>Diyar Al Muharraq Project : (Maritime and Revetment)
- Preparation of EI’s (Engineer’s Instruction) for variations orders and associate implications.
- Design and assessment of Culverts between Diyar Al Muharraq Islands.
- Final Inspections for awarding TOC (Taking over Certificate) for some islands
- Approval of revetment as built drawings and transition sections.
- Assisting in carrying out Environmental Impact Assessment (EIA), including supervision of Total Suspended Solids (TSS) environmental monitoring.
- Inspections of sand profile, Geotextile laying and rock revetment for the different layers (primary and secondary) of armour rock.
- Carrying out toe bund surveys by barge and checking its alignment.
- Monitor the concrete works (formwork and concreting) for Accropodes and wave walls and their settlement.
- Carrying out geotechnical test such as Cone Penetration tests (CPT).
- Responsible for the coordination of diving inspections.
- Approval of materials through Material Inspection Requests (MIR).
- Responsible for all quarry associated works.
- Supervision of revetment rock tests done at the quarry in Asker.
- Supervision of rock laboratory testing both at quarry and independent laboratories.
- Approval of quarry sub-contractors and their inspection and testing plan (ITP).
- Preparation of Beach 3 detailed drawing and cross sections.
>Reef Island : (Infrastructure Works)
- Responsible for the collection of all documents and drawings for the preparation of the operation and maintenance (O&M) manual of the Sewage Treatment Plant (STP) building.
- In-charge of the Final inspections on Vacuum Sewer System (VSS) connected to STP jointly with EDD.
- Inspection and approval of exotic handrails installation for more than 3.5km.
- Civil works inspections of the sub-stations besides collecting necessary documents for commissioning and energizing.
- Inspection of retaining walls formwork prior to concreting.
>Porta Reef Project : (Structural & Civil Works)
- Responsible for civil works inspections of mainly internal and external finishing works.
- Inspection of the setting out of flats.
- Approval of as built civil drawings.
- Approval of finishing materials.
- Construction supervision of 2 three storey villas at Juffair.
- Responsible for arrangement of building materials, machines and equipments for all sites.
- Coordinate with associated personnel to perform daily activities according to schedule and budget.
- Preparation and estimation of the B.O.Q for few small extension projects.
Senior Project research title: "Studying the effect of locally available VMA viscosity modifying admixture) on the properties of self compacting concrete(SCC)
Designed a new Self compacting concete mix and studied its properties by performing standard tests.
As “Engineer” in King Hamad's Scheme for Dilapidated Houses. Where I carried out inspection duties and was responsible for the preparation of assessment reports of the dilapidated houses.