  • أشغل هذه الوظيفة منذ يناير 2014

 Managing the industrial refrigeration projects in GCC and MENA area.
 Asses potential risks during pre-bid process, provide reliable industrial refrigeration & elec. automation, as well as material & labor, cost information to sales team
 Prepared scope of work documents for subcontractor qualification, evaluation & selection, negotiated terms and rates, and certified bills.
 Initiate and actively follow up the project execution schedule.
 Managed the drawing, planning, and material submittal and procurement processes.
 Trigger & follow up the procurement of equipment with regard to budget.
 Improved the project margin & EBIT by using innovative automation & control concept.
 Discussed all technical issues with Contractor, Consultant, and Client and made action plan to address it.
 Conducted project kickoff meetings with customers.
 Proactively conducted risk management & response plan.
 Resolved issues and disputes where the main contractor or subcon. Impact the project execution and do necessary escalation process with manufacturing teams.
 Lead site activities, as well as delivery teams and Industrial refrigeration subcontractors.
 Audited site installation and provide solution for coordination & installation related issues.
 Conduct project review & Risk management meeting with installation subcontractors and steer corrective actions & recovery plans. Escalate issues as required.
 Monitored & control the cost of resources spent on the project with respect to the budget.
 Conducted regular site visits and meeting with clients to make sure that client’s expectations are met.
 Prepared monthly reports for the management that include Revenue, invoicing & collection, progress of works vs. planned, material procurement, and submittal (material & drawings approval status).
 Applied & ensured compliance with company’s HSE practices, policies and procedures.
 Prepared change orders for supplier and subcontractors.
 Supporting sales representative & meeting the client to articulate the business needs & expectations.
 Prepare commission plan and communicate to clients.
 Responsible for project handing over.
 Major Clients Portfolio
 Coca Cola, Qatar & Pakistan
 Mondelez Chiller Plant, Egypt & Bahrain
 Nestle, Egypt & Pakistan.

Sr. Electrical & Automation Project Engineer في Johnson Controls Inc
  • الإمارات العربية المتحدة - دبي
  • يناير 2012 إلى ديسمبر 2013

• Responsible for the design, configuration, and operation of Industrial refrigeration to meet projects requirements.
• Develop the PLC, HMI & SCADA program for the projects.
• Design & select instrumentations and field analyzers; analog, discrete, and electronic.
• Power distribution, switching, grounding, usage of variable speed drives and motors.
• Mentor and tutor instrument technicians and electricians with troubleshooting approaches, new installations, drawings & specifications.
• Apply company’s HSE practices, policies and procedures, conduct risk management plan.
• Assist sales representative & meet with clients to articulate the business needs & expectations.
• Prepare commission plan and communicate to clients.
• Trigger & follow up the procurement of equipment with regard to budget.
• Initiate and actively follow up the project execution schedule & hand over.
• Monitor & control the cost of resources spent on the project with respect to the budget.
• Qualify, evaluate, & select subcontractor, negotiate terms and rates, instigate purchase orders and certify bills.

Electrical Project Engineer في Drake & Scull PJSC
  • الإمارات العربية المتحدة - دبي
  • مايو 2008 إلى ديسمبر 2011

We are doing a 5 star hotel lagoon & residential buildings in palm jumeria of total 23 MW

*) Leading a group of 6 engineers, 10 foreman & 200 artisans

*) Revise the shop DWG and prepare the load schedule to submit to the authorities

*) Material tak off and follow with suppliers

*) A complete &detailed follow up with subcontractors.

*) Follow up with the consultant and the client for resolving technical issues

*) Coordinate with F/F, HVAC & Plubming works

*) Follow up the site progress & preparing reports

Electrical Engineer في Orascom Construction Industries
  • الإمارات العربية المتحدة
  • نوفمبر 2006 إلى يناير 2008

• Installation of indoor substations including (Transformers-MV cell-MCC-PLC-UPS-Battery charger-frequency drive), all types of instrumentation
• Also following the laying, termination and testing of (MV-Power-Control-Communication) cables and checking the PLC signal with CCR.
• Install 132/11 KV Grid station for power supplying the complete plant with total load 45 MW
(AREVA Brand).
• Install the street lighting.
• Prepare reports on the progress of the work on site.
• Attend QC meeting with the client

Electrical Engineer في Dhabi Contracting
  • الإمارات العربية المتحدة
  • أكتوبر 2004 إلى يونيو 2006

• In charge of all sites electrical works of 24 buildings (commercial/residential).
• Coordinate between Electrical, Plumbing and A/C work.
• Follow with the Supplier.
• Prepare the shop drawing and load schedule for the project.
• Prepare reports on the progress of the work on site.
• Prepare Material submittals and Drawings submittals.
• Liaise with quantity surveyor for the bill and contractor payment.

الخلفية التعليمية

ماجستير, Construction Project Managment
  • في Heriot Watt University
  • نوفمبر 2013
بكالوريوس, Electrical Machines & Power distribution Systems
  • في Helwan univ.
  • مايو 2003

Specialties & Skills

Refrigeration
Project Management
ms-office,autocad 2000
Communication
Customer interface
Presentation

اللغات

الانجليزية
متمرّس
العربية
متمرّس

العضويات

PMI
  • member
  • August 2010