Total Years of Experience: 41 Years, 4 Months
August 2015
To Present
SENIOR SITE ENGINEER ROADS
at Parsons International Limited
Location :
Qatar
construction supervision of road works under PWA.
Road widths vary between 24m and 64m.
Road widths vary between 24m and 64m.
February 2014
To August 2015
TEAM LEADER
at UMER MUNSHI ASSOCIATES
Location :
Bangladesh
CONSTRUCTION SUPERVISION OF BRIDGE OVER RIVER SHITALAKHYA IN BANDAR UPZILA IN NARAYANGANJ, BANGLADESH.
September 2012
To July 2013
RESIDENT ENGINEER
at NESPAK
Location :
Saudi Arabia - Jizan
CONSTRUCTION OF 24 NO. ACCESS ROADS AND 24 NO. GABION DAMS IN JIZAN AREA OF SAUDI ARABI.
March 2012
To August 2012
PM
at NESPAK
Location :
Saudi Arabia - Mecca
CONSTRUCTION OF WTP, DI PIPELINE 49.2 KM LONG 600MM DIA METER AND UNDERGROUND DAM IN AL-LITH AREA IN MAKKAH REGION.
July 2010
To March 2012
Resident engineer
at NESPAK
Location :
Other
CONSTRUCTION SUPERVISION OF ROADS IN RIYADH REGION 102 KM IN LENGTH FOR THE MINISTRY (MOMRA) SAUDI ARABIA
DUTIES: QUALITY ASSURANCE, APPROVAL OF CONSTRUCTION MATERIAL, PREPARATION OF MONTHLY PROGRESS REPORTS, MONITORING PROGRESS, CHECKING AND PROCESSING CONTRACTOR;S IPCs ETC
DUTIES: QUALITY ASSURANCE, APPROVAL OF CONSTRUCTION MATERIAL, PREPARATION OF MONTHLY PROGRESS REPORTS, MONITORING PROGRESS, CHECKING AND PROCESSING CONTRACTOR;S IPCs ETC
June 2008
To May 2010
RESIDENT ENGINEER
at ITALCONSULT
Location :
Saudi Arabia - Jizan
CONSTRUCTION SUPERVISION OF JIZAN EXPRESSWAY 130KM LONG HAVING 29 BRIDGES AND 6 INTERCHANGES.
COST: 600MILLION SAUDI RIYAL
DUTIES: QUALITY ASSURANCE, APPROVAL OF CONSTRUCTION MATERIAL, PREPARATION OF MONTHLY PROGRESS REPORTS, MONITORING PROGRESS, CHECKING AND PROCESSING CONTRACTOR;S IPCs ETC
COST: 600MILLION SAUDI RIYAL
DUTIES: QUALITY ASSURANCE, APPROVAL OF CONSTRUCTION MATERIAL, PREPARATION OF MONTHLY PROGRESS REPORTS, MONITORING PROGRESS, CHECKING AND PROCESSING CONTRACTOR;S IPCs ETC
June 2008
To October 2009
resident engineer
at italconsult
Location :
Saudi Arabia
Project: Majmaa-Shaqra expressway 96 km long.
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
January 2008
To May 2008
snr expat contracts specialsit
at nespak
Location :
Bangladesh
Project : 4 -laning of Dhaka-Chittagong highway 189 km long
Duties: To convene pre-bid meeting, supervise the Tender process, evaluation of bids and recommendation to the client for selection of contractor.
Duties: To convene pre-bid meeting, supervise the Tender process, evaluation of bids and recommendation to the client for selection of contractor.
January 2007
To December 2007
resident engineer
at nespak
Location :
Pakistan - Rawalpindi
Project: Lai expressway 11.2 km long having 2 bridges.
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
May 2006
To December 2006
snr expat contract specialist
at nespak
Location :
Bangladesh
Project: 4-laning of Dhaka- Chittagong highway 189 km long
Duties: preparation of all tender documents to select a contractor for the project.
Duties: preparation of all tender documents to select a contractor for the project.
