Total Years of Experience: 28 Years, 2 Months
July 2016
To March 2019
Electrical Supervisor ( KNPC Clean Fuels Project )
at Japan Gas Corporation
Location :
Kuwait - Al Ahmadi
• Supervision in glanding and termination of High voltage cables using approved
procedure and termination kits to switchgears and transformers.
• Supervision of Electrical works involving high voltage cabling (6KV/12KV)
Single core XLPE/PVC/LC/PVC cables in trefoil arrangements in main cable trench and in cable racks.
• Cabling/ Cable Pulling activities underground and above ground
• Termination works for Low voltage, medium voltage, control and communication cables.
• Lighting system installation includes installation of cable trays, mounting of lighting fixtures junction boxes, connection and energization.
• Installation of Major Electrical equipments such as Transformers (6.3 MVA), High voltage & Low voltage Switchgears, Bus ducts, Marshalling cabinets, Lighting/Cathodic/Heat Tracing field Junction boxes, Welding receptacles.
• Field termination activities for Motors, Push button stations, Field junction boxes.
• Heat trace system related to underground and aboveground Piping works.
• Grounding system instalaation.
• Glanding and termination of LV cables in Motor Control Centers, Emergency Generators, Motors (HV and LV), Field junction boxes, Lighting junction boxes.
• Installation of cable trays and supports for HV & LV motors, lighting and powers system.
• Give assistance to Testing activities related to E and I.
procedure and termination kits to switchgears and transformers.
• Supervision of Electrical works involving high voltage cabling (6KV/12KV)
Single core XLPE/PVC/LC/PVC cables in trefoil arrangements in main cable trench and in cable racks.
• Cabling/ Cable Pulling activities underground and above ground
• Termination works for Low voltage, medium voltage, control and communication cables.
• Lighting system installation includes installation of cable trays, mounting of lighting fixtures junction boxes, connection and energization.
• Installation of Major Electrical equipments such as Transformers (6.3 MVA), High voltage & Low voltage Switchgears, Bus ducts, Marshalling cabinets, Lighting/Cathodic/Heat Tracing field Junction boxes, Welding receptacles.
• Field termination activities for Motors, Push button stations, Field junction boxes.
• Heat trace system related to underground and aboveground Piping works.
• Grounding system instalaation.
• Glanding and termination of LV cables in Motor Control Centers, Emergency Generators, Motors (HV and LV), Field junction boxes, Lighting junction boxes.
• Installation of cable trays and supports for HV & LV motors, lighting and powers system.
• Give assistance to Testing activities related to E and I.
February 2015
To December 2015
Electrical Supervisor(In Amenas Comp. Project -IACP
at Japan Gas Corporation
Location :
Algeria - Algiers
Supervised/ Guide EPCC Contractor during major activities on site such as
• Cabling/ Cable Pulling activities underground and above ground,
• Termination works for Low voltage, medium voltage, High voltage, control and communication cables.
• Installation of Major Electrical equipments such as Transformers, Switchgears, Bus ducts, Marshalling cabinets, Lighting/Cathodic/Heat Tracing field Junction boxes, Telephone junction boxes.
• Field termination activities for Motors, Push button stations, Field junction boxes.
• Heat trace system and Grounding systems.
• Lighting system installation includes lay out of cable trays, mounting of lighting fixtures, junction boxes installation and connection works.
• Cathodic protection system installation..
• Cabling/ Cable Pulling activities underground and above ground,
• Termination works for Low voltage, medium voltage, High voltage, control and communication cables.
• Installation of Major Electrical equipments such as Transformers, Switchgears, Bus ducts, Marshalling cabinets, Lighting/Cathodic/Heat Tracing field Junction boxes, Telephone junction boxes.
• Field termination activities for Motors, Push button stations, Field junction boxes.
• Heat trace system and Grounding systems.
• Lighting system installation includes lay out of cable trays, mounting of lighting fixtures, junction boxes installation and connection works.
• Cathodic protection system installation..
January 2013
To February 2014
CHIEF ELECTRICAL SUPERVISOR ( DS- LNG )
at JAPAN GAS (JGC)/ TCCI
Location :
Indonesia
Worked with EPCI company, Direct supervision over sub-contractors in all Electrical works in plant Electrical Substation.Activities involved are mounting/ installation of meduim and high voltage transformers rated ( 11KV/6.9KV- 6.9KV/420V), installation of meduim and high voltage switchgears rated (6.9KV- 420V), installation of neutral earthing resistors, installation of 6.9KV & 420V bus ducts, installation of battery chargers, installation of batteries for DC system, installation of UPS system panels, installation of Interposing relay panels, installation of Telecommunication cabinets, installation of Normal and Emergency panels for lighting system.
