subcontract manager
OHL
Total years of experience :19 years, 1 Months
LPG sphere/jet fuel/fire water tank construction
30KM piping works from different types GRP HDPE Carbon Steel ductile iron in addition of equipment
Al Manakher IPP4 Power Plant - Electro-Mechanical. Amman - JORDAN Employer: Wartsila Details:Complete Electro-Mechanical Erection Works for 280MW (16 Gensets x 17.5MW) Tri-Fuel Power Plant, including all Equipment Piping, Insulation, Painting, Electrical and Control Erection and Testing Works for the biggest Tri-Fuel Plant in the World. Commencement: June, 2013 Completion: March, 2014 Al Manakher IPP4 Power Plant - Civil Works. Amman - JORDAN Employer: Wartsila Details: Steel Structure Buildings Including Power Houses, Administration and Workshop Buildings, Stacks, Ventilation Fans, HVAC and Electro-Mechanical Services. Commencement: May, 2013 Completion: December, 2013 Wartsilla Power Plant -IPP4 The IPP4 Al-Manakher power plant is to be installed next to the existing power plant of AES in Amman, Jordan on a fast-track, turnkey basis, and is scheduled to be fully operational by July 2014. The power plant will supply electricity to the country’s national grid. The power plant will be running on a total of 16 Wärtsilä 50DF dual-fuel engines. It will be capable of using heavy fuel oil (HFO), distillate (DFO) or natural gas as fuel. It is expected that initially the plant will operate using HFO, but the fuel flexibility of Wärtsilä’s engine technology will enable a seamless transfer to environmentally sustainable natural gas operation once the infrastructure for a natural gas supply is in place.
Samra Power Station Fast Track Simple Cycle Combustion Turbine. Al Zarqa - JORDAN
Employer: METKA
Details: Electo-Mechanical work for 146MW power plant consist of one Gas Turbine Alstom GT13E2, auxiliaries, balance of plant and piping. The project will be carried out on a fast track basis.
Commencement: December, 2012
Completion: May, 2013
Aqaba Container Terminal - Bam International Land Side Works Consisting of Earthworks (Excavation and Backfilling). Precast Concrete Works, Infrastructure (Fire Fighting, Electrical Services and Drainage), and all Structural Paving Works of 85, 000m² storage yards. And Pile Welding and coating. Responsibilities • Mobilization And De-mobilization Plan • Review project tenders to determine time frame, funding limitations, procedures for accomplishing project, staffing requirements (Sub-Contractors), and allotment of available resources to various phases of project. • Establish work plan and staffing for each phase of project. • To ensure that all site activities in accordance with the company & Clint QEHS Plan, and follow up all Corrective Action may needed in any violations. • Direct and coordinate activities of project personnel to ensure project progresses on Schedule and within prescribed budget. Team Under My Direct Supervision Key Staff; 2 Superintendents 2 Site Engineers 2 Supervisors 12 Forman Manpower; 500 tech.& Labor
Jordan Bromine Plant Expansion Project " Shutdown Project included: FRP 24” Pipe Line 4 Km, Piping work, Rubber Lined Piping, Glass Lined Piping, Pumps Replacement, Glass Lined Vessels Replacement, Rubber Lined Drums Replacement, Overhead Cranes Replacement, Titanium Equipment Replacement, Variable Electrical and instrument Works " Team Under My Direct Supervision Key Staff; 2 Site Engineers 1 Supervisor 6 Forman Manpower; 300 tech.& Labor
Qatrana Combined Cycle Power Project (372MW)
Mech. Equipment Erection )
• Fuel Oil System
Forwarding Pumps
Fuel metering
Duplex Coalescer Filter
Electric Heaters
Fuel Oil Piping
• Fuel Gas System
Filter Separator
Performance Heater
Pressure Reducing System
Electric Heaters
Knock Drum
Fuel Gas Piping
• Air Compressors
• Air Dryers
• Water Treatment Plant
Ultra Filter Skid
Backwash Tank
Chemical Skids
R/O
• Black Start & Emergency Diesel Generators
• Heat Recovery Steam Generator (HRSG)
Steel Structure
HRSG Casing
Modules
Drums
• Boiler Feed Pumps
• Steam Turbine Fin Fan Cooler
Arab Potash Company (APC) Equipment & (HVAC)- PetroJet
Install all HVAC for all New APC Expansion Plant, Including Ventilation System For the Main Conveyer belt Tunnel, Switchgear Rooms, and Administrational Buildings
Team Under My Direct Supervision
Key Staff; 2 Site Engineers
2 Forman
Manpower; 100 tech.& Labor
Scope Of Work
Switch Gear Room HVAC System Main Where house Ventilation system
Conveyer belt Tunnel Ventilation Office Buildings HVAC
Responsibilities
• Mobilization And De-mobilization Plan
• Pricing new tenders & review all Documents
• Engineering & Procurement including all shop Drawings generating and as built
• Review project tenders to determine time frame, funding limitations, procedures for accomplishing project, staffing requirements (Sub-Contractors), and allotment of available resources to various phases of project.
• Direct supervision of all site activates
• To ensure that all site activities in accordance with the company & Clint QEHS Plan, and follow up all Corrective Action may needed in any violations.
• Direct and coordinate activities of project personnel to ensure project progresses on Schedule and within prescribed budget.
Team Under My Direct Supervision
Key Staff; 2 Site Engineers
1 Supervisors
Forman
Manpower; 25-80 tech.& Labor
Achievements
this period has it major effect of shaping the career, from the variable experience according to the many types project with supervising, Engineering and procurement,
Project type Project Name Systems
Hospitals "USAID Health System Strengthening (HSS), Major Renovation Works - LOT2
• Prince Hashem Hospital(al Zarqa),
• Nadim Hospital(Madaba),
• Ghor alsafi Hospital
" HVAC (Chillers, Ducting, FCU, AHU), Firefighting, Plumbing, Medical Gases
Hotels: Marriott Hotel-Amman HVAC Renovation Works HVAC (Chillers, Ducting, FCU, AHU)
Ware Houses: Union Tobacco Warehouse-Qastal HVAC (Chillers, Ducting, FCU, AHU), Firefighting.
AL-Deasa Warehouse-Free Zone HVAC (Chillers, Ducting, FCU, AHU), Firefighting, Plumbing
Samra Phase l Combined Cycle 300MW - Electrical, Mechanical and Earth Works. Amman - JORDAN
Employer: Black & Veach - GAMA J.V. - SEPGCO
Details: Electro-Mechanical installation of a complete combined cycle power plant of 300MW capacity comprising two GE frame 9E gas turbines. Two heat recovery steam generators, steam turbine and generator, air cooled condenser, water treatment plant, all electrical systems including 400KV step up transformers, control centers, DCS system, cabling and raceways and Complete Earth Works consisting of 400, 000m?of Backfilling and 100, 000m?of Excavation.
Commencement: September, 2004
Completion: September, 2006
Samra Combined Cycle Phase I- Black & Veach - GAMA J.V.
Type Of Work
Electromechanical installation of a complete combined cycle power plant of 300MW capacity comprising two GE frame 9E gas turbines. Two heat recovery steam generators, steam turbine and generator, air cooled condenser, water treatment plant, all electrical systems including 400KV step up transformers, control centers, DCS system, cabling and raceways.
Responsibilities
Welding Quality,
WPS, PQR, Welders Qualifications
All Site Inspection & NDT
Certified Crane and Rigging Inspector
Welding Inspection
Mechanical Engineering