Total Years of Experience: 19 Years, 7 Months
December 2013
To Present
Commissioning Engineer-HPCM / ICAPS
at Cegelec UAE
Location :
Oman - Khasab
• Management of the Hyundai Pre-commissioning and Commissioning Management System database (HPCM), data importing to HPCM, printing test forms, preparing commissioning dossiers, and doing commissioning and pre-commissioning follow ups.
• Coordination with engineering disciplines and project management.
• Coordination with engineering disciplines and project management.
January 2012
To September 2012
CMS Administrator / Document Controller
at DAEWOO ENGINEERING & CONSTRUCTION Co., Ltd
Location :
United Arab Emirates
DAssistance to engineering equipment list preparation for pre-commissioning and commissioning operations.
Checking all Items in marked-up Drawings P&ID and input to DW-CMS by System and Sub-system.
Preparation of the pre-commissioning and commissioning task database.
Preparation of Equipment List by System and Sub-system.
Preparation of test sheets and check sheets.
In charge of receiving and compiling of commissioning documents, manual and procedures.
Done other Duties assigned by Manager.
Checking all Items in marked-up Drawings P&ID and input to DW-CMS by System and Sub-system.
Preparation of the pre-commissioning and commissioning task database.
Preparation of Equipment List by System and Sub-system.
Preparation of test sheets and check sheets.
In charge of receiving and compiling of commissioning documents, manual and procedures.
Done other Duties assigned by Manager.
July 2009
To January 2012
ENGINEERING STAFF/Q.A Inspector
at HANJIN HEAVY INDUSTRIES AND CONSTRUCTION CO., LTD
HANJIN HEAVY INDUSTRIES AND CONSTRUCTION CO., LTD. Subic, Philippines
HHIC-Subic Shipbuilder Corporation
Position: ENGINEERING STAFF/Q.A Inspector
Department: QUALITY ASSURANCE TEAM (Electrical Outfitting)
Duration: July 02, 2009- January 20, 2012 (2.5 Years)
JOB DETAILS
• Conduct quality assurance inspection in all electrical and installation activities related to: • Safety function test of Main Engine, Main Generator and Emergency Generators, MSBD, ESBD,
• Installation and testing of Ship's tank sensors, Alarm Monitoring System (AMS), Navigational System, Power System, Lighting System, Fire and General Alarm Systems, Communication Systems, Automation and Cable Installation with Owners representative and Class Society Surveyors.
• Witnessing and documenting all testing and inspection with Owner's representative and Class surveyors.
• Conducting inspections for all electrical and navigational equipments deliveries at Wharehouse.
• Conducting inspections according to test procedures, and ITP.
• Attending weekly/monthly Meeting with the Owners representative, Class Surveyors and the Production part.
• Preparation of inspection and test plans including check sheets, testing devices as required by the building specifications, regulations, builder's standard and other necessary requirements in coordination with the concerned production part to avoid rejections and cancellations of inspections.
• Record and update final inspection results into the computerized on-line system as soon as possible and compile all the necessary documents approved by the inspector, owner and/or classification surveyor
• Ensuring that all equipments used are calibrated and with valid certificates.
• Attending sea trials.
• In charge of owner & class Non-conformity Reports (NCR) and comments during inspection and seatrial.
• Making Patrol reports, weekly inspection monitoring and self-inspect before final inspection of the eqiupments.
• Review type approve and individual certicifates of the materials and equipments.
• Perform duties related to requirements of ISO 9001:2008
Project Handled/Involved
Inspection of P007 to P0012
Owner: NSC, (6) Container Ship: 4, 300 TEU
Classification Society: Germanisher Lloyds (GL)
Inspection of P0016 to P0019
Owner: CMA CGM, (4) Container Ship: 3, 600 TEU
Classification Society: Bureau Veritas (BV)
Inspection of P0015
Owner: EREGLI, 175, 000MT Bulk Carrier
Classification Society: Lloyd's Register of Shipping (LR)
Inspection of P0063
Owner: STAR BULK, 180, 000MT Bulk Carrier
Classification Society: American Bureau of Shipping (ABS)
Inspection of P0065
Owner: RIO TINTO, 205, 000MT Bulk Carrier
Classification Society: Lloyd's Register of Shipping (LR)
TRAININGS/SEMINARS ATTENDED
Six Sigma yellow belt training
HHIC-Subic Shipbuilder Corporation
Position: ENGINEERING STAFF/Q.A Inspector
Department: QUALITY ASSURANCE TEAM (Electrical Outfitting)
Duration: July 02, 2009- January 20, 2012 (2.5 Years)
JOB DETAILS
• Conduct quality assurance inspection in all electrical and installation activities related to: • Safety function test of Main Engine, Main Generator and Emergency Generators, MSBD, ESBD,
• Installation and testing of Ship's tank sensors, Alarm Monitoring System (AMS), Navigational System, Power System, Lighting System, Fire and General Alarm Systems, Communication Systems, Automation and Cable Installation with Owners representative and Class Society Surveyors.
