ashraf mostafa, Construction Project Manager

ashraf mostafa

Construction Project Manager

HEXAGON for Projects and construction consultant

Location
Egypt - Cairo
Education
Bachelor's degree, Civil Engineering
Experience
18 years, 9 months

Share My Profile

Block User


Work Experience

Total years of experience :18 years, 9 months

Construction Project Manager at HEXAGON for Projects and construction consultant
  • Egypt - Sharm el Sheikh
  • My current job since July 2017

 CityStars Sharm Elsheikh (Sharm Elsheikh)
Features: 650, 000 m² (33 separate buildings) Each building (G+1st+2nd) + 12 swimming pools + Retail building + Landscape + Infrastructure networks + 8 staff accommodation buildings + 4 sewage treatment plants + central laundry + central kitchen + 2 chiller yards.
 Applying appropriate project management standards
 Managing the production of the required deliverables
 Planning and monitoring the project
 Managing project risks, including the development of contingency plans.
 Monitoring overall progress and use of resources, initiating corrective action where necessary
 Reporting through agreed lines on project progress through highlight reports.
 Adopting and applying appropriate technical and quality strategies and standards
 Identifying and obtaining support and advice required for the management and control of the project
 preparing any follow-up action recommendations

Construction Manager at projacs international
  • Egypt - Cairo
  • March 2015 to July 2017

 Porto new cairo (New Cairo)
Features:
55, 000 m² (26 separate parts) Each part (B+R+G+1st) + 5 towers each tower (B+R+G+7 typical), 3 water tanks - Coordinate, monitor and distribute design/client design modifications. Track changes in conjunction with project contingency.
 - Oversee and direct project construction
 - coordinate and direct consultants, contractors and subcontractors
 - Oversee all onsite and offsite constructions to monitor compliance with building and safety regulations
 - analyse, manage mitigate construction problems and risks
 - Manage field activities to ensure all work is completed to plan and is executed within the established schedule and budget.
 - Manage and monitor the budget, and schedule of the project in conjunction with office based cost and schedule support.
 - Manage the quality and pace of work conducted on site.
 - ensure quality construction standards and the use of proper construction techniques
 - Provide strong document and project controls including monitoring RFI and Submittal traffic for potential cost/schedule impacts.
 - Thoroughly document, track and convey all action items and activities via meeting minutes, weekly and monthly project update reports.
 - Perform other Construction Management duties and assist Business Development functions as necessary.

QS engineer for variation order request at (CCC) consolidated contractors company
  • Egypt - Cairo
  • September 2013 to March 2015

Qatari Diar project (Nile cornice project)
Features:
Still under construction
2 towers each tower (4B+G+37 floors)
Full preparation for variation order requests (comparing between latest and contract IFCs, shop drawings and make a full study for variation order request (full take off, shop drawings and pricing schedule, full study for structure and architecture drawings and submission of variation order request )

project manger at abouzeid consultancy (Dr. Abdallah Abo Zeid coultancy office)
  • Egypt - Cairo
  • December 2010 to September 2013

• Mansour Chevrolet factory, 6 October city-Giza-Egypt

Features:
Admistration building
Ware house
Under ground tank






• Extension of Jolie Ville resort (kings island Luxor)
Features:
3 villas 350 m² each attached with swimming pool 190 m²
10 Bungalows (2 floors) 1200 m²
3 utility buildings
2 under ground tanks 3500 m³
Swimming pool 4300 m²

• Porto cairo mall (new cairo)

Features:
Still under construction
38, 000 m² (32 separate parts) Each part (B+G+1st+2nd)
Surveying works-boreholes-excavation works -soil replacement modified proctor tests-plain concrete raft & reinforced concrete raft separate reinforced concrete for separate bases foundations - flat slab floors-2 water tanks at basement-over basement slab lake.

senior site engineer at Al wefaq company for constructions
  • Qatar - Doha
  • February 2008 to December 2009

• 3 buildings in new Doha, Qatar
Features:
Each building (B+G+10 typical floors + bent house ) .raft
foundation flat slab and post tension concrete slabs .


Sharing in evaluation of a lot of projects such as:
• 20 villas in Om slal ali (Qatar)
• 3 buildings (each (B+G+7+bet house)).
• 16 villas in Markheya.(Qatar)
• 17 villas in Markheya.(Qatar)

_ Detailed drawings

_ bill of quantities .

_ quantities surveying.

design and supervisor engineer at ABOUZEID consultancy (Dr. Abdullah Abo zied Consultany office
  • Egypt - Cairo
  • February 2006 to February 2008

 The Lake View Resort, New Cairo - Egypt
Features:
• 27 villas, Flat slabs, Pyramid slabs, Swimming Pools.

 Katamya downtown mall, New Cairo - Egypt
Features:
• Solid slabs, lakes.

 Misr Sineen Resort, El Ein El Sokhna, El Zafarana Highway - Egypt
Features:
• Solid slabs, Swimming Pools.

 Many villas in different location such as 6 October, New Cairo, Elsherouk - Egypt
Features:
• Solid slabs, Hollow Blocks, Flat slabs, Swimming Pools.

 Jawharat el Haras Aljomhory (Nasr city- Cairo - Egypt)
Features:
• Bar Bending List for (Solid slabs-Beams-Flat slabs-Columns & Cores & Walls- Ramps- Raft).

• Porto Sokhna Resort, El Ain El sokhna
Features:
*Mall Building of 8 separate parts (B+G+1)
*3 main towers of each 6 building (Residential 2B+G+22)
*Labors home building (G+4).
Construction supervision
Work as construction supervisor engineer at :

. Eastern company factories
the eastern company factories-6 October city-Giza-Egypt

Features:
• Surveying works-boreholes-excavation works -soil replacement -modified proctor tests-plain concrete & separate reinforced concrete for separate bases foundations. Hollw blocks slabs .

• Porto Sokhna Resort, El Ain El sokhna, Egypt.

Features:
Surveying works-boreholes-excavation works - plain concrete&
raft foundations- flat slab and solid slabs .


 Egyptian decennial pool
Features:
• Share in revision of design works for several projects for the Egyptian decennial pool.
• Prepare technical reports such as S.R, R.D.R, P.R, F.R.
• Perform site visits to ensure the similarity of the executed works to the revised drawings.

design and supervisor engineer at Alexandria Consultant Office
  • Egypt - Cairo
  • August 2004 to February 2006

• Bitcho amerian city , El Maady, cairo, Egypt .
Features:
Surveying works-boreholes-excavation works -soil replacement -modified proctor tests-plain concrete & separate reinforced concrete for separate bases foundations - solid slabs .

Education

Bachelor's degree, Civil Engineering
  • at Ain shams university
  • July 2004

civil engineering

Specialties & Skills

Construction Design
CONSTRUCTION SUPERVISION
Primavera Project Planner
Word, Excel, Power point.
cad programs

Languages

Arabic
Expert
English
Expert
French
Beginner

Training and Certifications

(PMP) project mangement professional preparation course (Certificate)
Date Attended:
January 2012
Valid Until:
January 9999
site engineer (Certificate)
Date Attended:
July 2003
Valid Until:
July 2003