Cesar Jr Legaspino, Operator - Power Generation

Cesar Jr Legaspino

Operator - Power Generation

Adnoc Offshore

Location
United Arab Emirates - Abu Dhabi
Education
Bachelor's degree, Mechanical Engineering
Experience
15 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 11 Months

Operator - Power Generation at Adnoc Offshore
  • United Arab Emirates - Abu Dhabi
  • My current job since October 2019

 Generates up to 252 MW of electricity that supply to Upper Zakum Offshore Oil Field that produces up to 1 million BOPD.
• Performed start - up, shutdown and emergency operation safely and efficiently of open cycle 6 x 42 MW GE (PG6581B) Gas Turbines with DLN 1.0 Combustion System and Mark V1e Control System during commissioning and production phase.
• Records, monitors, and evaluates operating system parameters such as temperature, pressure, generation, and electrical parameters and make necessary adjustment for optimum gas turbine performance and to prevent breakdowns.
• Reduced time, fuel consumption and emission during start - up by innovating start - up procedure.
• Review and confirmed process Lock Out Tag Out as per ADNOC PTW policies before releasing the permits.
• Performed plant operational weekly and monthly routine schedule safety and without disturbance to the system.
• Trained, supervised, and mentor newly hired operators.

Senior Operator - Power Station at Dubai Electricity & Water Authority
  • United Arab Emirates - Dubai
  • October 2014 to October 2019

 Generates up to 13 000 MW of electricity and 490 MIGD of water that supplies the City of Dubai in United Arab Emirates.

• Performed plant start - up, shutdown and emergency operation of:
 Cogeneration Cycle 3 x 125 MW GE (PG9171E) Gas Turbine with DLN 1.O Combustion System with 3 x 250 T/H and 11.0 bar KHIC HRSG.
 Combine Cycle 2 x 100 MW GE (PG9161E) Gas Turbine with 2 x Dual Steam Drum of 197 T/H, 73 bar and 36 T/H, 6.4 bar ABB HRSG.
 1 x 112 MW Condensing type ABB Steam Turbine.
 1 x 58 MW Ansaldo Energia Back Pressure Steam Turbine.
 2 x 350 T/H and 30 bar KHIC Auxiliary Thermal Boiler.
 4 x 7 MIGD KHIC Multistage Flash Evaporator Desalination Plant.
• Records, monitor, and maintain operating parameters to control and achieve reliable and efficient operations.
• Report abnormalities and defects to supervisor and take necessary corrective action.
• Assist Shift in Charge/Supervisor for raising work orders, issuing PTW and preparing plant daily status report.

Operator - Power Station at Dubai Electricity and Water Authority
  • United Arab Emirates - Dubai
  • September 2012 to October 2014

 Generates up to 13 000 MW of electricity and 490 MIGD of water that supplies the City of Dubai in United Arab Emirates.

• Assist in start-up, shutdown and emergency operation of the Cogeneration Cycle, Combine Cycle, Thermal Boilers and MSF Desalination plant as per instruction.
• Report abnormalities/ defects observed in the field to the supervisor and follow up with senior operator for defect rectification.
• Monitor and record local operating parameters and equipment status for reliable and safe operations.
• Performed plant operational routine schedule for the shift in coordination with senior operator.
• Performed process isolation/normalization as per DEWA PTW policies.

Control Room Engineer at Cebu Energy Development Corporation
  • Philippines
  • April 2009 to September 2012

 Generates up to 256 MW of electricity that supply to Philippine grid.

• Performed plant start - up, shutdown and emergency operation of 3 x 300 T/H and 126 bar Alstom CFBC Coal Fired Boiler and 3 x 82 MW Condensing type Kawasaki Steam Turbine and its auxiliaries.
• Adjust controls to generate specified electrical power or to regulate the flow of power between generating units.
• Records, monitors, and evaluates operating system parameters such as temperature, pressure, tank levels and flow trend curves and make necessary recommendations to the Shift Supervisor for optimum boiler/steam turbine performance and to prevent breakdowns.
• Monitors and interprets DCS system alarm indications of equipment malfunction and troubleshoots abnormalities during the shift and indicates remedial measures to prevent unnecessary downtime.
• Communicates with plant dispatch to regulate and coordinate line voltages and transmission loads and frequencies at normal operation.

Associate Engineer at Lear Corporation
  • Philippines
  • May 2008 to April 2009

Education

Bachelor's degree, Mechanical Engineering
  • at University of Cebu
  • March 2008
High school or equivalent, Welding Technology
  • at Don Bosco Balamban Technological Center
  • March 2002

Specialties & Skills

Steam Turbines
Gas Turbines
Field Operations
Power Plant Operations
Boilers
GAS TURBINES
STEAM TURBINES
BOILERS
COMPRESSORS
CONTROL SYSTEMS
COOLING SYSTEMS
OPERATIONS

Languages

English
Expert
Filipino
Expert

Training and Certifications

Work Values and Attitude Program (Training)
Training Institute:
University of San Carlos - Psychology Department
Date Attended:
June 2009
Duration:
16 hours
Basic Operation of AFBC/CFB/Steam Turbine and Generator (Training)
Training Institute:
Global Business Power
Date Attended:
June 2009
Duration:
768 hours
CFB Boiler Power Plant Basic Concept (Training)
Training Institute:
Formosa Heavy Industries Corporation
Date Attended:
September 2009
Duration:
40 hours
GE Mark V1e Operation Course (Training)
Training Institute:
GE Oil and Gas
Date Attended:
February 2016
GE 9E DLN 1.0 Operational Overview (Training)
Training Institute:
GE Power
Date Attended:
September 2018
Basic H2S Training (Certificate)
Date Attended:
October 2019
Valid Until:
October 2021
Basic Offshore Safety Induction Emergency Training (Certificate)
Date Attended:
October 2019
Valid Until:
October 2023
Basic Supervisory Training Course (Training)
Training Institute:
Measure Up Enterprise Consulting
Date Attended:
May 2009
Duration:
40 hours
Basic Safety Training (Training)
Training Institute:
Department of Labor and Employment
Date Attended:
April 2009
Duration:
32 hours
Integrated Risk Based Management (Training)
Training Institute:
Linc International Management and Consulting Group
Date Attended:
April 2009
Duration:
24 hours
Failure Mode Effect Analysis/8D Problem Solving Technique/Kaizen/Measurement System Analysis (Training)
Training Institute:
Bersales Consultancy
Date Attended:
May 2009
Duration:
64 hours

Hobbies

  • Sports
  • Reading Books