Avinash Shinde, Nagpur, Maharashtra  as Manager Instrumentation

Avinash Shinde

Nagpur, Maharashtra as Manager Instrumentation

Indorama Synthetics Ltd

Lieu
Inde - Nagpur
Éducation
Baccalauréat, B.E. (Electronics)
Expérience
20 years, 0 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :20 years, 0 Mois

Nagpur, Maharashtra as Manager Instrumentation à Indorama Synthetics Ltd
  • Inde
  • novembre 2012 à février 2014

ü Nov '12 to till today with Indorama Synthetics Ltd., Nagpur, Maharashtra as Manager Instrumentation

Pune, Maharashtra as Manager Automation à Century Enka Ltd
  • Inde
  • octobre 2009 à novembre 2012

ü Oct '09-Nov '12 with Century Enka Ltd., Pune, Maharashtra as Manager Automation

Manager Automation à Century Enka Ltd
  • Inde
  • octobre 2009 à novembre 2012

From Oct '09-Nov '12 with Century Enka Ltd., Pune, Maharashtra as Sr.Manager Automation

Responsible for New projects and upgradation of existing machine, day to day maintenance, planning and scheduling & effective maintenance of BARMAG Germany make total 14 lines of Nylon synthetic POY, FDY, LOY yarn manufacturing machines ( Extruder, Spinning and winding machines) Barmag craft-4R, 6R & ACW Winder, SW46SSD winders, Zinser & Tenijin seiki draw winder machines, Barmag Texturising FK6-6 FK6-12 machines, Rieter J5/10A draw twisters, Lawson Hampwel TYT machine, FAK-6 Knitting, Various laboratory equipment's like Statimate & Dynafill yarn testing machines, Kaiosaki Japan Uster yarn testing machine, Auxiliary spinning machine like Spintrak, Preheating stoves, Ultrasonic cleaners, Fourne Furnace, Acid Bath, TEG cleaning & Fluidized, Caustic Soda bath, Light band Meter.

Vapi, Gujarat as Manager Maintenance à Welspun India Ltd
  • Inde
  • avril 2006 à octobre 2009

ü Apr '06-Oct '09 with Welspun India Ltd., Vapi, Gujarat as Manager Maintenance

Maharashtra as Manager Production & planning à Microtek Controls
  • Inde
  • janvier 2004 à mars 2006

ü Jan '04-Mar '06 with Microtek Controls, Sangli, Maharashtra as Manager Production & planning

Mudsinghi, Maharashtra as a Asst. Manager Maintenance à Ved Textiles Ltd
  • Inde
  • avril 1999 à décembre 2003

ü Apr '99-Dec '03 with Ved Textiles Ltd., Mudsinghi, Maharashtra as a Asst. Manager Maintenance

Customer Support Engineer à M/S Nelco Ltd
  • Inde
  • janvier 1997 à janvier 1999

ü Jan '97-Jan '99 with M/S Nelco Ltd., Mumbai. as a Customer Support Engineer

Sangli, Maharashtra as a Electronics Engineer à M/S Nelco Ltd
  • Inde
  • janvier 1994 à décembre 1996

ü Jan '94-Dec '96 with Jaguar Techno Consults, Sangli, Maharashtra as a Electronics Engineer

KEY-DELIVERABELS
Project Management
• Spearheading project activities involving working out various requirements, preparation of data sheets & monitoring overall project operations for ensuring timely completion.
• Co-ordinating projects for the set up standards with accountability for strategic utilisation & deployment of available resources to achieve organisational objectives.
• Follow up and co-ordinating with all the departments & vendors such as shortage of material, defects, break downs, etc.
• Monitoring the project at sites and review of project schedule, ensuring cost control within budget, planning for cash flow requirements, etc.
Project Execution: • Complete Commissioning of Cotton Spinning Plant
• Complete erection & commissioning of Weaving plant
• Commissioning of Multi product dispensing system of Thies, Germany & Technorama Italy for textile Dying
• Commissioning of CME, USA make Tufting machines Commissioning of MCS dyeing machine for terry towel & EZM dyeing machine for bath rugs
• Commissioning of Brukner, Germany make 128mtr long Lactum coating machine for bath rugs.
• Replacement of obsolete Siemens make Simovert V inverters by latest Sinamics S120 & G120 Inverters.
• Replacement of old Chart recorders & Controllers for Synthetic yarn POY plant control room by Schneider make Viejo-Citect SCADA & PLC
• Commissioning of Barmag 7E8 & 9E4 extruders with down streams.
• Complete commissioning Synthetic yarn LOY lines with COMOLI, Italy WTU450 winders.

