JASHVANTKUMAR MAHENDRAKUMAR PATEL, SENIOR QA/QC ENGINEER

JASHVANTKUMAR MAHENDRAKUMAR PATEL

SENIOR QA/QC ENGINEER

AL-HABTOOR SPECON LLC (HLG GROUP)

Location
Qatar - Doha
Education
Bachelor's degree, BACHELOR IN MECHANICAL ENGINEER
Experience
22 years, 3 months

Share My Profile

Block User


Work Experience

Total years of experience :22 years, 3 months

SENIOR QA/QC ENGINEER at AL-HABTOOR SPECON LLC (HLG GROUP)
  • Qatar - Doha
  • My current job since September 2006

Sept. 2006 Onwards Senior QA/QC Engineer (MEP) \n \nHabtoor-Leighton-Specon LLC, \n(An ISO 9001 : 2008, 14001, OHSAS 18001 Certified MEP \nconstruction Company) \nMEP Division of Habtoor-Leighton Group (HLG), \nDubai, UAE based Construction giant. \n \nProjects Hand over : (A) Al Habtoor Business Tower, Dubai Marina, Dubai - UAE. \n (B) Residential Buildings, Al Mamzar and Al Nahda, Dubai - UAE. \n \nProjects Under handover : Doha City Center Expansion Project, Phase-IIIA+B, Doha, Qatar. \n (Five star hotels Project, Shangrila, Rotana, Merweb in the heart of Doha, Qatar) \n \n Preparation of Method of statements, ITP (Inspection and test plan), MEP services checklist and \ndistribution to site execution team for internal checks prior to inspection with TPI. \n Carry out Material inspections, Site Mechanical work inspection (i.e HVAC, Fire fighting, Plumbing \ndrainage works, Utility Plant rooms.) for installation, testing works and final fixes with Third party \ninspectors and consultants. \n Plans & coordinates QA/QC activities for all MEP services and making certain of quality control of \nthe work in accordance to contract specifications. \n Reviewing of shop drawings and method statements for the services prior to implement at site. \n Carry out project audits in accordance with ISO 9001:2008 applicable to project procedures & \nstandards within the department and inter departments. \n Monitoring and closure of rejected inspections, Close out of FORs, NCRs issued from consultant. \n Providing training to QC - inspectors within department for quality management. \n Carry out pre-commissioning, testing and commissioning of MEP systems and inspections with \nconsultants prior to handover. \n Identifying process improvements and preparing recommendations for project development & \nimplementation, Preparing statistics for management reviews. \n Issuance of internal NCRs/ FORs to site team for non-standard / non-confirmative works. \n Maintaining quality records for the project from Project initiation phase to project close out phase. \n Safe keeping of Inspections records, operation and maintenance manuals for equipments as per \nquality records procedure. \n Attending weekly coordination meeting with site execution team, senior management, main \ncontractor and consultant.

MECHANICAL ENGINEER - PLANNING at JHAGADIA COPPER LIMITED , JHAGADIA , BHARUCH, GUJARAT, INDIA
  • India
  • October 2005 to August 2006

(1) Entire plant equipment Maintenance Spare planning.
Make P.M Schedule, Indenting work.
(2) ERP based CMMS (Computerized Maintenance Management System) Development for Entire plant equipments.
(3) In-house & outside Inspection work.
(4) Project planning & Documentation work of Oxygen plant & Cost calculation work.
(5) Maintain History cards for each & every equipments & Preparation of Spare drawings & Checking.

PROJECT ENGINEER at MAN INDUSTRIES (INDIA) LIMITED, ANJAR,GUJARAT
  • India
  • July 2004 to October 2005

I was working as a “Engineer(Projects)” in Project Dept. at its Anjar Project site. The Company is a leading SAW Pipe, Spiral Pipe, PE Coating, Aluminum Extrusion Mfg. Company with investment of Rs.300 Crores.
L-SAW Plant :

First 2 Months I have worked in “Utility Dept.” Then I get the Opportunity to work in “Project & Design Dept.”

