Total Years of Experience: 20 Years, 3 Months
March 2020
To Present
Projects Director
at Amana Contracting And Steel Buildings
Location :
United Arab Emirates - Abu Dhabi
• Mafraq Square - Construction of Shopping Mall in Al Mafraq, Abu Dhabi for M/s.Tawasoul Investments.
Consultant: M/s KEO International Consultants.
Contract Value:234, 566, 582.00
• Al Futtaim Auto Park - Construction of Showrooms Building to Serve the Sales and Maintenance for Toyota, Lexus, Honda and CDR in Al Ain, Abu Dhabi.
Consultant: M/s Makan Consulting Engineers L.L.C.
Contract Value: AED60, 000, 000.00.
• Pureharvest High-tech Farm - Construction of Civil Works for a Climate Controlled High-Tech Farm in Al Ain, Abu Dhabi for M/s Pureharvest.
Contract Value: AED81, 000, 000.00
• Gloves Factory - Construction of Gloves Factory in Mussafah, Abu Dhabi for M/s Chemira Investments.
Contract Value: AED21, 000, 000.00
Consultant: M/s KEO International Consultants.
Contract Value:234, 566, 582.00
• Al Futtaim Auto Park - Construction of Showrooms Building to Serve the Sales and Maintenance for Toyota, Lexus, Honda and CDR in Al Ain, Abu Dhabi.
Consultant: M/s Makan Consulting Engineers L.L.C.
Contract Value: AED60, 000, 000.00.
• Pureharvest High-tech Farm - Construction of Civil Works for a Climate Controlled High-Tech Farm in Al Ain, Abu Dhabi for M/s Pureharvest.
Contract Value: AED81, 000, 000.00
• Gloves Factory - Construction of Gloves Factory in Mussafah, Abu Dhabi for M/s Chemira Investments.
Contract Value: AED21, 000, 000.00
April 2017
To July 2018
Sr. Project Manager
at Amana Contracting And Steel Buildings
Location :
United Arab Emirates - Dubai
Logistic and office Facility at Plot No. TP071605 at National industrial Park - Dubai, for M/s Majed AL Futtaim Sourcing and Distribution Center.
Consultant: M/s B&A Architectural Design.
Contract Value: AED238, 000, 000.00.
Consultant: M/s B&A Architectural Design.
Contract Value: AED238, 000, 000.00.
October 2014
To March 2017
Sr. Project Manager
at Amana Steel Buildings and Contracting
Location :
United Arab Emirates - Dubai
• Dry Port Upgradation Project in Ras Al Khour Industrial - Dubai, October 2014 till date.
The project consists of construction of the following:
1. Construction of 78 industrial warehouses consist of steel structure and precast wall panels.
2. Refurbishment of existing inspections sheds and 42 industrial warehouses.
3. Construction of a mosque.
4. G+4 Accommodation building.
5. Restaurant.
6. 6 Gatehouses.
7. 3 cafeterias.
8. Pump Room and 3 substations.
9. Infrastructure work (underground sewer network, HV cables, storm water network, potable water network, firefighting network, telecommunication network, street lighting and roads work(19, 000 SQM of roads)).
Project Value is 178000000.
The project consists of construction of the following:
1. Construction of 78 industrial warehouses consist of steel structure and precast wall panels.
2. Refurbishment of existing inspections sheds and 42 industrial warehouses.
3. Construction of a mosque.
4. G+4 Accommodation building.
5. Restaurant.
6. 6 Gatehouses.
7. 3 cafeterias.
8. Pump Room and 3 substations.
9. Infrastructure work (underground sewer network, HV cables, storm water network, potable water network, firefighting network, telecommunication network, street lighting and roads work(19, 000 SQM of roads)).
Project Value is 178000000.
April 2015
To April 2016
Sr. Project Manager
at Amana Steel Buildings and Contracting
Location :
United Arab Emirates - Abu Dhabi
EMAL’S Gates Access and Parking, Khalifa Industrial City - Abu Dhabi, April 2015 till date.
