MECHANICAL ENGINEER
ROMPETROL SA LIBYAN BRANCH
Total years of experience :25 years, 11 months
Main activities and responsibilities
Organizes and supervises the maintenance activities of machinery, equipment and installations for WORKOVER.
Short description of equipment on drilling or workover rig / ship / others
Drilling rigs with maximum working load hook 200 tons, KREMCO 750, KREMCO 600 and TW 125
Drawworks: K750D, K600D.
Traveling block: BJ Unimatic 6250, 250 t.
Swivel: CH 200.
Mud pump triplex: National 9-P-100, 3PN 500, 3PN 700
Supercharging pump: Mission centrifugal pump.
Air compressor: 2EC 10, Sullair.
Diesel engine: Detroit 6V 92, Detroit 8V, Caterpillar CAT 3408,
CAT 3412, CAT 3512, C15, Perkins 1100, 1300, 2300
Main activities and responsibilities
Organizes and supervises the maintenance activities of machinery, equipment and installations for WORKOVER and administrative activity.
Short description of equipment on drilling or workover rig / ship / others
Workover rigs with maximum working load hook 100 tons, T50 and P80.
Main activities and responsibilities
Organizes and supervises the maintenance activities of machinery, equipment and installations for WORKOVER.
Short description of equipment on drilling or workover rig / ship / others
Drilling rigs with maximum working load hook 200 tons, KREMCO 750, KREMCO 600 and TW 125
Drawworks: K750D, K600D.
Traveling block: BJ Unimatic 6250, 250 t.
Swivel: CH 200.
Mud pump triplex: National 9-P-100, 3PN 500, 3PN 700
Supercharging pump: Mission centrifugal pump.
Air compressor: 2EC 10, Sullair.
Diesel engine: Detroit 6V 92, Detroit 8V, CAT 3408, CAT 3412, CAT 3512; Perkins 1100, 1300, 2300.
Main activities and responsibilities
Organize, coordinate, check and is responsible for conducting the entire maintenance activities, and managing all technical equipment for DRILLING of the Company
Short description of equipment on drilling or workover rig / ship / others
Drilling rigs with maximum working load hook 100 to 200 tons.
Drawworks: Corsair 500, National 600, TF 15, TF 20.
Crown block: Crane Carrier 150 MT, National 190 MT, GF 200.
Traveling block: Sowa 150 MT, Web Wilson 160 MT, MCF 200.
Rotary table: Gardner Denver 17 ½, MRS 20 ½.
Swivel: CH 125.
Mud pump triplex: 3PN 1000, Gardner Denver PZ 7, Gardner Denver 1PY 172.
Supercharging pump: Mission centrifugal pump, AG 150 - 400 x 75.
Air compressor: Irmair, Rollair, 2EC 10.
Diesel engine: Caterpillar CAT 3408, CAT 3412, CAT 3512
Main activities and responsibilities
I coordinated the DRILLING equipments repair and organize their expertise
Short description of equipment on drilling or workover rig / ship / others
Drilling rigs with maximum working load hook 100 to 200 tons, F 125 EC and F 200 EC, manufactured UPETROM 1 MAI SA Ploiesti
Main activities and responsibilities
I coordinated the maintenance, overhaul and repair of mining equipment from the company
Short description of equipment on drilling or workover rig / ship / others
Mining equipment
Main activities and responsibilities
Scheduling and monitoring achievement of plans review and repair of mining equipment, track consumption of fuel, lubricants, materials and spare parts.
Short description of equipment on drilling or workover rig / ship / others
Mining equipment
KREMCO 750, KREMCO 600, TW 125, National 4226, CCC 500, F 100 - 2DH, F 100 -EC, F 125 EC, F 200 EC
Type of Top Drives
N/A
Type of drawworks
K750D, K600D, TF 15E, TF 20E, TF 25E, Corsair 500, National 600
Type of mud pumps
Triplex mud pump National 9-P-100, 3PN 500, 3PN 700, 3 PN 1000 L, Gardner Denver PZ 7,
Type of drilling equipment / workover equipment / cranes / engines / generators / others
Crown block 200 tons, traveling block 250 tons, swivel CH 125, 200, 320, rotary table 20 ½”, 27 ½”, diesel engine CAT 3408, CAT 3412, CAT 3512, Detroit 6V92 and 8V92, Perkins 1100, 1300, 2300.
Other technical skills
- Recording and tracking the performance of drilling and workover equipment;
- Planning, monitoring and supervising the maintenance program of drilling and workover equipment;
- Preparation requirements in spare parts, materials and lubricants necessary to maintenance activity;
- Collaboration with specialized companies in order to certify all the expertise and equipment.
- I prepare all reports for maintenance activity (monthly mechanical activity report, failure equipment reports, monthly mechanical evidence (working hours, oil and diesel consumption, preventive maintenance for diesel engine and lubrication chart)).