooting scenario being performed on Medium Voltage
Switchgears, Power Centers, Motor Control Centers, Transformers, PLCs, etc. We were assigned to design and implement motor starting circuit (Direct-on-line starting, Star-delta starting, Auto Star-delta starting).
Share on Facebook
Share on Twitter
Share Via Email