• Witnessing and documenting all testing and inspection with Owner's representative and Class surveyors.
• Conducting inspections for all electrical and navigational equipments deliveries at Wharehouse.
• Conducting inspections according to test procedures, and ITP.
• Attending weekly/monthly Meeting with the Owners representative, Class Surveyors and the Production part.
• Preparation of inspection and test plans including check sheets, testing devices as required by the building specifications, regulations, builder's standard and other necessary requirements in coordination with the concerned production part to avoid rejections and cancellations of inspections.
• Record and update final inspection results into the computerized on-line system as soon as possible and compile all the necessary documents approved by the inspector, owner and/or classification surveyor
• Ensuring that all equipments used are calibrated and with valid certificates.
• Attending sea trials.
• In charge of owner & class Non-conformity Reports (NCR) and comments during inspection and seatrial.
• Making Patrol reports, weekly inspection monitoring and self-inspect before final inspection of the eqiupments.
• Review type approve and individual certicifates of the materials and equipments.
• Perform duties related to requirements of ISO 9001:2008
Project Handled/Involved
Inspection of P007 to P0012
Owner: NSC, (6) Container Ship: 4, 300 TEU
Classification Society: Germanisher Lloyds (GL)
Inspection of P0016 to P0019
Owner: CMA CGM, (4) Container Ship: 3, 600 TEU
Classification Society: Bureau Veritas (BV)
Inspection of P0015
Owner: EREGLI, 175, 000MT Bulk Carrier
Classification Society: Lloyd's Register of Shipping (LR)
Inspection of P0063
Owner: STAR BULK, 180, 000MT Bulk Carrier
Classification Society: American Bureau of Shipping (ABS)
Inspection of P0065
Owner: RIO TINTO, 205, 000MT Bulk Carrier
Classification Society: Lloyd's Register of Shipping (LR)
TRAININGS/SEMINARS ATTENDED
Six Sigma yellow belt training
June 2003
To January 2011
at QUALITY MANAGEMENT SYSTEM AWARENESS
Sponsored by Globe at HHIC-Phil yard, June 2-3, 2011
QUALITY MANAGEMENT SYSTEM AWARENESS (QMS)
KEY PERFORMANCE MEASUREMENT (KPM)
CONTROL OF RECORDS
QUALITY COST TRAINING
Conducted by QA team at HHIC-Phil Shipyard, April 16-may 14, 2011
Basic SOLAS, MARPOL
Welding Procedure Specification
INSPECTION OF ELECTRIC & AUTOMATION PLANTS
QUALITY MANAGEMENT SYSTEM AWARENESS (QMS)
KEY PERFORMANCE MEASUREMENT (KPM)
CONTROL OF RECORDS
QUALITY COST TRAINING
Conducted by QA team at HHIC-Phil Shipyard, April 16-may 14, 2011
Basic SOLAS, MARPOL
Welding Procedure Specification
INSPECTION OF ELECTRIC & AUTOMATION PLANTS
(ABS) Class Surveyor
at American Bureau of Shipping
Conducted by American Bureau of Shipping (ABS) Class Surveyor
HHIC-Phil Shipyard, September 18, 2010, field office 11-B
HHIC-Phil Shipyard, September 18, 2010, field office 11-B
July 2009
To September 2009
at Electric Outfitting Inspection
Electric Outfitting Inspection
HHIC-Phil Shipyard Subic, Zambales
Two months (2) Training
July-September 2009
Tarlac II Electric Cooperative, Inc. (TARELCO II), Concepcion, Tarlac
HHIC-Phil Shipyard Subic, Zambales
Two months (2) Training
July-September 2009
Tarlac II Electric Cooperative, Inc. (TARELCO II), Concepcion, Tarlac
January 2009
To March 2009
On the Job Trainee
at Technical Service Department
On the Job Trainee (Technical Service Department)
January-March 2009
January-March 2009
Share on Facebook
Share on Twitter
Share Via Email