Field engineering manager
Petrogas Jahan Company (JEC Group)
Total years of experience :25 years, 0 months
• Design all instrument parts of system such as Loop diagram/Instrument data sheets/ I/O list and index/ Location layout/ Cable routing/Process and Air Hook up/IRP connection.
Vendor Follow up and technical evaluation to purchase project material, and Document Modification & Reply to construction Technical queries, Variation orders follow up, and preparing ASBUILT documents
• Design all instrument system of oil production units and gas/water injection trains such as Loop diagram/Instrument data sheets/ I/O list and index/ Location layout/ Cable routing/Process and Air Hook up/IRP connection, interfaces between packages and main control system.
Preparing all instrument documents for Variation Orders, Vendor Follow up ant technical evaluation to purchase instrument material of the project, Modifying instrument Documents Reply to construction Technical queries and preparing ASBUILT documents.
09.2007. -.07.2008 Elmatco Engineering Company
Mis Desalting & Production unit project
(Oil Treatment/Desalting and Water station units)
Technical offices superintendent ( EPC Project)
• Checking Engineering documents, Bulk material estimate and check, Prepare contractor's invoices, generating job description for contractors, Material Balance, AS BUILT documents.
03.2003-08.2007 Iran International Engineering Company (IRITEC)
Ahwaz (AMAK Project)
(Seven Gas Compressor Stations & one Gas Treatment Plant & one Acid Gas Compressor & Dehydration Station and interrelated Pipelines & Transmission lines.)
Instrument Installation &Commissioning Activities ( EPC Project)
• Instrument Superintendent in Installation, preCommissioning & Commissioning of Karoon Gas Treatment Plant AMAK/GTP) in the field.
• Superintendent of Installation &Commissioning of DCS &ESD &PLC & Fire & Gas Detection systems of Gas Treatment Plant
• Instrument Superintendent in Installation Completion &Commissioning of Kupal Gas Compressor Station in the field /DCS & ESD & PLC & Fire and Gas systems.
• Instrument Superintendent in Installation &Commissioning of Acid Gas Compressor & Dehydration Station (AGCS, AGD / GTP PHASE 2)
• Superintendent of Installation &Commissioning of DCS &ESD &PLC & Fire & Gas Detection systems of Acid Gas Compressor & Dehydration Station (AGCS, AGD / GTP PHASE 2)
• Superintendent of Installation &Commissioning of SCADA system of Acid Gas pipe line from Acid Gas Compressor & Dehydration Station to RAZI petrochemical plant.
07.2000-02.2003 Khuzestan Telecommunication Company/Ahwaz
System Maintenance
• Maintenance & Troubleshooting of Cable Network & Switches.
03.1999-06.2000 KARBEHAN Consulting Company/Ahwaz Steel Complex
Instrument Designer
• Instrument Design of water feeding system of Ahwaz Steel Complex.
• Instrument Design of Belt Conveyers for Pallets.
1994-1998 Isfahan University of Technology Isfahan • B.S., Applied Physics.