- take care of all the Guarantee works as follow:
1- Periodic check and report (Daily, weekly, .....etc)
2- prepaire the previntive maintenance schedules based on the manifacturers recomendations and apply it by the owner engineers.
3- Make the maintenance training programes to the Owner's engineers and apply this training during the real trouble shooting.
4- Report all the details to MHI head office and request support if necessary wihout interruption to the units operation.
5- control and report the site money flow and report the monthly balance.
6- Represent MHI company to the Owner and represintaves.
1- Periodic check and report (Daily, weekly, .....etc)
2- prepaire the previntive maintenance schedules based on the manifacturers recomendations and apply it by the owner engineers.
3- Make the maintenance training programes to the Owner's engineers and apply this training during the real trouble shooting.
4- Report all the details to MHI head office and request support if necessary wihout interruption to the units operation.
5- control and report the site money flow and report the monthly balance.
6- Represent MHI company to the Owner and represintaves.
July 2004
To August 2006
Electrical and instrument site manager
at Mitsubishi Heavy Industries (MHI)
Location :
Egypt
- Manage all of the electric and instrument works
- supply the sub-contractor with all necessary documents, Drawings and supervise the construction works based on the contract quality and standerds>
- Hand over the constructed works to the Consultant and Owner>
- supply the sub-contractor with all necessary documents, Drawings and supervise the construction works based on the contract quality and standerds>
- Hand over the constructed works to the Consultant and Owner>
September 1994
To June 2004
technical consultant engineer
at Arab Swiss Engineering Co.
Location :
Egypt
cement plant of Beni suif ( Construction, start up and run)
Helwan Portlan cement factory ( upgrade and run )
Helwan Portlan cement factory ( upgrade and run )
June 2002
To June 2004
electrical chief engineer
at Hitachi
Location :
Japan
electrical chief engineer
August 1989
To August 1990
electrical supervisor engineer
at Toshiba technical servieces international
Location :
Japan
electrical supervisor engineer
commession engineer
commession engineer
July 1988
To August 1989
electrical construction engineer
at TDK Taihi Denigo Kaisha
Location :
Japan
manage the site technitions in the power control and instrument works.
Share on Facebook
Share on Twitter
Share Via Email