Work Experience

Total years of experience :16 years, 9 months

MEP Coordination Engineer at QATARI DIAR VINCI CONSTRUCTION (QDVC)
  • Qatar - Doha
  • December 2016 to March 2020

LRT Depot Project and At-Grade Project

• Provide functional support to MEP Engineers, Site engineers and Technical. Coordination between Construction Team, Technical Team, Subcontractors.
• Review of Detail Design Drawing from the consultant/designer. Checking coordination between MEP Services including Civil and Architectural Drawings. Make comments and suggestion.
• Review Shop drawings and Material Schedule from subcontractors against Detail Design Drawings and Combined Services Drawings. Coordinate with subcontractors regarding clashes with HVAC, Cable Trays, Fire Fighting Pipes, etc.
• Preparation of Field Change Request if there are clashes on site. Prepare sketch proposal to technical and designer.
• Preparation of Design Change Request if there are changes on site that will affect the design.
• Prepare or reply Request for Information to and from Technical team or Designer.
• Prepare drawing for Utility Network and mark the progress weekly for Progress Report. Identify the Installed Pipes and the remaining to be installed weekly. Identify the remaining fittings to be installed.
• Perform Site Inspection to identify the installed HVAC, Cable Trays, Plumbing and Drainage, and Fire Fighting and mark it in the drawing. Verify on site if the shop drawings are followed.
• Coordinate with QA/QC in closing Inspection and Test Report (ITR) by providing document or drawings to be approved for the closure of ITR.
• Prepare As-Built Drawing (Utility Network and Under Slab Drainage) base on Survey Points from surveyors, Approved Field Change Request, and Red Line Markup.
• Check and review As-Built Drawing created by Subcontractors based on Approved Field Change Request, Red Line Markup, Site Survey and Site Inspection.

Mechanical Cad Operator at POWER ENGINEERING CORPORATION
  • Qatar - Doha
  • March 2016 to November 2016

Secondment to Qatari Diar Vinci Construction (QDVC)
LRT Depot Project
• Preparation of Shop Drawings for Utility Piping like Potable Water, Fire Water, Chilled Water, Foul Water and Irrigation Water.
• Responsible in preparation of Shop Drawing for Network Layout. This drawing includes Network Set Out Detail (Pipe Size, Coordinates, Invert Level), Chamber Set Out Detail (Valve Size, Cover Level, Invert Level of Chamber, Coordinates) and Blow Up detail.
• Prepare Shop Drawing for Valve Chamber as per Detail Design Drawing, and Supplier’s Catalog.
• Prepare Shop Drawing for Fittings as per Supplier’s Catalog like Bends, Tees, Reducers, Couplings, and Joints. These drawings also include Thrust Blocks to support the fittings underground.
• Communicate with Suppliers regarding their products like Valve Catalogs, Pipe, and Fitting Catalogs.
• Incorporate all comments and suggestion of Technical Engineers and Construction Team.
• Create Bill of Materials with the help of Quantity Surveyors to send this document to Procurement for initial order.
• Review and recheck Detail Design Drawing in draft format created by consultant before final submission. Make comments and suggestion.

Senior Designer at QATAR PETROLEUM
  • Qatar - Doha
  • September 2014 to June 2015

• Provided technical leadership for definition, design and established engineering support while designing new drawings while revising existing drawings according to requirements.
• Prepared Plot Detail Drawings as per request and updating the latest master plan on a regular basis as per request of the Planning Department.
• Created the Plot Plan drawings and key plan drawings, general arrangement drawings, isometric drawings, pipe support drawings, performing root cause analysis, managing design guidelines, best practices and benchmarking information.
• Ensured all drawings produced are correct in standard, right reference and in compliance with the QP standards and engineering practices described in the project co-ordinations procedure.
• Efficiently analyzed various processes/applications and taking adequate measures to ensure compliance with set requirements and enhance operational efficiency.
• Reviewed vendor document including, detailed and fabrication drawing from the contractors and preparing engineering drawings, including Piping/Mechanical, PFD/P&ID, Civil/Structural, Electrical/Instrumentation, Plumbing/HVAC.
• Provided support tag numbers allocation as per QP ES standard and QP-INDUSTRIAL CITY standards and procedures and provided tag Numbers as per request using Tag Generating System.

Senior CAD/Piping Designer at COWI A/S
  • Qatar - Doha
  • August 2006 to August 2014

