Total des années d'expérience: 18 Années, 1 Mois
juillet 2006
A juin 2014
SR. FORMWORKS ENGINEER
à Future Scaffolding and Aluminum Trading LLC
Lieu :
Émirats Arabes Unis - Dubaï
July 2006 - Present SR. FORMWORKS ENGINEER,
Future Scaffolding and Aluminum Trading LLC
Plot No. 34009 Dubai Industrial City, UAE
• Handles the design of formworks and scaffoldings using
Aluminum & Steel materials for construction projects such as High Rise Bldgs., Villas, Hospitals, Schools, etc.
• Prepares Material Breakdowns, Design Calculations, Shop
Drawings, Method Statement, etc.
• Constantly provides technical support to site
supervisors/engineers.
• Performs related duties as assigned by the Technical
manager as need arises.
SOME PROJECTS HANDLED:
• Movenpick Hotel & Spa and Oceana Residences, Peremba
Construction SDN BHD, Palm Jumeirah, Dubai, UAE
• Dubai Metro Project Water Tank, Dubai Consortium, JAFZA Jebel
Ali Station, Dubai, UAE
• 2B+G+M+51 Typ. Hotel Tower, Acico Contracting LLC, Shiek
Zayed Road, Dubai, UAE
• 3B+G+25 Typ. Office Bldg.. Shinsung Contracting & Engineering
LLC, Dubai Silicon Oasis, UAE
• Arshia Marina Tower, Shinsung Contracting $ Engineering LLC,
Dubai Marina, UAE
• The U-Bora Tower, Bolim Construction Co, LLC, Business Bay,
Dubai, UAE
• GOSI Park High Rise Bldgs. Al Latifia Co., Ghurnata, Riyadh,
Kingdom of Saudi Arabia
1 year & 3 mos.
Future Scaffolding and Aluminum Trading LLC
Plot No. 34009 Dubai Industrial City, UAE
• Handles the design of formworks and scaffoldings using
Aluminum & Steel materials for construction projects such as High Rise Bldgs., Villas, Hospitals, Schools, etc.
• Prepares Material Breakdowns, Design Calculations, Shop
Drawings, Method Statement, etc.
• Constantly provides technical support to site
supervisors/engineers.
• Performs related duties as assigned by the Technical
manager as need arises.
SOME PROJECTS HANDLED:
• Movenpick Hotel & Spa and Oceana Residences, Peremba
Construction SDN BHD, Palm Jumeirah, Dubai, UAE
• Dubai Metro Project Water Tank, Dubai Consortium, JAFZA Jebel
Ali Station, Dubai, UAE
• 2B+G+M+51 Typ. Hotel Tower, Acico Contracting LLC, Shiek
Zayed Road, Dubai, UAE
• 3B+G+25 Typ. Office Bldg.. Shinsung Contracting & Engineering
LLC, Dubai Silicon Oasis, UAE
• Arshia Marina Tower, Shinsung Contracting $ Engineering LLC,
Dubai Marina, UAE
• The U-Bora Tower, Bolim Construction Co, LLC, Business Bay,
Dubai, UAE
• GOSI Park High Rise Bldgs. Al Latifia Co., Ghurnata, Riyadh,
Kingdom of Saudi Arabia
1 year & 3 mos.
mars 2005
A juin 2006
PROJECT ENGINEER
à Calivir Builders
Lieu :
Émirats Arabes Unis - Dubaï
March 2005 - June 2006 PROJECT ENGINEER
Calivir Builders
Quezon City, Philippines
5 years & 7 mos.
Calivir Builders
Quezon City, Philippines
5 years & 7 mos.
juillet 1999
A février 2005
INSTALLATION SUPERVISOR
à VICA Inc
July 1999 - February 2005 INSTALLATION SUPERVISOR
VICA Inc.
Quezon City, Philippines
3 years
VICA Inc.
Quezon City, Philippines
3 years
septembre 1995
A septembre 1998
INSTALLATION ENGINEER
à Tashi Building Products
Sept 1995 - Sept. 1998 INSTALLATION ENGINEER
Tashi Building Products
Quezon City, Philippines
Tashi Building Products
Quezon City, Philippines
Partager sur Facebook
Partager sur Twitter
Partager via Email