Quality Assurance / Energy Conservation
• Monitoring adherence to Quality Standards and maintaining the related documents for the same.
• Identifying assignable and chronic causes by the use of latest analysis techniques for eliminating wastage while enhancing plant efficiency and productivity.
• Implementing TPM techniques for energy conservation, entailing identification of opportunities, analysis of data, conduction of tests, cost benefit analysis, implementation & post audits.
• Executing cost saving techniques/ measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget.

Man Management
• Directing, leading & motivating workforce involving designers, suppliers, contractors and imparting continuous on job training for accomplishing greater operational effectiveness/ efficiency.
• Working on succession planning of the workforce, shift management activities, appraising the member's performance & providing feedback

Business Responsibilities: • Preparation of Business plan \[ Annual Budget estimation, Capital Expenditure, Major replacement\].
• Monitoring and reviewing Electrical, Instrumentation, contribution in COP and Inventory.
• Preparation of Operation Review and Performance Indices for the department

ATTAINMENTS

From Nov '12 with Indorama Synthetics Ltd., Nagpur, Maharashtra as Manager Instrumentation

M/s Indorama Synthetics (India) Ltd. Is a Global company having setup of 8000 CR fully Integrated Polyester Plant with installed Capacity of 1700 TPD in collaboration with E.I.Dupont U.S.A. and Zimmer, Germany for its CP (Continuous Polymerisation), POY (Partially Oriented Yarn) with Barmag Germany & PSF (Polyester Staple Fiber) with Toyobo Japan.
Including 51MW power plant and Coal fired Heaters for Dow and Sentotherm heating.

Responsible for New projects and upgradation of existing machine, day to day maintenance, planning and scheduling & effective maintenance of Zimmer, Germany make Continuous Polymerisation Plant having capacity of 480TPD and 450TPD (total 5 CP 2nos Zimmer and 3 nos Dupont having TPD1700);Autefa Germany make Complete auto packing system;Trane Chiller having total capacity of (1250 x 4 TR);IR make Centec compressors (8330x 3 Nm3) . Berthams FO oil fired Heaters. Coal fired Dowtherm and Sentotherm heaters. LTG France HVAC systems; Coperion Germany make PTA conveying system. Soken China Coal fired Heaters

Hands on experience on Foxboro Invensys DCS control system for Zimmer CP plant; Dell R720 oracle server with RAID 5 controller for Autefa auto packaging system.

Éducation

Baccalauréat, B.E. (Electronics)
  • à Shivaji University, Kolhapur
  • juillet 1993

Specialties & Skills

Documentation
Materials
Plant Maintenance
Project Management
ACCOUNTABILITY FOR
ENGINEER
INSTRUMENTATION
LABORATORY
MAINTENANCE
SCHEDULING
TESTING
ULTRASONIC

Langues

Anglais
Expert
Hindi
Expert
Marathi
Expert

Adhésions

Atomic Energy Regulatory Board Radiological Safety Division,
  • Radilogical Safety Officer
  • July 2013

Formation et Diplômes

Siemens S120 and G120 AC drives training (Formation)
Institut de formation:
M/s Siemens Ltd., Mumbai
Date de la formation:
September 2011
Durée:
56 heures
In House Training on Waste heat recovery Boilers (Formation)
Institut de formation:
M/s Thermax Ltd., Pune
Date de la formation:
January 2010
Durée:
16 heures
On Site Training Gas /CNG gas Wartsilla Power plant Engine (Formation)
Institut de formation:
M/S Wartsilla Ltd
Date de la formation:
March 2010
Durée:
16 heures
• Training at M/s Seimens Ltd.,Kalawa on Sinamics S120 /G120 AC Drives (Formation)
Institut de formation:
Siemens Ltd
Date de la formation:
August 2012
Schneider PLC's; AC drives (Formation)
Institut de formation:
M/s Schneider Electric Ltd
Date de la formation:
June 2011