Total Years of Experience: 14 Years, 8 Months
October 2001
To March 2013
Senior Mech. Engineer
at Horse For Engineering / Tech. Dept.
Location :
Egypt - Alexandria
· FROM 15/10/2001 TILL NOW: Senior Mechanical Engineer in HORSE FOR ENGINEERING WORKS COMPANY . One of the biggest companies in EGYPT specialized in the design &construction of Waste water treatment plants& Pumping stations &Potable water plants with a capital exceeds 1.5 billion L.E. with the following responsibilties :
a- From 15/10/2001 till 11/9/2002 Procurment Engineer.
1. Responsible for communicating with foreign&local suppliers to get the best technical and economic offers for tenders.
2. Responsible for giving the order of confirmation to open the
Letter of credit .
3. Responsible for checking the certificates of origin &test
Certificate for equipment purchased .
b- From 11/9/2002 till now Senior Mechanical Engineer.
1. Responsible for preparing the technical mechanical offers for
Sewage pumping stations&Water treatment plants&Desalination Plants (R.O system).
2. Responsible for reviewing the drawings for making the Bill Of
Material (B.O.M) for the stations including all the mechanical equipment, pumps, valves, piping system, generating units….
3. Responsible for analyzing the water hammer phenomena for pipe lines and networks by using HAMMER v8i software by Bentley and Designing out the suitable solution for Anti-hammering.
a- From 15/10/2001 till 11/9/2002 Procurment Engineer.
1. Responsible for communicating with foreign&local suppliers to get the best technical and economic offers for tenders.
2. Responsible for giving the order of confirmation to open the
Letter of credit .
3. Responsible for checking the certificates of origin &test
Certificate for equipment purchased .
b- From 11/9/2002 till now Senior Mechanical Engineer.
1. Responsible for preparing the technical mechanical offers for
Sewage pumping stations&Water treatment plants&Desalination Plants (R.O system).
2. Responsible for reviewing the drawings for making the Bill Of
Material (B.O.M) for the stations including all the mechanical equipment, pumps, valves, piping system, generating units….
3. Responsible for analyzing the water hammer phenomena for pipe lines and networks by using HAMMER v8i software by Bentley and Designing out the suitable solution for Anti-hammering.
January 2001
To October 2001
PIPING SUPERVISOR
at TECNICAS REUNIDAS (T.R)
Location :
Egypt - Alexandria
1. Supervising the installation of pipes and pipe supports at site.
2. Supervising the punch list and pressure tests program.
3. Solving piping problems (site modifications).
4. Reinstatement and preparation for pre-commissioning.
2. Supervising the punch list and pressure tests program.
3. Solving piping problems (site modifications).
4. Reinstatement and preparation for pre-commissioning.
March 2000
To December 2000
PIPING CONSTRUCTION ENGINEER
at TTIL-SNC (TECHNIP)
Location :
Egypt - Alexandria
1. Supervising the installation of pipes and pipe supports at site.
2. Supervising the punch list and pressure tests program.
3. Coordinating the test packs flow among entities.
4. Solving piping problems (site modifications).
5. Reinstatement and preparation for pre-commissioning.
2. Supervising the punch list and pressure tests program.
3. Coordinating the test packs flow among entities.
4. Solving piping problems (site modifications).
5. Reinstatement and preparation for pre-commissioning.
June 1999
To March 2000
PIPING SUPERVISOR
at SAMSUNG FOR ENGINEERING WORKS
Location :
Egypt
1. Supervising all piping work (total piping net work 250, 000 Dia).
2. Plumping system for polyethylene plant.
3. Coordination with client for filed inspection of the above work item, including preparation of field inspection reports.
2. Plumping system for polyethylene plant.
3. Coordination with client for filed inspection of the above work item, including preparation of field inspection reports.
August 1998
To June 1999
MECHANICAL CONSTRUCTION ENGINEER
at TOYO ENGINEERING CORPORATION
Location :
Egypt - Alexandria
1. Assembly and erection of flare Stack (75Mt)
2. Assembly and installation of air fin coolers, 12 nos., each consisting of support structure, plenum, bundle and drive unit.
3. Fabrication & installation and insulation of Air conditioning duct system (HVAC) including Equipment settings (A/c Unit (package), Blower/ filter) and piping work.
4. Coordination with client for field inspection of the above work item, including preparation of field inspection reports.
2. Assembly and installation of air fin coolers, 12 nos., each consisting of support structure, plenum, bundle and drive unit.
3. Fabrication & installation and insulation of Air conditioning duct system (HVAC) including Equipment settings (A/c Unit (package), Blower/ filter) and piping work.
4. Coordination with client for field inspection of the above work item, including preparation of field inspection reports.
Share on Facebook
Share on Twitter
Share Via Email