hesham abdallah, : Commissioning and start-up shift supervisor

hesham abdallah

: Commissioning and start-up shift supervisor

Techent International company/Pre-commissioning ,commissioning & start up1st. methanol Plant in Egyp

Location
Egypt - Cairo
Education
Bachelor's degree, since
Experience
19 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :19 years, 3 Months

: Commissioning and start-up shift supervisor at Techent International company/Pre-commissioning ,commissioning & start up1st. methanol Plant in Egyp
  • Egypt - Damietta
  • My current job since September 2009

Utilities section:
Water intake- Water treatment-Wast water plant.
Auxiliary Boilers 2x 160 Ton/hr Pensoty High pressure 120 Bar Boilers.
Cooling Tower 8 Fan cells.
Turbo generators 16 Mw Steam Turbine General Electric (two units).
Two Emergency diesel Generators 2Mw Cat.
Process Section:
Steam reformer- Auto thermal reformer- Waste Heat Boilers.
Syn gas machine steam turbine (Semines) and syn gas reactors.
Natural gas compressor -steam turbine (Semines).
Distillation unit.
Air Separation unit APCI.
ASU steam turbine (Man turbo).
Tanks Farm (two product tanks 75000 ton- two shift Tanks- crude tank.)
Loading Arms for ship & Truck loading.
V.Good experience in H.P pumps, compressors, and fans, electrical motors and steam turbines.

inspection Engineer – in heavy lifting and drilling equipment at oil & Gas Rigs at Aberdeen Egypt Services Company. An oil & Gas Services & Supply company
  • Egypt - Cairo
  • January 2005 to September 2009

Rig’s & Lifting Equipment inspector Work at Onshore & Offshore Rig’s” (EDC - Santafy -Price North American).

Certification and Inspection of all lifting and loose equipment i.e.(Sling, shackles, chain Hoists, snatch Block, Swivel)

Load tested for all Air winches, Blow out Preventer (B.O.P), Crane and Pad Eyes.

Examination and reporting on lifting Equipment and appliances, lifting operations and lifting equipment regulations (LOLER).

Drawing all the location of Pad eyes on the must and sub-structure.

Stamped and stencil Save Working Load “SWL” and ID number.

Using Sand Blast and Water Blast machine with High-pressure (from 36000 to 40000 PSI) to clean up internal and external walls of Tanks-pipes and equipment
Working at heights by Rope Access - safety Harness up to the top Rig floor

Education

Bachelor's degree, since
  • at Helwan
  • August 1995

Specialties & Skills

Languages

English
Expert