Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

Ismail Mohideen Shahul Hameed

Senior Design Engineer Electrical and I & C

M/s. Mott MacDonald Consultancy Ltd, Abudhabi

Location:
United Arab Emirates - Abu Dhabi
Education:
Bachelor's degree, Instrumentation and Control Engineering
Experience:
24 years, 9 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  24 Years, 9 Months   

June 2012 To Present

Senior Design Engineer Electrical and I & C

at M/s. Mott MacDonald Consultancy Ltd, Abudhabi
Location : United Arab Emirates - Abu Dhabi
Project Handled

1. STEP (Strategic Tunnel Enhancement Programme) Project ADSSC
2. Al Ghubrah 42 MIGD SWRO Plant ( Oman, Muscat)
3. Al Ghadeer STP


Responsibilites

─STEP Wastewater Pump Station PMC, Abu Dhabi - Electrical/ICA engineer responsible for review of the design & build contractor’s detailed EICA designs for this 30m3/s 100m deep 40m internal diameter wastewater pump station. This will be one of the world’s largest wastewater pump stations.



Design review, Submittal review and site supervision of ADSSC Pumping Station,

DCS system architecture review and comments with respect to process, interfacing with existing system to new system feasibility study and approvals, reviewing the method statement and preparing ITP (Field Quality plant) for installation, testing and commissioning of field instruments, project schedule reviewing and attending the site meeting with client and contractor, evaluations on monthly/weekly progress report further reporting to client
─ Selection of materials according the process fluid also issuing approval for material submittals, I/O list with relevant contract specifications, reviewing instruments location drawings/hookup drawings/loop drawings/Inter connection drawings, approval of vendor’s drawings as per project site requirements and technical specification requirements. Inspecting the field instruments installation/calibration and start up
─ Approval of dosing system calculations,
─ Attending the FAT (factory acceptance test) and SAT (site acceptance test) for SCADA/DCS also field instruments
─ Monitoring the site I&C system construction activities and issuing CAR (corrective action request) and NCR ( non conformance report), attending the CoC (construction of completion) and making LOP (list of punch), making report on initial operation test, reliability test run and net dependable capacity run, Implementing industrial safety, health and the environment.
June 2011 To May 2012

Senior EICA Engineer

at Cadagua S.A. Spain, Oman Branch
Location : Oman - Muscat
Project Handled

New Darsait STP- Muscat, Oman

Responsibilities included:

─ Project design review, execution, preparation of project plan, technical submittals, calculations, shop drawings, method statements and control philosophy
─ Preparing electrical / instrument data sheet and all relevant submittals for the project, developing the P&ID’s, FDS (functional design specification for automation) submitting instrument loop diagrams, wiring diagrams, instrument hook-up diagrams, instrument location layout, routing layout, termination diagram for instrumentation and control system
─ Coordination with system integrator for DCS control architecture and FDS and developing SLD from tender drawing further get approval from consultant, coordination work with utility provider for substation approval (SLD and SS layout)
─ Preparing MAS for electrical equipment and I&C equipment, MV and LV SLD preparation and coordination with utility provider for approvals
─ Electrical equipment load schedule, emergency load schedule, equipment data sheet, cable sizing calculation, cable schedule, electrical shop drawings such as equipment layout, cable route and earthing layouts.
August 2009 To May 2011

Design Review Engineer (EICA)

at M/s. Al Bawardy Consulting Engineers,Riyadh, K.S.A
Location : Saudi Arabia - Riyadh
Project Handled