Supervision over termination and connection of cables both power and control cables in meduim and high voltage switchgears and Motor Control Centers rated (6.9KV-420V), Interposing relay cabinets, battery chargers, UPS cabinets, Normal and emergency panels for lighting system.
Supervision in Electrical Substation works.
Supervision over termination and connection of cables both power and control cables in meduim and high voltage switchgears and Motor Control Centers rated (6.9KV-420V), Interposing relay cabinets, battery chargers, UPS cabinets, Normal and emergency panels for lighting system.
Supervision in Electrical Substation works.
March 2011
To October 2012
ELECTRICAL SUPERINTENDENT ( SATORP Project )
at Al HUGAYET/ SATORP
Location :
Saudi Arabia - Jubail
Hired by Satorp Owner/ Client side as “Electrical Superintendent”
Work for (Saudi Aramco Total Refining and Petrochemical Company) Guide/ Supervised EPCC contractor activities during the installation of major electrical equipment such as Main Power Transformers (65MVA 34.5/14.5kv, 40MVA 34.5/14.5kv, 2500KVA 13.8/0.5kv), HV Switchgears 13.8 kv & 5kv, UPS, battery racks, Motor Control Centers, Transformer protection panels, Interposing relay panels, HVAC electrical equipment, Dry type transformers, Lighting panels, Power panels, Heat tracing panels, Variable Speed drives, Electrical Control System cabinets, Cable pulling activities for control, low, medium and high voltage cables, Cable tray installation, Conduit installation, Duct bank construction, Grounding and Lightning protection system, Motors and Motor control stations, Lighting system installation, Cathodic protection, CCTV, Paging system, Communication system.
• Lead in the management, direction and coordination of project resources in order to ensure that construction meets client’s contractual requirements in most efficient manner.
• Supports major construction activities, monitoring all phases of field electrical construction. Responsible for executing the work in a timely manner, in accordance with design and schedule requirements. Participates in review and submission of financial reports, progress measurements, approval of field changes, etc.
• Maintains a field written log of problems and directions given to Contractor.
• Reviews drawings for compliance with standards and specifications and for constructability. Recommends alternative construction methods where applicable.
• To confirm that implemented installations must be as per requirement of Saudi Aramco Engineering Standards, as per Material Specification requirements, Inspection and Test plan and Method of Statements.
Work for (Saudi Aramco Total Refining and Petrochemical Company) Guide/ Supervised EPCC contractor activities during the installation of major electrical equipment such as Main Power Transformers (65MVA 34.5/14.5kv, 40MVA 34.5/14.5kv, 2500KVA 13.8/0.5kv), HV Switchgears 13.8 kv & 5kv, UPS, battery racks, Motor Control Centers, Transformer protection panels, Interposing relay panels, HVAC electrical equipment, Dry type transformers, Lighting panels, Power panels, Heat tracing panels, Variable Speed drives, Electrical Control System cabinets, Cable pulling activities for control, low, medium and high voltage cables, Cable tray installation, Conduit installation, Duct bank construction, Grounding and Lightning protection system, Motors and Motor control stations, Lighting system installation, Cathodic protection, CCTV, Paging system, Communication system.
• Lead in the management, direction and coordination of project resources in order to ensure that construction meets client’s contractual requirements in most efficient manner.
• Supports major construction activities, monitoring all phases of field electrical construction. Responsible for executing the work in a timely manner, in accordance with design and schedule requirements. Participates in review and submission of financial reports, progress measurements, approval of field changes, etc.
• Maintains a field written log of problems and directions given to Contractor.
• Reviews drawings for compliance with standards and specifications and for constructability. Recommends alternative construction methods where applicable.
• To confirm that implemented installations must be as per requirement of Saudi Aramco Engineering Standards, as per Material Specification requirements, Inspection and Test plan and Method of Statements.
April 2009
To July 2010
ELECTRICAL SUPERVISOR ( QCS 3 & 4 Project )
at CHIYODA/ TECHNIP Joint Venture
Location :
Qatar - Doha
Supervision over major Electrical Equipment installation such as Switchgears, Transformers, Motor Control Centers, Neutral earthing resistors, HVAC panels and all other Electrical equipments for Vital and Emergency power in Main Plant Substation
Underground Electrical works ( duct bank, electrical trenches and grounding works )
Termination of high, medium and low voltage cables in Switchgears, Transformers, Motor Control Centers, Field junction boxes, Lighting Panel boards, Marshaling Cabinets, Relay Cabinets and Motors.
Turn over all system for RFSU ( Ready For Start Up)
Pulling of high, medium, low voltage cables underground and above ground.