• Initiated and developed design solutions for a broad range of engineering services and developed and implemented technical details using knowledge of engineering materials and installation techniques.
• Preparation of Engineering Drawings for Electrical like Cable Diversion, Cross Sections, Street Lighting, etc.
• Preparation of Engineering Drawings for Process like Process Flow Diagram, Piping & Instrumentation Diagram and Cause & Effect Diagram.
• Preparation of Engineering Drawings for Civil Structural like Foundation Plan, Water and Storm Drainage, Reinforcement Bar Bending, Highway Plan and Cross Sections, etc.
• Preparation of Engineering Drawings for Mechanical like HVAC / Plumbing Drawings, Fire Fighting and Sprinkler Layout, etc.
• Preparation of All engineering drawings are guided and instructed by Engineers and based on Project Specifications and Company Standard. These Drawings are Conceptual, Detail, or As-Built Drawing depending on the requirements of Client/Contractor.
• Prepare Piping 3D Drawing in Bentley Autoplant Plant Design for Piping based on Engineer’s Sketch, P&ID and project specifications and procedures.
• Prepare Plot Plan, Keyplan, Pipe Support as per Project Standard and Procedures.
• Produced General Arrangement Drawing and Isometric extracted from 3D Piping Sketch.
• Create Material Take Offs as part of Isometric Drawing
• Perform Clash/Interface check with other discipline models.
• Prepare Line Number List, Valve List, and Equipment List using Microsoft Excel.
• Setup drawings for the team based on company drafting standard. Used client supplied CAD drawings to create XREFs for used as base plan within the team drawings.
• Incorporate all comments and suggestion of engineers in the drawing.
• Review and Recheck drawing format before submission for validity and conformance to Client’s Standard.


PDMS Designer JULY 2013 - NOVEMBER 2013
• Prepare 3D Piping in Aveva PDMS based on Layout and P&IDs.
• Review of valve and instrument tags as per P&ID, valve list and instrument list.
• Review, recheck and modify, equipments like tanks, pumps, etc, as per equipment list
• Review, recheck and modify structural platform and ladders in equipment interfere with piping.


Technical Assistant assigned in Qatar Aluminum (QATALUM) JUNE 2011 - DECEMBER 2012
• Responsible for the preparation of all Engineering Detail Drawings (General Assembly, Piping Isometric, Pipe Support, PFD, P&ID, Civil/ Structural Dwgs, Electrical/Instrumentation Dwgs, Mechanical / Infrastructure design Dwgs relating to existing piping / structural / equipments.)
• Visit the site with Engineers and see the project to be made, take photos and measurements, and prepare a sketch.
• Produced a 2D or 3D AutoCAD sketch based on Client and Engineer's requirement for the project using AutoCAD 3D Modeling
• Carries out detailed engineering drawing based on the client and engineer's approval of the sketch and in accordance with applicable codes and standards.
• Provide Material Take Off for Piping, Mechanical, and Structural based on Project Specifications and Company Standards.


Piping Designer assigned in Maersk Oil Qatar SEPTEMBER 2010 - DECEMBER 2010
• Prepare Pipe Support Detail Drawings for Small Bore Branch based on Standard Drawings, layouts, sketches, and mark-up drawings, design table of engineers.
• Incorporate all comments and suggestion of engineers in the drawing.

Mechanical Design Engineer at PHILIPPINE BUSINESS SOLUTION INC
  • Philippines
  • January 2004 to July 2006

Assigned in JGC Philippines
•Responsible for the preparation of Engineering Detail Drawings for Pressure Vessels (Columns and Drums), Heat Exchanger, and Platform & Ladders based on layouts and sketches, mark-up drawings, and calculation sheets of engineers in conformance with customer’s requirements, project specifications, and standards in order to produce accurate and relevant basis for construction.
•Review of Vendor Document of Heat Exchanger such as Strength Calculation and Fabrication Drawing of General Assembly of vessel and its attachments based on Mechanical and Process Data Sheet, Project Specifications and Company Standards.
•Prepare Platform and Ladder Detail Drawing for Pressure Vessels (Columns and Drums) and Heat Exchanger based on latest piping information, engineering drawing, fabrication drawing of vessel and its attachment made by vendor and project & company standards.
•Prepare Interference Check for Vertical Pressure Vessels (Columns and drums) based on latest engineering drawing, general assembly made by vendor, project specs, and company standards.
•Revised Heat exchanger Calculation based on engineer's comment and mark-up drawings using the Heat Exchanger software, Aspen B-Jac Design System, and Microsoft Excel calculation program.

Design Engineer at BABCOCK-HITACHI (PHILIPPINES) INC
  • Philippines
  • October 2002 to November 2003

Prepare engineering detail drawing for General Assembly of Boilers and its components based on layouts and sketches, mark-up drawings of engineers in conformance with customer’s requirements, project specifications, and standard drawings in order to produce accurate and relevant basis for construction.
•Prepare Fabrication Drawing of Boilers and its components such as superheaters, panels, headers, etc. based on customer’s layout and their fabrication sketches.
•Prepare Parts List, Summary Sheets, and Material Withdrawal Sheets based on Fabrication Drawing.

Education

Bachelor's degree, Mechanical Engineering
  • at Batangas State University
  • March 2001

in

Specialties & Skills

AutoCAD
Microsoft Office
Navisworks
Driving
AutoCAD 2D
AutoCAD 3D
Microsoft Word / Excel
Navisworks
Revit MEP
Bentley Autoplant Plant Design for Piping
Aveva PDMS

Languages

English
Expert
Tagalog
Native Speaker

Training and Certifications

Revit MEP: Mechanical Certified Professional (Training)
Training Institute:
Autodesk
Date Attended:
June 2017
Primavera P6 Enterprise Project Portfolio Management Essentials (Training)
Training Institute:
MiCA Qatar
Date Attended:
October 2019