Hamza Kalappatt PMP, Planning Manager

Hamza Kalappatt PMP

Planning Manager

Kerala State Electricity Board

Location
India
Education
Bachelor's degree, Civil Engineering
Experience
20 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 2 Months

Planning Manager at Kerala State Electricity Board
  • India - Kerala
  • My current job since May 2023

• Planning and Scheduling of various projects for Major Constructions and Rush Projects.
• Prepare the Contractual Baseline Schedule (CPM) & Organize thousands of activities with Resources and Cost Loading.
• Establish (WBS (Work Breakdown Structure) and Weight factoring.
• Prepare PMS (Progress Measurement System) for Engineering, Procurement and Constructions
• Prepare & Submit Weekly Reports & Monthly Reports, Monitor KPIs(Key Performance Indicators)
• Prepare S-Curves & Resource Histograms, Leveling & Track Resource Usage.
• Liaise with Client, Consultant & Sub-contractors. Follow up with the project correspondences
• Prepare the Material Tracking System, Monitor the Long Lead and Bulk Material Procurement
• Project Risk Management (PRM), Prepare Risk Register & Implement Risk Control Measures.
• Delay Analyzing and EOT Submission: Time Impact analysis and Window analysis.
• Analyze & monitor Critical & Noncritical delays, Excusable & Non excusable delays, Compensable & Non compensable delays, Concurrent & Non concurrent delays
• Budget Allocation, Analysis to Project Cash flow, Monitor earned Value, planned Value, schedule variances, cost variances and forecasts
• Update overall Progress of the Project, Weekly Progress meeting with Stakeholders, Follow up with Minutes of Meeting
• Critical Path Analyzing. Actual Vs Planned, Forecast to Completion. Conducts studies of problem areas to determine critically of schedule activities and Submit Look ahead schedules
• Generate various kinds of Reports, Dashboard, S-curves, Resource Profiles and Histograms, Monitor resources and generate report against resources.
• Preparing and updating detail-Engineering Deliverable Register.
• Prepare Narrative, Productivity report, Weekly Breakdown for Quantity & % Accomplished,
• Monitoring the Contractors Constructions & Communicate with the Construction teams on the schedule objectives and deviations to schedule and planned progress.
• Alarming to the Management Team for the Slippages and Prepare Recovery Plans.
• Review Contractors schedule submittals including resource requirements, construction methodology and commenting on technical and practical competence.
• Integrate the Construction Interfaces for Construction and Commissioning Activities.
• Experience in FIDIC Conditions of Contract, Technical write-ups, Maintain Project Backup


Project : Hydro Electric Projects & Solar PV project (32 MW) Kerala.
Govt. of Kerala aims to achieve a total installed solar capacity of 20 GW by 2030. KSEBL(Kerala State Electricity Board Limited) utilizes the maximum canal top and land availability at Olikkal & Poovaramthodu HEP for Solar PV projects, installed capacity 32MW, grid-connected photovoltaic solar spread over an area of 280 acres. EPC project with scope of works includes the Civil, Structural, MEP works: Power station, Power Channel 470m, Penstock 320m Forebay tank, Photovoltaic Panels, Solar Power System Inverters, Solar Power System Disconnects, System Power System Metering, Battery Charge Controller, Fire fighting works, CCTV System and Landscaping works.

lanning Manager at Arabtec Construction LLC.
  • United Arab Emirates - Abu Dhabi
  • December 2017 to April 2023

Project :Zayed National Museum, Saadiyat Island, Abu Dhabi, UAE
Client: Department of Culture and Tourism
Consultant: Louis Berger
(Project Value: 1.96 Billion AED)
Zayed National Museum is planned to be the centrepiece of the Saadiyat Island, Abu Dhabi
The museum has been designed by Foster + Partners with five solar thermal towers that will act as chimneys to draw cool air through the building.\[1\] The towers are shaped like falcon wings to commemorate Zayed's love of falconry. The project consists of construction and completion of Sheikh Zayed National Museum, including gallery displays as well as special exhibition spaces, education center, services areas, back of house and Time Line Garden.

Planning Manager at China Harbour Engineering Company Ltd
  • Saudi Arabia
  • August 2014 to May 2017

Project :Jizan Integrated Gasification Combined Cycle - JIGCC6, Jizan, Saudi Arabia
Client: Saudi Aramco
(EPC Contract, Project Value: 450 Million $)
Project involves Large Scale Excavation of 4.7 Million M3, Dredging 5.8 Million M3,
Construction and Commissioning of Desalination plant with reverse osmosis water
treatment system, Filling of 4.4 Million M3, Piling 4, 482 Nos., 400, 000 M3 Concrete
works for Inlet Canal, Inlet Pump Station, Intake Channel, In-plant Lagoon,
Discharge Channel, Storm Water Channel and Outfall Tank, 320, 000 M3 Stone
Works, 3M Dia. HDPE Outfall Pipelines 15.3Km Length.
Project :City Commercial Port and Desalination Plant, Jizan, Saudi Arabia
Client: Saudi Aramco (Project Value: 410 Million Saudi Riyals)
The large-scale construction projects on site, Scope of Works covers a
total area of 1.2 Million square meters.The project consists of Construction
and commissioning of Water purificationplant7500m3/d reverse osmosis (RO) desalination
plant system
Soil Improvement & Site Preparation works. Methods used for soil
improvements are Dynamic Compaction and Dynamic Replacement,
Marine works are Harbor & Channel Works which can provide a connection
to international trade and shipping. The facility which allows ships to load
and unload Cargo ships as well, including repair areas, shelter for ships,
4.2 Million Cubic meter soil dredging, Installation of
Revetment works 832 linear meters
2055 linear meters Mass concrete block retaining wall.
205 LM Sand Beach Constructions.

