Technical Office Engineer at HASSAN ALLAM HOLDING
  • Egypt
  • My current job since September 2013

Project Name : PARK VIEW- NEW CAIRO - EGYPT .
Project Formation's : It Coast 150, 000, 000 L.E.- On 24 acre - 636 units, duplex &
pent house,
Owner : H.A.P .
counsaltant : Q.C. at H.A.P .
Duties & Responsibilities :
1) Quantity Surveying.
2) Prepare Reports about Working Average.
3) Preparing Shop Drawing for the Project.
4) Invoices for sub-contractors.
5) Price analysis for customers modifications .
6) Responsible for customers deliveries .

Technical Office Manager. at Abo Gemeaa For Contractor
  • Egypt
  • January 2013 to September 2013

Project Name : PIACERA RESORT- AIN EL SOKHNA - EGYPT.
Project Formation's : It Coast 350, 000, 000 Pound - On 230, 000 m2 - 900 Chalets and
villas .
Owner : EL AHLY ROEAL STEAT .
counsaltant : SABOUR .
What I Do :
1) Quantity Surveying.
2) Prepare Reports about Working Average.
3) Preparing Shop Drawing for the Project.
4) Invoices for sub-contractors.
5) Price analysis for change order for new items & customers modifications .

Technical Office & projects Manager at OMRAN for Studies & Design
  • Egypt - Alexandria
  • February 2010 to December 2012

1) Projects have been prepared quantities and specifications, tender and supervising :-
a. ROYAL Hospital Phase One :-
b. ROYAL Hospital Phase Two :-
c. ALEXANDRIA Pediatric Center :-
d. Villa DR.OSAMA IBRAHIM :-

2) Design and build :-
a. ALEXANDRIA VASCULAR CENTER ( A.V.C. ) :-
b. EL OMRAN For Studies & Design :-
c. CGCE (CONSULTANT GROUP FOR CIVIL ENGINEERING) OFFICE :-
d. VILLA MAGDY EL WELALY :-

3) Preparation of quantities, specifications, general, special conditions and contracts for the following operations :-
a. GREEN TOWERS TANTA :-
b. ACADEMY SCHOOL :-
c. Branch of the Arab Academy for Science and Technology in Port Said :-
d. RCR "Rio Club Resort" Alexandria :-
e. Hotel GREEN COAST EL HAMAM :-
f. GREEN COAST EL HAMAM Market :-
g. ABDU ALLAH Urban Center :-
h. UMM AL-QURA University :-
i. VILLA AHMED FAKRY :-
j. Engineers Syndicate-(Villas&club):-
k. Al Khobar Corniche :-
a. Customs Exhibition Building Model :-

Technical Office Manager. at Abo Gemeaa For Contractor
  • Egypt
  • February 2009 to February 2010

Project Name : PIACERA AT EL EIN EL SOKHNA - EGYPT.
Project Formations : It Cost 145, 000, 000 Pound - On 350, 000 m2 - 3 TYPE BUILDINGS
Working Title : Technical Office Engineer.
What I Do :
1) Quantity Surveying.
2) Prepare Reports about Working Average.
3) Preparing Shop Drawing for the Project.
4) Invoices for sub-contractors.
5) Price analysis for change order for new items & customers modifications .

Technical Office & Supervisor Engineer . at OMRAN for Studies & Design
  • Egypt - Port Said
  • February 2004 to February 2009

Duration : 1-5-2007 until 1-2-2009 .
Project Name : EL MAMORA Plaza Incurring Development EL MAMORA Area at
PORT SAID - EGYPT.
Project Formation's : It Coast 15, 500, 000 Pound - On 5000 m2 - 2 Levels - 34 Cafeteria
-34 Supermarkets.
Duration : 15-10-2005 until 30-6-2007.
Project Name : BEACH PLAZA Restaurants Complex at PORT SAID.
Project Formation's : It Coast 10, 000, 000 Pound - On 11000 m2 - 3 Levels -
12 Restaurants - 9 Fast Food Restaurants - Parking for 100 Cars -
200m Sewage Pipes - 5000m3 concrete - Development Entrance of
Project.
Duration : 1-2-2004 until 14-10-2005.
Project Name : Development Beach of PORT SAID - EGYPT.
Project Formation's : Part One and Two It Coast 12, 000, 000 Pound - On 2000m 22
Cafeteria - 7 Public Bathroom - 4 Big Circus 650 m2 - 2 Small Circus
350 m2 - 1 Skating Circus 400m2 - 10 Cafeteria of Wood -
Development 2 Entrance of Beach - 3000m Pipes of Water Supply
and Sewage pipes .
What I Do :
1) Revision main Invoices.
2) Revision Quantity Surveying.
3) Prepare Reports about Working Average.
4) Acceptance Different Item in Project.
5) Preparing Shop Drawing for the Project.
6) Revision price analysis for change order for new items.

