Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

Arif ur Rehman PMP®

Project Manager, (Electrical)

Mohammad Al Ojaimi Contracting & Establishments

Location:
Saudi Arabia - Dammam
Education:
Master's degree, Electrical Engineer
Experience:
19 years, 11 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  19 Years, 11 Months   

January 2016 To Present

Project Manager, (Electrical)

I found this job using Bayt.com

at Mohammad Al Ojaimi Contracting & Establishments
Location : Saudi Arabia - AlKhafji
Responsibilities:
• Define scope, plan, organize, lead and direct technical work and departmental efforts related to electrical engineering activities for new and existing programs.
Monitoring all activities at project related to electrical documentation inspection, stores, and execution work to verify at compliance with the company/ project policy and procedure.
• Monitor /control cost timing and other related aspects fproject.
• Coordinated with Saudi Electric Company (SEC) for review of materials, approval and compliance with SEC & Aramco standards.
• Erection of HVAC system and complete MEP works in BSP in control room and office buildings.
• BSP Substation 380/115/3.8KV GIS in AL-Khafiji with package of 115KV network.
• Installation of RMU (115 KV), link box for UG power cable AC/ DC, MCC, PFI, and SAS panel.
• Checking RFI, MIR, on daily basis with Engineers relative to tasks.
• Maintain PMO works according to the running projects as per standard ofSEC.
• 380KV GIS ABB SF6 Switchgear.
• 3-sets of 502 MVA (380/115KV) Hyundai power T/F (150MVAR) shunt reactors.
• Power cables system 1X630mm2, 1200mm2 and 2000mm2.
• 13.8KV Metal clad Alfanar switchgear. 125V & 230 VDC Batteries systems.
• 380KV DC OHTL Safanihya Power Plant to BSP.
• 115KV S/S No: 2&5, 3 and S/S: 4 Underground Cable 2000mm2.
• 115KV SC- BSP to Ras ul Mishaib Underground.
• Erection of (HVAC) System Complete and MEP work in BSP Station.
• Cable trays & Cable ladders installation, Cable pulling & termination.
• Water Pumps, Transmission system. Auxiliaries, Communication System.
• Design experience of LV distribution and switchgear, LV cabling and Minor Power, Internal External and Emergency Lighting, Fire alarms, CCTV, Door entry systems and BMS

Construction of 380/115/13.8 KV Al Khafji BSP: Contract No:4400003710
June 2013 To December 2015

Deputy Project manager Electrical

at Halil Avcl Adana
Location : Türkiye - Izmir
Coordinated with designing departments, mechanical/ civil departments, discuss technical aspects of electrical system with contractor to successful completion.
Generation distribution and Protection schemes motor, generator, variable frequency driver, (VFD) conversion equipment station T/F, switch board andswitchgear.
Installation of UPS converter, battery charger, high speedT/S.
Erection of complete raceway cable tray (S, S, MS, ladder trucking channel & fitting) for tupras oil
Ensuring work in executing as per IFC drawings. Monitoring the progress of electrical works. Erection of MV/LV switchgear, cables lines, T/F, MDB, SMBD, PFI, MCC, panel.
Coordination from cooperative office/main contractor/consultant engineer for execution and RFI, MRI, NCR, related activities.
Installation of Boiler feed pumps, water treatment plants, cooling towers, aircompressor.
Experience in lying cables HV, MV, LV composite, instruments, fiber optics cables, glandings/termination, testing
February 2010 To April 2013

Senior Electrical Engineer

at Dossan Construction
Location : Saudi Arabia - Ras Al Khair
• Saline Water Conversion Corporation's (SWCC) Ras Al Khair Desalination Plant is a hybrid Desalination Plant which will implement both the Multistage Flashing (MSF) and Reverse Osmosis (RO) Technologies.
• The Project also includes the construction of a 2650 MW Combined Cycle Power Plant, which will comprise of five 600MW CC Gas Turbine (CCGT) Blocks and Two 220MW Single Cycle Gas Turbines (SCGT) Units & 380KV Substation. The project Ras Al Khair Power and Desalination Plant Phase 1 for SWCC includes:
1.Construction of Desalination Plant of 224.8 MIGD (MSF 20MIGD X 8 Units/R.O 34MIGD X 2 Units).
2.Construction of Power Plant having generation capacity of 3600 MW \[Power Generation from 1 unit of simple cycle and 5 units of combined cycle out of which the 2400 MW Combined Cycle Power Plant (1050 MW supply to SEC 1350MW supply to Ma’aden Aluminum Complex 1200 MW will be used for the plant utilities) utilizes the heat energy of Natural Gas, initially to operate the Gas Turbines (GT) and the GT exhaust is directed to Heat Recovery).
•The project involved construction of an RO building, switchgear buildings, a wastewater treatment plant, a chemical dosing building, as well as installation of a dissolved air floatation unit and two dual media filters.
1. 12-STG6-5000F Gas turban, 5-SST6-4000F Steam turban, 17-SGen6-1000A Generator.
2. 10-HRSG and SPPA-T3000 I & C. 6-Boiler feeds and 10 condensate pump for CC power plant.
3. High voltage motor 4600KW-14P 13.8KV for desalination plant by Hyosung. Erection activities of LV/MV/HV Transformers, Switchgears & MCC’s, and Isolated Phase Bus ducts (IPB). Gas Insulated Bus ducts (GIBs), 380kV XLPE 1200mm2, 2000mm2 UG cables, MV/ LV bus ducts, Distribution Boards, Lighting Panels, Variable Frequency Drives (VFDs) UPS/DC Systems and Diesel Generators.
•The gas turbine and steam turbine generators connected to 380 kV Gas Insulated Substation via generator step-up transformers and 380 kV cables. Each Gas Turbine Generator rated 260 MVA, 18 kV, 60 Hz, 3600 rpm, 0.85 power factor, Air Cooled. Each Steam Turbine Generator rated 213 MVA, 16.5 kV, 60 Hz, 3600 rpm, 0.85 power factor, Air Cooled.
• Performing inspections & tests to determine whether delivered products and or installed systems meet SEC & RC standards and approved material & design submittals.
• Respond to and conduct “Requests for Inspection (RFI)” in a professional and in a timely manner.
• Capable of checking and verifying IFC drawings and understanding technical specifications.
• Carrying out site inspections with Client engineers. Quality documents follow-up like, RFI’s, MAR, FAT, as-built drawings preparations and reviews.
•HVAC, Fire Fighting systems (Deluge Fire, water spray, Sprinkler, CO2 and FM200).Fire alarm, Lighting system, Desalination unit, Boiler feed pumps, and water treatment plants.
• Involved in the installation activities of the LV/MV/HV Transformers, Switchgears & MCC’s, Isolated Phase Bus ducts (IPB), Gas Insulated Bus ducts (GIBs), 380kV XLPE cable, MV/ LV bus ducts, DBs, Lighting panels, (VFDs), UPS/DC Systems and Diesel Generators (DG).
•Erection of different, cooling water, UPS & DC power, Air compressor system.
July 2006 To January 2010