September 2004
To April 2006
Resident engineer
at nespak
Location :
Oman
Project: Mahout to Nizwa Thumrait road, 110 km long
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
July 2003
To August 2004
proncipal engineer (proposals)
at nespak
Location :
Pakistan - Lahore
duties: preparation of proposals (Technical as well as financial), LOI, EOI etc. for all domestic and international road sector projects.
January 2001
To May 2003
Resident Engineer
at nespak
Location :
Pakistan - Lahore
Project: " Punjab highway supervision project" 101 km
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
November 1998
To December 2000
ARE (Site based)
at nespak
Location :
Pakistan
Project: ADB assisted Farm to market roads, 102 km long
Duties: To assist RE to ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
Duties: To assist RE to ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
June 1998
To October 1998
Resident engineer
at nespak
Location :
Pakistan - Lahore
Project: Bridge over main railway track at Garhi shahu
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
January 1997
To May 1998
Resident engineer
at nespak
Location :
Pakistan - Karachi
Project: Fyzee Rahamin art gallery & auditorium
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
-it was 3-storey air conditioned building of 1600 persons capacity.
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
-it was 3-storey air conditioned building of 1600 persons capacity.
January 1996
To November 1996
Resident Engineer
at nespak
Location :
Pakistan
Project: demolition of old and construction of new dome of shahbaz qaladar.
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
January 1993
To December 1995
senior engineer
at nespak
Location :
Kazakhstan
Project: development of surjani town and north Karachi
duties:Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
Scope of work included 1000 flats/apartments, roads over 100km, water supply network and sewerage network.
duties:Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
Scope of work included 1000 flats/apartments, roads over 100km, water supply network and sewerage network.
January 1991
To December 1992
Resident engineer
at nespak
Location :
Pakistan - Islamabad
Project: Head quarter building of Pakistan medical and dental council Islamabad.
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
January 1989
To December 1990
senior engineer
at nespak
Location :
Pakistan - Karachi
Project: Suzuki plant port Qasim
duties: I was responsible for quality assurance of the assembly shop and paint shop, over water tank, under ground water tank, mosque, canteen and access & internal roads.
Roof of assembly shop and paint shop was of pre-cast planks on structural steel trussed.
duties: I was responsible for quality assurance of the assembly shop and paint shop, over water tank, under ground water tank, mosque, canteen and access & internal roads.
Roof of assembly shop and paint shop was of pre-cast planks on structural steel trussed.
January 1988
To December 1988
senior engineer
at nespak
Location :
Pakistan - Karachi
preparation of contract documents (volume 1, 2 and 3)
volume 1 contained: invitation to tenderer, general condition of contract, special conditions of contract
volume 2: Technical specifications
volume: BOQ
volume 1 contained: invitation to tenderer, general condition of contract, special conditions of contract
volume 2: Technical specifications
volume: BOQ
February 1987
To November 1987
senior engineer
at nespak
Location :
Pakistan - Karachi
Project: National stadium Karachi for world cup cricket 1987
Duties: quality assurance of RCC and structural steel works
The structural steel work included
structural steel columns, structural steel girders, structural steel trusses
also quality assurance of under ground tank and over tank, floor finishes, doors and windows, steel louvers etc.
Duties: quality assurance of RCC and structural steel works
The structural steel work included
structural steel columns, structural steel girders, structural steel trusses
also quality assurance of under ground tank and over tank, floor finishes, doors and windows, steel louvers etc.
July 1985
To December 1986
senior engineer
at nespak
Location :
Pakistan - Karachi
Project: terminal 3 Karachi airport- construction of road from star gate to the airport, car parks, taxiways and hard standing bays (air side)
duties: make sure that the work done by the contractor was as per specification and drawings,
duties: make sure that the work done by the contractor was as per specification and drawings,
December 1981
To June 1985
junior engineer (site)
at NESAPK
Location :
Pakistan - Karachi
construction supervision of main access road to port Qasim from national highway 11.00 km long.
duties: to ensure that the thickness and compaction of each layer of pavement was as per specifications/drawings.
also to ensure that temperature of asphalt at the time of laying was neither below nor above the specified values.
duties: to ensure that the thickness and compaction of each layer of pavement was as per specifications/drawings.
also to ensure that temperature of asphalt at the time of laying was neither below nor above the specified values.