Armia Nageb, Acc. projects section manager

Armia Nageb

Acc. projects section manager

alfanar company substaion automation factory

Lieu
Arabie Saoudite - Riyad
Éducation
Baccalauréat, Engineering Electrical Power Department
Expérience
7 years, 6 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :7 years, 6 Mois

Acc. projects section manager à alfanar company substaion automation factory
  • Arabie Saoudite - Riyad
  • juin 2008 à avril 2012

C- Project manager from June 2008 until now.
Responsibilities:
• Interfaces with SEC Management, Project Engineering Staff, Suppliers, Subcontractors,
Clients & Consultants.

• Management and co-ordination of all project specifications and associated technical data,
gaining the necessary approvals and ensuring the distribution and availability of the data
where its need in support of project quality is required.

• Following the Documents, Technical Submittals and Drawing for Approval from Saudi
Electricity Company.

• Preparing all Daily, Weekly and Monthly Progress Reports.

• Responsible for the management and operation of project works related to quality, cost,
programmers, and health and safety of operatives and staff.

• Responsible to develop and maintain good working and social relationship with the Client,
Consultant and & Utilities Department Officials to ensure the smooth running of the Project.

• Co-ordination & preparation of Design Input, Output, Validation, changes & formal design
reviews with Operation/Engineering Manager.

• The selection, sourcing and scheduling of all purchased materials, gaining the necessary
approvals to procure and ensuring the availability of materials on site within the time
schedule.

• Responsible to ensure that the standard of the installed works is in accordance with the technical and quality specification of the contract and quality of workmanship is maintained to the highest standards.

• Responsible for effective organization, deployment and control of the site labour
/supervision.

Acc. Projects section manager à Substation Automation Factory
  • Arabie Saoudite - Riyad
  • mars 2007 à avril 2012

2 Alfanar Electric System, Substation Automation Factory
March, 2007- Until Now
(Saudi Arabia)

Interfaces with SEC Management, Project Engineering Staff, Suppliers, Subcontractors,
Clients & Consultants.

• Management and co-ordination of all project specifications and associated technical data,
gaining the necessary approvals and ensuring the distribution and availability of the data
where its need in support of project quality is required.

• Following the Documents, Technical Submittals and Drawing for Approval from Saudi
Electricity Company.

• Preparing all Daily, Weekly and Monthly Progress Reports.

• Responsible for the management and operation of project works related to quality, cost,
programmers, and health and safety of operatives and staff.

• Responsible to develop and maintain good working and social relationship with the Client,
Consultant and & Utilities Department Officials to ensure the smooth running of the Project.

• Co-ordination & preparation of Design Input, Output, Validation, changes & formal design
reviews with Operation/Engineering Manager.

• The selection, sourcing and scheduling of all purchased materials, gaining the necessary
approvals to procure and ensuring the availability of materials on site within the time
schedule.

• Responsible to ensure that the standard of the installed works is in accordance with the technical and quality specification of the contract and quality of workmanship is maintained to the highest standards.

• Responsible for effective organization, deployment and control of the site labour

engineer à B-Testing and Commissioning
  • Arabie Saoudite - Riyad
  • octobre 2007 à juin 2008

B-Testing and Commissioning engineer October 2007 to June 2008

• Organizing, conducting and supporting test activities.
• Make point to point and function test as per the approved scheme with approved from the customer and as per M/S SEC requirements.
• Rapidly response to equipment failures & implementing immediate repairs.
• Responsible for executing test cases, documenting results and defects.
• Testing and fault finding finished systems in accordance with company procedures.
• Loading and installation of software in the relays with testing in the factory.

A- Projects coordinator à Alfanar Substation Automation Factory
  • Arabie Saoudite - Riyad
  • mars 2007 à septembre 2007

A- Projects coordinator from March 2007 to September 2007

• Responsible for the coordination with the all departments to ensure the work are going
smoothly as per the approved drawings from the customer.
• Review design deliverables together with the design consultant and engineers and ensure that
it is in order for submission as per the customer requirements and as per M/S SEC standers.
• Attend technical design clarification and project meetings to meet the customer requirements
• Coordinate with the document controller on the transaction of the design deliverables to ensure that the flow of the documents is smooth and correct.
• Assist the procurement team by providing all necessary technical inputs to facilitate award of procurement and subcontract packages, attend technical clarifications as and when required and also assist QA and QC.
• Coordination with the customer to make the FAT in the factory thru our testing engineers in the presence the QC engineers.
• Coordination with production and QC engineers to packing the panels after finalizes the customer comments.
• Deliver the panels to the customer and finalize the internal procedures.

Maintenance enginer for protection and GIS system à Ayoun Moussa Thermal Power Plant
  • Egypte - Suez
  • novembre 2004 à février 2007

Ayoun Moussa Thermal Power Plant
1 Nov. 2004 - February, 2007
2 × 320 MW (Egypt)

1- Maintenance of AC Motors.
2- In The Operation and maintenance of 6.3Kv and 400 v switchgear.
3- In Testing of motors protection devices: -

Protected motor Devices Description

Multilin SR469 ( G. E) Multi Functions relay
6.3 KV motors Multilin SR269 ( G. E) Multi Functions relay
MDP ( G. E) Load center protection
4- Annual maintenance and Testing of switchgear by using Contact resistance and open and close
Timing devices.
5- Having the fourth degree of the safety rules.
6- Electrical maintenance engineer and responsible for maintenance of
- 500 K.V G .I.S switch yard.
- 220 K.V G.I.S switch yard.
- Tie transformer 500/220/12 K.V (500MVA)
- Event recorder.
- Fault recorder.
- DC system (batteries- battery charger)


NO. Period Responsibility included

Éducation

Baccalauréat, Engineering Electrical Power Department
  • à Suez Canal University
  • janvier 2003

Faculty of Engineering Electrical Power Department, Suez Canal University, Egypt. Year of graduation: 2003

Specialties & Skills

Langues

Arabe
Expert
Anglais
Expert