Lighting Facilities installation for normal and emergency circuits in pipe racks, structures, vessels, Substations, PIB, Streets and Fence lightings
Underground Electrical works ( duct bank, electrical trenches and grounding works )
Termination of high, medium and low voltage cables in Switchgears, Transformers, Motor Control Centers, Field junction boxes, Lighting Panel boards, Marshaling Cabinets, Relay Cabinets and Motors.
Turn over all system for RFSU ( Ready For Start Up)
Pulling of high, medium, low voltage cables underground and above ground.
Lighting Facilities installation for normal and emergency circuits in pipe racks, structures, vessels, Substations, PIB, Streets and Fence lightings
December 2006
To November 2008
ELECTRICAL SUPERVISOR ( CTSD - LNG Project )
at CHIYODA TOYO SAKHALIN DEVELOPMENT
Location :
Russian Federation
•Supervision during Electrical construction of 5 units of 10 KV Gas Turbine Generators with associated 480v Motor control centers and cabling works.
•Electrical Equipment installation such as Switchgears, Transformers, Motor Control Centers, Neutral earthing resistors, HVAC panels and all other Electrical equipments for Vital and Emergency power in Main Plant Substation
•Supervision for Underground Electrical works
•Supervison in the termination of high, medium and low voltage cables
•Supervision in the Pulling of high, medium, low voltage cables underground and above ground.
•Supervision in Lighting System Installation
•Supervised in installation of UPS system, Battery chargers, Battery racks, Cathodic Protection system, Heat Tracing system, Sliding gates and Conveyors.
•Supervision in Wiring and installation for CCTV system, PAGA system (Gaitronics), Communication System.
•Supervision in Cable tray installation and conduit works
•Electrical Equipment installation such as Switchgears, Transformers, Motor Control Centers, Neutral earthing resistors, HVAC panels and all other Electrical equipments for Vital and Emergency power in Main Plant Substation
•Supervision for Underground Electrical works
•Supervison in the termination of high, medium and low voltage cables
•Supervision in the Pulling of high, medium, low voltage cables underground and above ground.
•Supervision in Lighting System Installation
•Supervised in installation of UPS system, Battery chargers, Battery racks, Cathodic Protection system, Heat Tracing system, Sliding gates and Conveyors.
•Supervision in Wiring and installation for CCTV system, PAGA system (Gaitronics), Communication System.
•Supervision in Cable tray installation and conduit works
June 2003
To July 2006
SENIOR ELECTRICAL TECHNICIAN
at SWCC ( Saline Water Conversion Corporation)
Location :
Saudi Arabia - Jubail
Have performed routine maintenance of Electrical Equipments such as auxiliary Transformers 13.8KV/4KV 2500 KVA & 1000 KVA, 13.8KV bus bars & cubicles, 480v air circuit breakers, 480v modules and MCC’s, 480v motors & push button stations, Calibration of Motor Operated valves, battery bank lead acid batteries for Ups System & Diesel Firewater Pump, Overhead Cranes having 16 tons & 3 tons capacities, Monorail hoist, rolling shutter doors, Plant Lighting System, Overhauling of 480v induction motors including motors for MOV’s. Attending trouble shooting of electrical circuits when emergency occurs during the operation. Performing major electrical works during scheduled plant shutdown.
March 2000
To December 2001
CONTROL SYSTEM ENGINEER (Olefins III Project )
at PARSONS
Location :
Saudi Arabia - Yanbu
Inspection over electrical installations done and same time monitoring of progress and RFI ( Request for inspection ) approvals done during the upgrading of 3X110 megawatts units of Steam Generating Plants, HRSG's, Dessalination Plant and Tank Farm .
Guide/ Supervised EPCC contractor activities during the installation of major electrical equipment such as Main Power Transformers, HV Switchgears 13.8 kv & 5kv, UPS, battery racks, Motor Control Centers, Transformer protection panels, Interposing relay panels, HVAC electrical equipment, Dry type transformers, Lighting panels, Power panels, Electrical Control System cabinets.
Guide/ Supervised EPCC contractor activities during the installation of major electrical equipment such as Main Power Transformers, HV Switchgears 13.8 kv & 5kv, UPS, battery racks, Motor Control Centers, Transformer protection panels, Interposing relay panels, HVAC electrical equipment, Dry type transformers, Lighting panels, Power panels, Electrical Control System cabinets.
