project engineer
ACES
Total years of experience :15 years, 8 months
Working as project engineer in Telecom company(ACES) for the electormechaniacl installation for GSM sites(Mobilly &Zain &STC) operators as I have experience in
• DC power system(rectifier &inverter &UPS&batterries)installing, design, making configuration and solving troubleshooting .
• Making survey and preparing load calculation for electrical equipment room(power cable design& C.B Rating& lighting calculation & fire system design &air-condition capacity calculation and HVAC design &tower light &door access installing)
• Generators &ATS design installing maintenance.
• Fire system and fire fighting installing&maintainance.
• HVAC and air condition maintenance.
• Installing solar cell sites
• Tower light installation.
• Prepare required documentation (FIS &BOQ s)and making handover for site
• Having experience in civil work survey for tower, shelter, H beams, pedestal installation .
• Having experience in indoor projects.
• Alarm checking on BTS and working with site master.
Project working in this field
• Mobilly L+5, 6, 8 projects
• Stc project 2010&2011, Nemo project, battery replacement project, power plant INSTALLTION in madinah and jadah exchange
• Zain RDS 2010 project.
Working as electrical engineering in El Rehab Company for electromechanical installation including
the electromechanical work for water station including (pumps, generators, control panels, valves)
low current (BMS, chillers, fire system, lighting, appliance, CCTV, calling system)
medium voltage including.RMU switch gear, distribution board
.