Civil Structural Engineer at China National Petroleum Corporation
  • United Arab Emirates - Dubai
  • December 2013 to November 2014

Job Responsibility: Includes inter-discipline coordination, preparation of bill of quantities. Compilation of submittal document i-e engineering calculations, detail drawings and material take off during engineering phase. Providing technical support, preparing material requisition, coordination with construction contractor, vendors and client during construction phase.
Project Worked :
 GARRAF Full Field Development, PETRONAS
Scope of Work: Includes Well cluster layout, site development, earthwork, grading, Well cellar, rig pads, concrete trenches, platforms, security guard room, watch towers, foundations for PE Substation & SIH, equipment foundations & shelters, roads, Tee wall, plant security fencing etc.

Civil Structural Engineer at Worley Parsons
  • Bahrain - Manama
  • November 2012 to October 2013

Job Responsibility: Includes inter-discipline coordination, preparation of tender documents such as scope of work, method statements, bill of quantities. Compilation of submittal document i-e engineering calculations, detail drawings and material take off during engineering phase. Coordination with construction contractor and vendors for ongoing construction phase.
Project Worked :
 Ongoing Projects, Plant Engineering Department, BAPCO Refinery
Scope of Work: Includes engineering support for layout, site development, earthwork, grading, pipe sleeper, pipe support, pipe rack, cable tray support, steel bridge, thrust block, access/ crossover platform, culvert, tank foundation, bund wall, dyke wall, retaining wall, shear wall, duct bank, concrete trench, underground composite, equipments foundation, equipments shed, paving, road, foot path, canal, ditch, drainage, sewer, control building, substation etc.

Civil Structural Engineer at MOAK Engineering Consultancy
  • Saudi Arabia - Dammam
  • October 2010 to September 2012

Job Responsibility: Includes inter-discipline coordination, preparation of tender documents such as scope of work, method statements, bill of quantities. Compilation of submittal document i-e engineering calculations, detail drawings and material take off during engineering phase. Providing onsite technical support, coordination with contractor, vendors and client.
Project Worked :
 Replace Auxiliary Control System, Yanbu Refinery, ARAMCO
Scope of Work : Includes geotechnical investigation survey, process interface building, satellite instrument house, HVAC pad foundation, fresh air intake stack structure, pipe sleeper, pipe support, cable tray support, access platform, crossover platform, cable trench, duct bank, access road, switch rack foundation, junction box foundation etc.
 Coalescer & Chlorination Units Up gradation, Ibn Sina, SABIC
Scope of Work : Includes concrete pad foundation, pipe support, cable tray support, access platform, cage ladder, sun shed, control room etc.

Civil Structural Engineer at URS Corporation
  • Qatar - Doha
  • May 2007 to July 2010

Job Responsibility: Includes inter-discipline coordination, preparation of bill of quantities. Compilation of submittal document i-e engineering calculations, detail drawings and material take off during engineering phase. Providing onsite technical support, preparing material requisition, coordination with construction contractor, vendors and client during construction phase.
Project Worked :
 Common Condensate Single Point Mooring Project (CCSPM), Qatar Gas
Scope of Work: Includes pipe sleeper, pipe support, pipe bridge, thrust block, road crossing thro micro tunneling, pig launcher station, concrete paving, security fence etc.

 Common Sulphur Project (CSP), Qatar Gas
Scope of Work: Includes geotechnical investigation survey, topographical survey, tank foundation, dyke wall, pump foundation, metering skid foundation, pipe sleeper, pipe support, pipe bridge, expansion loops, concrete culvert, duct bank, cable trench etc.

 DEL Tie-in to the CSP, Dolphin Energy Limited
Scope of Work: Includes geotechnical investigation survey, topographical survey, tank foundation, dyke wall, pump foundation, metering skid foundation, supplementary switch rack foundation, pipe sleeper, pipe support, pipe bridge, expansion loops, concrete culvert, duct bank, cable trench, concrete paving, security fence etc.

Civil Structural Engineer at S.A. Kentz
  • Saudi Arabia - Khobar
  • April 2005 to March 2007

Job Responsibility: Includes inter-discipline coordination, preparation of engineering calculations, detail drawings and material take off during engineering phase. Providing onsite technical support, preparing material requisition, coordination with construction contractor, vendors and client during construction.
Project Worked :
 Plant Extension Phase, SASREF
Scope of Work: Includes fresh feed coalescer pier with foundation, access platform, cage ladder, pipe support, pipe sleeper etc.

 IIIrd Expansion, SHARQ
Scope of Work: Includes pipe sleeper, pipe support, cable tray support, crossover platform, junction box foundation etc.

 Saudi International Petrochemical Company Expansion, SIPCHEM
Scope of Work: Includes geotechnical investigation survey, topographical survey, earthwork grading, road network, storm water ditches etc.

 Rehabilitation Job, Gulf Farabi Petrochemical Co. Ltd.
Scope of Work: Includes earthen bund wall replacement with concrete dyke wall, inside dyke wall concrete paving, tank foundation strengthening, junction box foundation, pipe support, cable support etc.

 Upgradation at Advanced Petrochemical Company, APPC
Scope of Work: Includes knockout drum foundation, access platform, pipe sleeper, pipe support, concrete paving for access etc.

Assistant Structural Engineer at Petro Infrastructure (pi) Consult
  • Saudi Arabia - Khobar
  • July 2004 to January 2005

Job Responsibility: Includes inter-discipline coordination, preparation of engineering calculations, detail drawings and material take off during engineering phase.
Project Worked :
 Extension Phases for Jizan and Najran oil refineries, ARAMCO
Scope of Work: Includes pipe sleeper, pipe support, cable tray support, crossover platform, street light pole foundation, junction box foundation etc.

 13.8KV Substations at Shuwaiba & Anik, SAUDI NATIONAL GRID
Scope of Work: Includes transformer foundation with oil collection pits, fire wall, concrete cable trench, duct bank etc.

Civil Structural Engineer at Design Group, Mumbai (India)
  • India - Mumbai
  • July 2001 to June 2004

Job Responsibility: Includes inter-discipline coordination, preparation of submittal documents for approval & construction such as engineering calculations, detail drawings, bill of quantities and material take off for concrete and steel structures. Providing technical support to construction team. Performing regular site visits.
Project Worked :
 Government agriculture college, Mumbai
Scope of Work: Includes five (5) storey college building with raft foundation, architectural landscaping, elevated water tank, three storey hostel building etc.

 Film city expansion project, Bollywood film city, Mumbai
Scope of Work: Includes seven (7) studios building, rest house, office buildings etc.

 University development project, Nanded
Scope of Work: Includes university building, staff quarter, student hostel building etc.

Education

Bachelor's degree, Civil Engineering
  • at Mumbai University
  • July 1999
Diploma, Civil Engineering
  • at Board of Technical Education
  • August 1996

Specialties & Skills

Microsoft Office
MathCAD
AutoCAD
MS Office
STAAD Pro
Auto CAD
Microstation

Languages

English
Intermediate
Hindi
Intermediate
Urdu
Expert
Marathi
Intermediate
Arabic
Beginner

Training and Certifications

Yes (Certificate)
Date Attended:
January 2000
Valid Until:
April 2012