JEDDAH RO DESALINATION PLANT - 3 (52.8 MIGD)/ SWCC, K.S.A

Responsibilities

 RO Design review of 52.8 MIGD RO Plant (Jeddah RO 3 plant/ SWCC Jeddah, K.S.A)
 P & ID review and comments according to process and safety aspects, issuing comment/approval to the contractor
 DCS FDS Architecture, DCS I/O list, DCS panel review and issuing comment sheet and approvals.
 Field instruments selection and approvals
 Review and comment the following, Instrument Hook up drawings, Instrument layout drawings, I & C Panel wiring drawings, Loop drawings, logic drawings, inter connection drawings, I&C Cable route drawings and I&C Earthings drawings.
 Review the plant Instrument list along DCS set point and co ordinate with process engineers
 Review and approvals for vendor package system submittals such as Electro chlorination, Sea water screening system, Chemical dosing system and fire fighting system
 Co ordinate with process engineer for control philosophy review and approval for RO and vendor package system
 Review and comment the shop inspection test plan and field inspection test plan also method statement.
 Attending the meeting with client and contractor

2. SWCC PILOT PLANT 96 Cu.M/day MSF Unit Al-Jubail R&D Center
 Attending pre commissioning activities with SWCC R&D engineers such as loop testing (open loop and closed loop tests), analyzer calibrations, Dosing system verifications.
 Attending SAT for SCADA system
March 2008 To July 2009

Resident Engineer ( I & C )

at M/s. Mott MacDonald Ltd, Abudhabi UAE
Location : United Arab Emirates - Abu Dhabi
Project Handled

IWPP SHUAIBAH EXPANSION RO PROJECT (33MIGD)/ ACWA POWER

Responsibilities

 RO RO Design review of 52.8 MIGD RO Plant (Jeddah RO 3 plant/ SWCC Jeddah, K.S.A)
 RO Design review and site supervision of 33 MIGD RO Plant (Shuaibah IWPP Expansion Project in Jeddah KSA)
 DCS system architecture review and comments with respect to process.
 Interfacing with existing system to new system feasibility study and approvals
 Reviewing the Method statement & Preparing ITP (Field Quality plant) for installation, testing & commissioning of field instruments
 Project schedule reviewing and attending the site meeting with client & contractor
 Evaluations on Monthly/weekly progress report and reporting to client.
 P&ID development with PFD according to site condition.
 Selection of materials according the process fluid also issuing approval for material submittals, I/O list with relevant contract spec.
 Reviewing Instruments location drawings/Hookup drawings/loop drawings/Inter connection drawings
 Approval of vendor’s drawings as per project site requirements & technical specification requirements.
 Inspecting the field instruments installation/calibration and startup
 Approval of dosing system calculations
 Attending the FAT (Factory acceptance test) & SAT (Site acceptance test) for SCADA/DCS also field instruments
 Monitoring the site I & C system construction activities and issuing CAR (Corrective action request) and NCR ( Non conformance report)
 Attending the CoC (Construction of Completion) and making LOP (List of Punch)
 Making report on Initial operation test, Reliability test run and Net dependable capacity run,
 Implementing industrial safety, health and the environment
September 2006 To March 2008

Electrical and I & C Engineer

at M/s Power Flow Engineering LLC, Abudhabi.
Location : United Arab Emirates - Abu Dhabi
Project Handled
1. 5 MLD SWRO Plant at Plam Jumeirah / PALM WATER
2. 2x32 MLD SWRO Plant at Plam Jumeriah / PALM WATER
Responsibilities
Project design review, execution, preparation of project plan, technical submittals, calculations, shop drawings, method statements, control philosophy
Preparing instrument data sheet and all relevant submittals for the project
Developing and reviewing of P&ID’s, FDS (Functional design specification for Automation) submitting Instrument loop diagrams, wiring diagrams, logic diagrams, Instrument hook-up diagrams, Instrument location layout, Routing layout, termination diagram for instrumentation & control system.
Installation of field Instruments as per the Installation procedure and primary and secondary cable laying and routing, junction boxes, control panel wiring and termination.
Familiar with all water analyzers /calibrations, control valves with positioners,
SCADA/DCS configuration/network testing along with automation dept (Siemens WinCC, EPKS Honey well, GE Cimplicity and Citech Scada)
Involved in pre commissioning and commissioning / Startup activities, such as loop check, valve test and SCADA/DCS sequence tests.
Installation of HV & LV switch gear with all relevant testing as Primary injection, secondary injection, di electric tests, transfer ratio test, vector diagram
 HP pump monitoring system (Temp, vibration) also VFD interfacing with existing control system
 Preparing IE for all field instruments and testing of IE segregated to PE
 Testing of Fire alarm system PA and CCTV systems
 Client and vendor interaction, progress report preparation.
Review monthly accomplishment reports and resolve problems encountered during project execution, recommend remedial action as field information request for implementation of design changes.
 Supporting to CMMS software development
 Also involved in various tender bidding and design and developments of several projects
August 2001 To September 2006