Senior Planning Engineer at Max Bogl Emirates BuildingContracting LLC
  • United Arab Emirates
  • November 2010 to August 2014

Project :Multi Functional Stadium, Zayd Sports City, Abdu Dhabi

Client: REEM INVESTMENTS
Engineer: IFS (Institute For Sports Facilities
This is a Multifunctional Stadium in Zayed Sports City with a seating capacity of 5068 along with VIP/Royal seating with Media facilities including Press conference room. The flexibility of the Stadium’s multi-purpose facility has paved the way for significant local and international events taking place at the venue. It is a Design & Built project with mandatory time constraint project to commission with 350 calendar days plus 90 days for Green Building Certification. The Building is Concrete Shell & Core with 3 Floor Surrounding the Main Arena and Steel Roof with Decking sheet and coverd with Aluminium Sandwitch Panel Cladding and fully Air conditioned.

Project :MW-OU-283-2010: Abu Dhabi Airbase Hangar Project

Client: U.A.E ARMED FORCES, H.Q OF MILITARY WORKS
Engineer: DORSCH GRUPPE, DC ABU DHABI

This is a design & Built project of C17 Aircraft Maintenance Hangar, Training Facility, Departure Air Group, Air Craft Parts Storage & Ground Support Equipment Facility. Scope of Works includes Earthworks, Precast & Cast-in Situ Concrete works, Structural & non-structural Steel Works, Cladding & Insulation Works, Doors, Windows & Architectural Finishing Works, Electrical Works, Fire Fighting & Fire Alarm System, Plumbing & Drainage Works, Water Supply System, Underground MEP Services, HVAC System, ELV System & BMS System.

Project :Mushrif DEWA Reservoir and pipelines-Phases 4, 5 & 6 (180MIG)

Client: DEWA (Dubai Electricity & Water Authority)

(Project Value: 619 Million AED)
This Project is the extension of DEWA water reservoirs to meet the growing demand of water in Dubai. The work comprises of Construction of three rectangular water reservoirs (342.7m x 173.4m) with 32 cells in each reservoirs, 6144 columns, 3021m Periphery wall, 1509m Dividing wall, 5034m Baffle wall, 4536 Beams, 20736 numbers roof panels, Reinforced cast-in situ & Pre-cast structure with 151 Connecting Chambers for the installation of 5705m Yard Piping of 1200mm Diameter. Scope of works also includes the Inlet/Outlet Pipeline Connection with the existing pipeline, Drainage Pipelines associated Earthworks, Roofing System, Ventilation System, Civil & MEP works, Operation Buildings, Security Fencing (2 km), CCTV monitoring System, Area Lighting, External Road works (2km) with storm Drainage channel, Interlock Pavements & Landscaping.

Planning and Project Controls Engineer at ADCC
  • Qatar
  • October 2007 to October 2010

Project :New Doha International Airport (NDIA), CP11 & CP26
Client: BECHTEL (Contract Price: 2.4 Billion Qatar Riyals)
Project covers 22 million sq. m. area east to the existing Doha airport which is 1/3 of
the city of Doha in size. NDIA is designed to annually accommodate 24 million
passengers, 1.4 million tones of cargo and over 360, 000 aircraft movements.
Projects consists of Air Cargo Handling System have the capacity to accommodate
over 1, 000 main deck ULDs and over 5, 000 individual consignments for processing
1.4 million tones of cargo per year, making it amongst the largest cargo terminals in
the world. Projects includes two Emiri Hangars Building for Air Craft Maintenance,
cargo agents building which provides enough space for private cargo agents; the
Landside

Planning Engineer at Saudi Binladin Group
  • Saudi Arabia
  • August 2003 to September 2007

Project :Expansion & Renovation of King Abdul Aziz International
Airport (KAIA)
Jeddah - Saudi Arabia (Project Value: 495 Million Saudi Riyals)
King Abdul Aziz International Airport (KAIA) is a massive development, with
capacity of 30 million passengers per year on an area of 687, 000 square
meters. The project involves engineering, supply, furnishing, installation,
rehabilitation, construction, testing and commissioning of the airfield facilities
and the related airport infrastructure facilities. Scope of works includes
Structural, Civil, Architectural & Electromechanical works. Expansion of North
And South terminal buildings which is considered the main gateway of
Pilgrims coming from all over the world for Hajj and Umra. Expansion of
Public lobby at Airside & Landside. New car parking will have area for 26, 000
cars. Installation of new pass port Counters and customs area. Renovation of
toilets blocks, utilities networks, Installation of baggage loops, weighing
Machines and checking s/m. Architectural works and Landscaping,
Renovation at arrival and departure area. Computer data system, Safety and
Fire alarm systems, Screening s/m, Sign boards and Information Display
System. Ventilation and Air conditioning Systems, and Public address system.
Project :Development of King Abdul Aziz Endowment Projects, Makkah -
KSA

Education

Bachelor's degree, Civil Engineering
  • at Govt. Engineering College, University of Calicu
  • December 2002

Primavera Project Management (P6): 18 Years

Specialties & Skills

Mobilization
Minutes
Narrative
Procurement
MICROSOFT WORKS
CUSTOMER RELATIONS
GATEWAY
COREL DRAW
ENGINEERING
FUNCTIONAL

Languages

English
Expert

Training and Certifications

PMP (Certificate)
Date Attended:
February 2022