Architect at My Work
  • Egypt - Port Said
  • May 2004 to May 2005

1) Preparing Executive Drawing for Villa at EL SARKYA………………………………...( MAY 04 )
2) Design and Decorated for Residential Court at ALEXANDRIA………………….( OUG. 04 )
3) Preparing Executive Drawing for EL HUSENY Villa at EL EPOR………………….( OCT. 04 )
4) Preparing Executive Drawing for Villa at NEW CAIRO………………………….…..( DEC. 04 )
5) Design Elevations and Preparing Executive Drawing for Residential Court at PORT FOUAD……………………………………………………………………………………………….….…( JAN. 05 )
6) Preparing Executive Drawing for Services Building at Development Beach of PORT SAID Project, Prepare the Specifications and Quantity Surveying for This Building……………………….…………………………………………………………………..…….( MAR. 05 )
7) Design and Decorated for Apartment at PORT SAID….………………………….….( APR. 05 )
8) Sharing of Design Tourist Stridden at PORT FOUAD………………………..………( MAY. 05 )

Architect Drafter & Graphic Designing at جماعة البناء للعمارة و التخطيط العمراني
  • Egypt
  • April 2004 to June 2004

Duration : 1-4-2004 until 20-6-2004 " Part Time ".
Project Name : Pharoyz Village at Port Said - Egypt.
Project Formation's : Many of Chalets and Hotel 3 stars.
Working Title : Architect.
What I Do :
1) Preparing Executive Drawing, prepare the Specifications, Quantity Surveying for hotel.

Architect Drafter & Graphic Designing at MATRIX Company for Integrated Engineerng
  • Egypt - Port Said
  • March 2003 to January 2004

What I Do :
1) Sharing of Decorated Many of Different Spaces ( Department - Super market - Restaurant ).
2) Rendering Many Projects ( Residential Courts - Villas - Public Library ).
3) Sharing of Design Islamic Center, Public Library, Expatriated House, Nursery School, Cafeteria EL AMAL and Garden El MASHTAL at PORT SAID .

Training at 1. THE ARAB CONTRACTORS (Osman Ahmed Osman & Co. ) Branch Port Said .
  • Egypt
  • June 2001 to August 2001

•Training in Three Projects of Company in Port Said .
1)Project (مشروع محطه تنقيه مياه ).
2)Project (مشروع عماره سكنيه ).
3)Project ( مشروع مكتبه للطفل ).
•Duration : 30 - 6 - 2001 to 31 - 8 - 2001.

Architect Drafter & Graphic Designing at WHITE HOUSE CONSULTANT ENGINEERS.
  • Egypt
  • June 2000 to September 2000

•Using 3d&2d AUTOCAD .
• Using 3d&2d AUTOCAD .
• Training in
1) مسابقة للمدارس ( الأشتراك في عمل التصميمات المعمارية لعدد 2 نموذج للمدارس ) .
2) تصميم معماري لفيلا .
3) مجمع لصالات ألعاب رياضية بنادي الزهور ( لوح تنفيذية ) .
4) مستشفي د.عبد الفتاح زيدان ( لوح تنفيذية ) .

•Duration : 17 - 6 - 2000 to 16 - 9 - 2000.

Education

Bachelor's degree, B.SC. Degree in Architecture & Urban Planning
  • at Suez Canal Universty
  • May 2002

Graduation Grade : Good (72.68 %) (Sixth). Grade of Graduation Project : Very Good. Project of Graduation

Specialties & Skills

Adobe Photoshop
AutoCAD
Project Management
Project Collaboration
Graphic Design
1)Excellent User For (Dos and Windows 98,xp)
2)Expert Plotter Manager.
(Autocad 2D,3D,Paper Space Setting(Autocad 2006) , Render by autocad ( 2006 ) 3(
4)Adope Photoshop 9ME , 3D Studio Max R8 , Photo Impact
5)Excellent User For Microsoft Word and Microsoft PowerPoint .
6)Excellent User For Internet.

Languages

Arabic
Expert
English
Expert

Training and Certifications

PREPARATION PMP COURSE (Training)
Training Institute:
Bcom Acadamy
Date Attended:
January 2014
Duration:
32 hours
PRIMAVERA P6 (Training)
Training Institute:
Becom Acadmy
Date Attended:
February 2014
Duration:
32 hours