Bahaa-Edden إبراهيم, Senior Electrical Engineer

Bahaa-Edden إبراهيم

Senior Electrical Engineer

Suido Kiko Middle East

البلد
المملكة العربية السعودية - الرياض
التعليم
بكالوريوس, Electrical engineering/power
الخبرات
18 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 3 أشهر

Senior Electrical Engineer في Suido Kiko Middle East
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ أغسطس 2013

 Accomplishes electrical engineering human resource objectives by recruiting, selecting, orienting, training, assigning, scheduling and disciplining employees.

 Achieves electrical engineering operational objectives by contributing electrical engineering information and recommendations to strategic plans.

 Plans electrical projects by determining specifications; selecting contractors; establishing installation schedules; planning shut-downs and installations; integrating requirements with architectural and mechanical designs; verifying code requirements; updating cost estimates.

 Completes electrical projects by supervising installations; resolving design issues.

 Design power system MV & LV including : Load flow, Short circuit, Protection Coordination, Motor Start, Transformer & Generator sizing, Cable ampacity, Earthing & Lightning, Power factor correction Calculations .

 Perform Power system analysis using Computer Aided Software: ETAP, SKM power, Ecodial, ABB desktop software, EPLAN .

Electrical Project Engineer في Suido Kiko Middle East
  • المملكة العربية السعودية - جدة
  • سبتمبر 2008 إلى أغسطس 2013

 Supports the Project Manager in accomplishing all the goals and targets for the electrical activities at site.
 Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment and tools required for all electrical and related works prior to execution.
 Plans and analyses all possible construction methodologies and recommends the best options to the Project Manager for approval prior to execution at site.
 Interprets construction drawings and studies the contract documents and applicable standards or specifications prior to execution of any jobs.
 Manages directly and provide engineering and technical supports to all the electrical work groups at site.
 Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards.

Design and Erection for :
 Power Transformers, Diesel generators, MCC panel, Cable, Cable Tray, Switchgears, Fault Protection devices, Soft starter, Power factor corrections capacitors, Variable frequency Drive (VFD), Earthing system, internal and external lighting, Air conditioning (HVAC).

Site Engineer في Fawze Sawalha Est
  • الأردن - عمان
  • فبراير 2006 إلى أغسطس 2008

 Generally responsible for implementations and monitoring of all electrical related works at site.
 Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works.
 Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.
 Supervise the following activities :
- Diesel generator: Installation, Testing and Commissioning.
- Automatic Transfer Switch (ATS): Installation and Commissioning.
- Power Transformer: Installation, Testing and Commissioning.
- Motor Control Center (MCC) panel: Fabrication, Testing, Installation.
- Cable: Pulling, Testing, Termination.
- Internal and external Lighting : Installation .

الخلفية التعليمية

بكالوريوس, Electrical engineering/power
  • في Mu'tah University
  • يناير 2006

when I graduated , I was the second on electrical department .

الثانوية العامة أو ما يعادلها, Scientific branch
  • في Ader secondary school
  • يوليو 2001

I was the first in public secondary exam( Tawjihi ) on my school level

Specialties & Skills

Materials
Inspection
Installation
Testing
Protection
MS Office
Primavera III
AutoCAD 2007
PLC programming
Quantitative Analysis
MS Project
Power system Analysis by Computer Aided Software

اللغات

الانجليزية
متوسط
العربية
متمرّس

العضويات

IEEE
  • Member
  • July 2014

التدريب و الشهادات

ETAP 115 Power System Engineering Workshop (تدريب)
معهد التدريب:
ETAP
تاريخ الدورة:
December 2013
المدة:
50 ساعة
EH Instruments in Power & Energy Industry (تدريب)
معهد التدريب:
Endress+Hauser
تاريخ الدورة:
May 2014
المدة:
60 ساعة
Art of Project Management & PMP Exam Preparation (تدريب)
معهد التدريب:
Change Consulting & Training
تاريخ الدورة:
June 2012

الهوايات

  • Sport (Basketball)
  • Reading