Electrical and I & C Engineer

at M/s. Weir Engineering Services Company (WESCO)
Location : United Arab Emirates - Abu Dhabi
Projects Handled

1. G1577 Replacement of Gas Chlorination system BY Sodium Hypo Chlorite in Various pumping station in Abudhabi./(ADWEA)
(Transco PS Lulu Island, Unit III, IV, V & VI and ADDC PS Sea palace, Khalifa palace, Mina, Ghayathi and Liwa)

2. ADSS 190/7 Modification of PS 2/1 ( M & E Works)/ SPC

3. ME-OU-031 AL Dhafra 5M Gallon Strategic Water reservoir & Pumping Station Al Ain. U.A.E/ Directorate of Military works

4. Mafraq Waste Water Treatment Works /SPC

Responsibilities
*Project design review, execution, preparation of project plan, technical submittals, calculations, shop drawings, method statements, control philosophy
*Preparing instrument data sheet and all relevant submittals for the project
*Developing and reviewing of P&ID’s, FDS (Functional design specification for Automation) submitting Instrument loop diagrams, wiring diagrams, logic diagrams, Instrument hook-up diagrams, Instrument location layout, Routing layout, termination diagram for instrumentation & control system.
*Installation of field Instruments as per the Installation procedure and primary and secondary cable laying and routing, junction boxes, control panel wiring and termination.
* Familiar with all water analyzers /calibrations, control valves with positioners,
*SCADA/DCS configuration/network testing along with automation dept (Siemens WinCC, EPKS Honey well, GE Cimplicity and Citech Scada)
*Involved in pre commissioning and commissioning / Startup activities, such as loop check, valve test and SCADA/DCS sequence tests.
*Installation of HV & LV switch gear with all relevant testing as Primary injection, secondary injection, di electric tests, transfer ratio test, vector diagram
*Experience in Onsite sodium hypo chlorite generation and dosing system
*Involved in protection relay setting
*HP pump monitoring system (Temp, vibration) also VFD interfacing with existing control system
May 1999 To June 2001

Maintenance Engineer

at Saptarishi Agro Industries P Ltd
Location : India - Chennai
Responsibilities

• Periodical & Preventive maintenance for plant field instruments & switch gears
• Calibration of all kind of field instrument
• Maintenance exp in LV panel with VFD, soft starter, and also ATS (Auto transfer sytem)
• All kind pumps maintenace (Vertical, Horizonatl pumps

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
May 1999

Bachelor's degree, Instrumentation and Control Engineering

at Madras University, Chennai, India
Location : India - Chennai
Grade: 61.5 out of 100
April 1996

Diploma, Diploama Electrical and Electronics Engineer

at Govt of India, Tamil Nadu, Director of Technical Education
Location : India - Chennai

Specialties & Skills

Waste Water Treatment

Instrumentation

Design, and design review for water and waste water treatment plant

Electrical Engineering

Reverse Osmosis

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

English

Expert

Arabic

Intermediate

Tamil

Expert

Memberships

Are you a member of any organization or professional club?
Your professional memberships provide an informative signal about your career aspirations, so add them!
Organization : Institution of Engineer India (IEI)
Membership/Role : Chartered Engineer
Member since : April 2012