The project consists of construction of:
1. 10 meters height state of art operation gate and security checkpoint.
2. 10 meters height administration gate and security check point.
3. G+1 security building (1200 SQM).
4. 2 KM hot metal road.
5. 4 KM road work.
6. 18000 SQM car parking
Project Value is 42000000 AED
The project consists of construction of:
1. 10 meters height state of art operation gate and security checkpoint.
2. 10 meters height administration gate and security check point.
3. G+1 security building (1200 SQM).
4. 2 KM hot metal road.
5. 4 KM road work.
6. 18000 SQM car parking
Project Value is 42000000 AED
May 2014
To September 2014
Project Manager
at Amana Steel Buildings and Contracting
Location :
United Arab Emirates - Al Ain
Construction Of Hayatana National Dairy Plant in AL Ain City
A project of AED 105000000 Value for the construction of milk and Juice factory in ALAin City.
Project manager, to follow up daily activities, monitoring of project performance in terms of progress, budget and construction activities.
A project of AED 105000000 Value for the construction of milk and Juice factory in ALAin City.
Project manager, to follow up daily activities, monitoring of project performance in terms of progress, budget and construction activities.
September 2012
To May 2014
Projects Manager
at Amana Steel Buildings & Contracting
Location :
United Arab Emirates - Abu Dhabi
Emal Smelter Complex Phase 2 Construction
Project Managed:
Contract (CC 1420) Storm Water ponds Embankment
Contract (CB 6855) Carbon Area miscellaneous Concrete Work.
Contract (CG 7258) Cast house services Buildings.
Contract (CG 8440) Phase 2 Enabling Work.
Package RD 1101F (Pot delinging service buildings).
Package RD1101J (Backfilling For Delining Buildings Area).
Project Managed:
Contract (CC 1420) Storm Water ponds Embankment
Contract (CB 6855) Carbon Area miscellaneous Concrete Work.
Contract (CG 7258) Cast house services Buildings.
Contract (CG 8440) Phase 2 Enabling Work.
Package RD 1101F (Pot delinging service buildings).
Package RD1101J (Backfilling For Delining Buildings Area).
November 2011
To September 2012
Project Manager
at Amana Steel Building & Contracting
Location :
United Arab Emirates - Abu Dhabi
Project Manager, Emal Smelter Complex phase 2 Project
Project Managed for construction of Package CG-8840 Construction of 2 industrial warehouses, 2fire station garages, project management offices and laying of underground services (HDPE pipes, Fire fighting pipe line and HV cables), erection of steel bridges and construction of sewage lifting station.
Project Managed for construction of Package CG-8840 Construction of 2 industrial warehouses, 2fire station garages, project management offices and laying of underground services (HDPE pipes, Fire fighting pipe line and HV cables), erection of steel bridges and construction of sewage lifting station.
August 2010
To October 2011
Project Manager
at Amana Steel Building & Contracting
Location :
United Arab Emirates - Dubai
First Gulf Bank (2B+G+4 story) in Jebel Ali Free Zone / UAE- Dubai, August 2010 till date.
ensure on-schedule completion within cost and quality requirements in accordance with contractual obligations, responsible for the scope management, commercial performance of the project to meet project goals and objectives, , prepare monthly invoices, certify sub-contractors payments, monitoring subcontractors performance at site and assisting and advising procurement department in purchasing and finalizing contracts as per the project specifications and responsible for optimizing the allocated manpower material and equipments to meet budget.
ensure on-schedule completion within cost and quality requirements in accordance with contractual obligations, responsible for the scope management, commercial performance of the project to meet project goals and objectives, , prepare monthly invoices, certify sub-contractors payments, monitoring subcontractors performance at site and assisting and advising procurement department in purchasing and finalizing contracts as per the project specifications and responsible for optimizing the allocated manpower material and equipments to meet budget.
