O&M Technician HUAWEI Projects
Renovision Automation Services Pvt. Ltd
Total years of experience :8 years, 8 months
D Renovision Automation Services Pvt. Ltd
O&M Technician HUAWEI Projects
Operator: BSNL KERALA
JULY 2010 - till date
Responsibilities: • Installation and integration HUAWEI BTS
• Huawei IDU and ODU changing
• BTS & Microwave side alarms clearing.
• Daily site visiting and punch points clearing.
• Take VSWR sweeps of feeder and tail cables
• Operation and maintance of DELTA, ELTEK and EMERSON power plant and AMF panel, piu,
• VSWR (Anristu, Bird) meter.
• Preventive maintanance of DG, power plant, AMF, panel
Test & Measuring Instruments
- Site Analyzer (Anritsu, Bird)
- Power meter
- BER meter
C AIRON TELESERVICES Ltd
Sep - 2008 to June - 2010
Installation Technician
Responsibilities: • Installation and integration HUAWEI BTS
• Commissioning of FIU using Nokia Hopper Manager
• Take VSWR sweeps of feeder and tail cables
• Have worked on DELTA, ELTEK and EMERSON power plant
• VSWR (Anristu, Bird) meter.
• HUAWEI AND NEC Microwave installation & Alignment for1.8 1.2 0.6 (18GHZ, 15GHZ, )
• HUAWEI MUX INSTALATION DONE 25 SITES
B TELECOM ONE Teleservice Pvt Ltd
Installation team leader.
June 2007 - August 2008
Responsibilities: • Installation and integration Nokia FLEXI, Ultra, metro BTS
• Commissioning of FIU using Nokia Hopper Manager
• Troubleshooting experience in NOKIA BTS
• Take VSWR sweeps of feeder and tail cables
• Have worked on DELTA, ELTEK and EMERSON power plant
• Have worked on armade cable rooting and amf panel instalation
• Propperly instaled ERTH BIT and eqpment erthing
• Nokia Microwave installation & Alignment for1.8 1.2 0.6 (18GHZ, 15GHZ, 7GHZ)
• Installation of Ericsson BTS for Airtel Mobile Services
• Checking and correcting signal parameters like VSWR by using BIRD site Analyzer, Anristu analyzer
A DTech Engineering Pvt. Ltd.
INSTALATION AND O&M TECHNITION
May 2005 - June 2007
Responsibilities: • Installation and integration Nokia FLEXI, Ultra, metro BTS
• Commissioning of FIU using Nokia Hopper Manager
• Troubleshooting experience in NOKIA BTS
• Take VSWR sweeps of feeder and tail cables
• Have worked on DELTA, ELTEK and EMERSON power plant
• Have worked on armade cable rooting and amf panel instalation
• Propperly instaled ERTH BIT and eqpment erthing
• Nokia Microwave installation & Alignment for1.8 1.2 0.6 (18GHZ, 15GHZ, 7GHZ)
• Checking and correcting signal parameters like VSWR by using BIRD &Anristu analyzer