Electrical Engineer

at Attock oil refinery
Location : Pakistan - Rawalpindi
Performed as directed by supervisor, inspection, examination and test to determine compliance with applicable specification procedures code/ standard.
1:-Erection of 2.5/1/0.63 MVA T/F in/out cabling withtermination.
2:-Installed panel’s wall and pad mounted, MDB, SMDBs, MCC ATS, PLC and MV/LV Switchgear in refinery.
3:-Erection of different cooling water, UPS/ DC Air compressor system.
4:-Erection of DG, 3X2.5 MW caterpillar Engine.
5:-Learned about basic of instrument how process variable (Temperature flow pressure and level) are controlled using sensor, like vibration, speed, wind speed, direction, humidity, liquid level switch and HP/ LP sensor.
6:-Learned about the system working in refinery to process which isDCS/PLC.
PLS-TDC-3000, Expansion PKS - C200
PLS Allen BradlyTDC-3000
February 2004 To May 2006

Junior Electrical engineer

at STFA construction company Pakistan
Location : Pakistan - Swabi
1:-Reading electrical, mechanical and construction drawings.
2:-Review the electrical shop-drawing and the as-built drawing for electrical works.
3:-Installation of Electric works in water and wastewater pumping stations.
4:-Lighting (exterior / interior), Data & Telephone, Fire alarm and Security.
5:-Site reporting of DPR, MPR to RENESPAK
6:-Hands on experience working with UPS system, distribution panel, control panel, and ATSpanel.
7:-Distribution equipment (Switchgears, MCC, and MBDpanel).

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
March 2010

Master's degree, Electrical Engineer

at N.W.F.P University of Engineering & Technology Peshawar Pakistan
Location : Pakistan - Peshawar
Grade: 3.17 out of 4
1 Electrical circuit analysis, Electronic, Power
Generation,
2 AC/DC machine. Transmission & distribution of
An electrical Power system,
3 utilization & measuring of Electrical power,
4 Switch gear & Electrical protection,
August 2008

Bachelor's degree, electrical engineering

at university of engineering and technology Peshawar Pakistan
Location : Pakistan - Peshawar
Grade: 3.02 out of 4
Electrical engineering
March 2004

Diploma, electrical engineering

at board of technical education Peshawar Pakistan
Location : Pakistan - Abbottabad
Grade: 68 out of 100
Diploma of Electrical Technology DAE

Specialties & Skills

Electrical Engineering

Power Systems

Electrical Maintenance

Electrical Power system & MEP Works

Electrical distribution system

Calculations

Project Management PMP® PMI USA.

Power Management system

Power automation system

Construction Management

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

English

Expert

Urdu

Expert

Arabic

Beginner

Memberships

Are you a member of any organization or professional club?
Your professional memberships provide an informative signal about your career aspirations, so add them!
Organization : Pakistan Engineering Council Pakistan
Membership/Role : Electrical Engineer
Member since : March 2010
Organization : Saudi Council of Engineering KSA
Membership/Role : Electrical Engineer 437125
Member since : January 2019
Organization : Caterpillar University of Power Engineering.
Membership/Role : Charted Electrical Engineer C-1024
Member since : April 2014
Organization : Project Management Institute PMI, USA
Membership/Role : Project Management Professional PMP® PMI
Member since : September 2020
Organization : Caterpillar power Management
Membership/Role : Power plant USA (PP1024)
Member since : December 2010

Training and Certifications

PLC,DCS ( Certificate )

Issued in: August 2009 Valid Until: - September 2009

Hobbies and Interests

Share your hobbies and interests so employers can know more about you.
Help employers know more about you by looking at your hobbies and interests

Cricket

Winner up on College and University Levels

Recommendations

Why should I get recommendations?
Get recommendations from your peers and make your profile stand out! Recommendations help employers see that you'er distinguished in your professional areas of expertise.

As Electrical engineer in Mohammed Al Ojaimi Cont. & Esatablishment

By
Irfan Ali
(COLLEAGUE) on 22-02-2018
"Highly proficient & Skillful, got good management skills"

Loading
Loading...
Loading...