January 2010
To August 2010
Factory Manager
at Al Hamad Group of Comapies
Location :
United Arab Emirates - Dubai
Manager for Al Hamad rebar cut and bend factory.
Managing engineering, supply chain, logistics and production teams to ensure operating the factory in its maximum capacity and achieve goals and targets set by the group board of management and fulfil market requirements.
Managing engineering, supply chain, logistics and production teams to ensure operating the factory in its maximum capacity and achieve goals and targets set by the group board of management and fulfil market requirements.
September 2009
To January 2010
Construction Project Manager
at Al Hamad Contracting Company
Location :
United Arab Emirates - Dubai
Bay Central at Dubai Marina (3B+G+4P+41) & (3B+G+4P+52) residential towers.
Supervised and managed a group of engineers and constructions professional on daily basis to achieve the project requirements as per project programmes.
Supervised and managed a group of engineers and constructions professional on daily basis to achieve the project requirements as per project programmes.
July 2007
To September 2009
Project Manager
at Al Hamad Contracting Company
Location :
United Arab Emirates - Dubai
The Point Tower (3B+G+27 Story) Residential Tower in Dubai Marina / UAE Dubai, July 2007 till September 2009
ensure on-schedule completion within or below budget in accordance with contractual obligations, responsible for the scope development, management, commercial performance of the project to meet project goals and objectives, meet the client and consultant to discuss the project progress and take corrective actions when necessary, prepare monthly invoices, certify sub-contractors payments and materials procurement.
ensure on-schedule completion within or below budget in accordance with contractual obligations, responsible for the scope development, management, commercial performance of the project to meet project goals and objectives, meet the client and consultant to discuss the project progress and take corrective actions when necessary, prepare monthly invoices, certify sub-contractors payments and materials procurement.
December 2006
To July 2007
Construction Manager
at Al Hamad Contracting Company
Location :
United Arab Emirates - Dubai
23 Marina (4B+G+4P+89 story) residential tower in Dubai Marina / UAE Dubai December 2006 till July 2007.
responsible for all Structural activities, reports on discrepancies in original design, implement and adhere with the QA/QC policy and safety guidelines during the work activities, prepare weekly and monthly reports on structural progress, preparation and review of technical reports, prepare job plans, method statements and equipment plants and Monitor project progress towards programme objectives.
responsible for all Structural activities, reports on discrepancies in original design, implement and adhere with the QA/QC policy and safety guidelines during the work activities, prepare weekly and monthly reports on structural progress, preparation and review of technical reports, prepare job plans, method statements and equipment plants and Monitor project progress towards programme objectives.
April 2005
To December 2006
Project Engineer
at Al Hamad Contracting Company
Location :
United Arab Emirates - Dubai
Dreams Tower (2B+G+29 story) residential tower in Dubai Marina / UAE Dubai April 2005 till December 2006.
Project Engineer, monitor progress to meet schedule and budget requirements, ensure that applicable codes, standards, and procedures are followed and the quality is acceptable to the client, monitor productivity and technical proficiency for the site engineers and foremen, plan the activities to meet the programme goals, prepare/ review shop drawings for structural and finishing activities, monitor the sub-contractors work and end product and preparing progress reports.
Project Engineer, monitor progress to meet schedule and budget requirements, ensure that applicable codes, standards, and procedures are followed and the quality is acceptable to the client, monitor productivity and technical proficiency for the site engineers and foremen, plan the activities to meet the programme goals, prepare/ review shop drawings for structural and finishing activities, monitor the sub-contractors work and end product and preparing progress reports.
December 2003
To November 2004
Project Engineer
at Jumpstart International
Location :
Iraq - Baghdad
Site engineer in rehabilitation projects in several sites around Baghdad (Old Ministry of Defense, Ministry of Higher Education, Baghdad International Fair and Ibn El Bitar Hospital.
Share on Facebook
Share on Twitter
Share Via Email