April 1998
To April 1999
SENIOR ELECTRICAL ENGINEER ( Shedgum Gas Plant Aramco )
at Abdullah Al-Shuwayer Co. w/ Black and Veatch Pritchard
Location :
Saudi Arabia - Dammam
Supervision over major Electrical Equipment installation during upgrading of Shedgum Gas Plant in Abqaiq Saudi Arabia such as Switchgears, Transformers, Motor Control Centers, Neutral earthing resistors, HVAC panels and all other Electrical equipments for Vital and Emergency power in Main Plant Substation
Underground Electrical works ( duct bank, electrical trenches and grounding works )
Termination of high, medium and low voltage cables in Switchgears, Transformers, Motor Control Centers, Field junction boxes, Lighting Panel boards, Marshaling Cabinets, Relay Cabinets and Motors.
• Pulling of high, medium, low voltage cables underground and above ground.
Underground Electrical works ( duct bank, electrical trenches and grounding works )
Termination of high, medium and low voltage cables in Switchgears, Transformers, Motor Control Centers, Field junction boxes, Lighting Panel boards, Marshaling Cabinets, Relay Cabinets and Motors.
• Pulling of high, medium, low voltage cables underground and above ground.
June 1996
To December 1997
Electrical Inspector ( Sabayek Ferro Alloy Proj. )
at Saudi Arabian Kent Co. Ltd & BHP Engineering PTY. LTD.
Location :
Saudi Arabia - Jubail
QA/QC Activities Inspection & Testing, Transformer testing winding resistance/oil filtration circulation and die-electric test, Hi-potential test of cables, Motor solo run test, Injection testing of 480V breakers, Loop package testing & commissioning for Electrical and some Instrumentation, Continuity and insulation resistance test of cables, Visual inspections for ( Cabling & Termination works, Electrical Equipment installations, Cable tray, conduit works, power and wiring installations, duct bank and trenches inspections.
Ensure that all installations must be done as per project specifications and standards.
Ensure that all installations must be done as per project specifications and standards.
December 1994
To December 1995
Electrical Supervisor ( HARADH GOSP - 1 Aramco )
at A.H. Al Shuwayer Co. & Babcock King Wilkinson
Location :
Saudi Arabia - Hofof
Direct supervision over all Electrical works in plant Electrical Substation.Activities involved are mounting/ installation of meduim and high voltage transformers rated, installation of meduim and high voltage switchgears, installation of neutral earthing resistors, installation of battery chargers, installation of batteries for DC system, installation of UPS system panels, installation of Interposing relay panels, installation of Telecommunication cabinets, installation of Normal and Emergency panels for lighting system,
February 1991
To April 1994
ELECTRICAL SUPERVISOR ( ZULUF GOSP 4/ MARJAN GOSP 3 & 4 ) Aramco
at MOHAMMAD Al MOJIL GROUP
Location :
Saudi Arabia - AlKhafji
Direct supervision of electrical personnel during electrical installations done in Petro Chemical Plants and Gas and Oil Separation (GOSP) Plants Offshore.
• Electrical Equipment installation such as Switchgears, Transformers, Motor Control Centers, Neutral earthing resistors, HVAC panels etc.
• Underground Electrical works ( duct bank, electrical trenches and grounding works )
• Termination of high, medium and low voltage cables in Switchgears, Transformers, Motor Control Centers, Field junction boxes, Lighting Panel boards, Marshaling Cabinets, Relay Cabinets and Motors.
• Pulling of high, medium, low voltage cables underground and above ground.
• Lighting Facilities installation for normal and emergency circuits
• Electrical Equipment installation such as Switchgears, Transformers, Motor Control Centers, Neutral earthing resistors, HVAC panels etc.
• Underground Electrical works ( duct bank, electrical trenches and grounding works )
• Termination of high, medium and low voltage cables in Switchgears, Transformers, Motor Control Centers, Field junction boxes, Lighting Panel boards, Marshaling Cabinets, Relay Cabinets and Motors.
• Pulling of high, medium, low voltage cables underground and above ground.
• Lighting Facilities installation for normal and emergency circuits
February 1990
To January 1991
Project Engineer
at Professional Contractors & Consultants Incorporated
Location :
Philippines - Manila
Managed and supervised all electrical works involved during the construction of Cocolife high rise building.
Turn over all installations up to energization.
Turn over all installations up to energization.
October 1985
To October 1989
Electrical Foreman ( MINA ABDULLAH Refinery Project )
I found this job using Bayt.com
at Engineering Equipment Inc./BRAUN TRANSWORLD CORPORATION
Location :
Kuwait - Al Fahahil
Handle crew of electricians to do electrical installations in a refinery complex. The project was the Mina Abdullah Refinery Modernization Project in Kuwait
July 1984
To September 1985
CADET ENGINEER
at ADBEN CONSTRUCTION INC.
Location :
Philippines
Site supervision over all electrical works involved during the construction of Metropolitan Court Condominium a high rise building construction.
Share on Facebook
Share on Twitter
Share Via Email