(1) Erection of
Cooling Tower (Induced Draft), 100 m3/hr.
Air- Compressor (Screwed Type) 1000 CFM, Make: Atlas-Copco
(2) Air & Water Pipe line Project inside SAW Plant.
(3) Pipe line Project Layout from Narmada pipeline to Plant
(4) Layout work of Air and Water Pipelines
(5) Selection of Pipe Sizes & Cost Calculation.
(6) Pipe line Fabrication Work Planning (3.5 Km -In-house Project)
(7) Technical Documentation of Utility Project,

Spiral Pipe Project:

1). Completely Involved in Offline & Online Welding Technology Spiral Plant Project Work from Base to Start of Production.
2). In-house Fabrication of Mill Components.
3). Technical Documentation of Complete Spiral Project.
4). Erection & Commissioning of Flux Recovery System and I.D & O.D Welding System.
5). Design of Ejector, Receiver.
6). Selection and Procurement of Gear Box, Drive shaft, Hydraulic Cylinder, Geared Motors, Couplings, etc.
7). Find-out (From Internet) the suppliers for needed Items/Parts/Machine manufacturer. Also communication and follow with them.
7). Drawing Preparation/Drafting Work on Auto-CAD of Various Parts.
8). Material Requirement & Plate Layout for Effective Utilization of Material.
9). Site Machine Measurement and making Layout of Plant.
10). Erection of Mill Components.
11).Design of Pipe Rotator, I.D and O.D welding attachments by Pro/Engineer (With 3-D Modeling).

MECHANICAL ENGINEER - PLANNING at HINDUSTAN GAS & INDUSTRIES LIMITED, HALOL,GUJARAT
  • India
  • October 2003 to July 2004

I have worked as a “Mechanical Engineer (Planning)” in A.V. Birla Group Company. The Company, Hindustan Gas & Ind. Ltd. Is a leading insulator cap, Automobile casting manufacturing company producing 1000 MT casting/steel and 500 MT Steel Ingot per month. It is a Continuous Process Plant Present Job description cover Overall Plant Engineering and Maintenance Responsibility with project, & modification activities.

(1) Maintenance & spare planning work of Entire plant.
(2) Project work Responsibilty of Galvenizing Plant.
(3) Erection & commissioning work for Galvanizing plant.
(4) Indenting work for Maintenance & spares.
(5) Maintaining Data base & records of History cards for Each & every Equipments.
(6) Project work LPG bottling plant for LPG based Galvanizing plant.

ENGINEER - DESIGN at ELECON ENGINEERING COMPANY LIMITED , V.V.NAGAR
  • India
  • July 2002 to September 2003

I have worked with “Elecon Engg. Co.Ltd. as a “GRADUATE MECHANCAL ENGINEER - DESIGN " in Idler & Pulley (Conveyor Section) Div. Elecon Engineering is located in Vallabh Vidyanagar, India. From elevators and conveyors to material handling plants and gears for over 5 decades. Elecon has supplied hi-tech Material Handling Equipment to core industrial sectors such as steel, fertilizer, cement, coal, mining, power generation and port mechanization in India as well as abroad.

(1) Project Planning & Documentation work.
(2) Design of Idlers & pulleys.
(3) Indenting Work of Equipment Part,
(4) B.O.M and PR on ORACLE system.
(5) Selection of Bearing Units.
(6) Have developed the database of Standard Equipment parts for the company.

Education

Bachelor's degree, BACHELOR IN MECHANICAL ENGINEER
  • at SARDAR VALLABHBHAI PATEL INSTITUTE OF TECHNOLOGY, VASAD, (GUJARAT UNIVERSITY - AHMEDABAD)
  • June 2002

GPA : 6.97 AWARDS : HIGHEST MARKES SCORED IN THERMAL ENGINEERING AND CAD/CAM. SCHORLARSHIPS : ANNNUAL SCHOLARSHIPS FOR ACHIEVING THE 3RD RANK IN THE COLLEGE. INTERNSHIP : SUCCESSFULLY COMPLETED THE ENGINEERING SOFTWARE'S COURSE IN "PRO/ENGINNER', PROGRAMMING IN C & C++, AUTOCAD- 2002 (UPDATING OF 2007 VERSION ALSO). PRIMAVERA PROJECT PLANNING COURSE FROM EMIRATES EDUCATION CENTER, DUBAI, U.A.E.

Specialties & Skills

Inspection
Commissioning
Preparation
PLANNING ENGINEER (PRIMAVERA)
PRO/ENGINEER
PROJECT MANAGEMENT

Languages

Hindi
Expert
English
Intermediate
Gujarati
Expert