Work Experience

Total years of experience :18 years, 9 months

Resident Engineer- Civil at Ozen Levant Power Engineering Consultancy
  • United Arab Emirates - Al Ain
  • December 2014 to December 2016

Contract: A 3746, Reinforcement of 33/ 11 KV Network at different areas of Al Ain
Position: Resident Engineer
Client: Al Ain Distribution Company (AADC)
Contractor: Lindenberg Emirates LLC
Scope of Work:
•Construction of 33/ 11 KV Package Unit substations and associated cable works for three projects (A 11180, A 11182 & A 11184) under the contract A 3746, at different areas of Al Ain.
Job Responsibilities:
•Coordination and Management of all construction activities.
•Liaise with Client and coordinate with other stakeholders.
•Review and recommend for approval of Contractors’ shop drawing, material submittals
Method Statements, ITP etc and confirms conformance to the project specifications.
•Review and approve contractor’s Inspection Request (IR) and Material Inspection Requests (MIR)
•Review and recommend for approval for contractor’s Joint Measurement Sheet (JMS), RCDR and
Monthly payment etc.
•Review of Contractor’s weekly and monthly progress report and notifying them in writing
for any delays with respect to Project schedules and construction schedules.
•Review of Contractor’s weekly and Monthly HSE report and monitoring site safety works.
•Supervising and coordinating with all site supervision staff in all disciplines.
•Monitoring the quality control at site and issuing Site Memo’s and Non conformance Report (NCR)
to the contractor in case if the executed works found not complying with approved design/ specifications.
•Assist PRE in project management activities.
•Attend weekly and Monthly progress meeting

Site Manager at M/s. Hilalco
  • United Arab Emirates - Abu Dhabi
  • July 2014 to November 2014

Projects Worked on:
Project Name: Construction of Internal Roads at various locations in Al Ain
Duration: July 2014 - November 2014
Client: AAM, AADC & ADSSC
Scope of Work:
•Construction of different types of underground services such as Storm water network, Sewerage network, Potable water network, laying of all HV/LV cables and internal roads at 3 different locations in Al Ain.

Key Responsibilities:
• Leading the construction team by taking care of all important project deliverables while managing subcontractors, vendors and other stakeholders involved.
• Overseeing and maintaining coordination with the planning and contract departments to ensure timely procurement of important resources as per each site’s individual construction and design needs.
• Reviewing contractual documents while coordinating with technical department for clarifications and strictly adhering to drafting, Quality Assurance and Quality Control guidelines.
• Assisting in consultancy, client inspections and approvals while effectively managing client-company relationship for improving future business prospects.
• Preparing and monitoring monthly schedules for internal revenue projections while taking any corrective actions to ensure the projects remain on course.
• Developing cost estimates, planning resource, drafting Gantt charts to prepare pre-sales presentations to prospective clients while adequately taking care of anticipated needs, deliverables, scope, costs, and other specifications.
• Managing and lowering project related costs through intelligent procurement from reliable vendors while ensuring all checks have been placed to control expenses during implementation of different phases.
• Providing oversight during various project phases involving coordination of work, requisition of material and equipment, deliverance of specifications.

Construction Manger at M/s. Nael Energy
  • United Arab Emirates - Abu Dhabi
  • September 2009 to June 2014

Projects Worked On:
Project Name: A 10481.2 Installation of MV/LV Cables, Equipment & Digital Energy Meter.
Duration: Jan 2013 - Jun 2014
Client: AADC
Scope of Work:
• Construction of sub-stations and laying of associated cables for diversion and reinforcement of existing sub-stations as per work order received from AADC.

Project Name: N6820 EPC Work for Al Ain Distribution Network Pump Station
Duration: July 2011 - Jan 2013
Client: TRANSCO
Consultant: ILF Consulting Engineers
Scope of Work:
• Construction of pump house, associated buildings electrical, sub-station, fire pump rooms, and water quality monitoring buildings, different types of chambers for CS pipeline work, drainage, sewerage network, internal roads, walkways, station piping, and tie in works for CS pipeline at AARC.

Project Name: Construction of Kahtim Al Shikla Police Station
Duration: Dec 2009 - Jun 2011
Client: Police Project Committee
Consultant: Al Burj Engineering Consultancy
Scope of Work:
• Construction of administration, accommodation, club buildings, jail, arsenal building, pump room, sub-station, internal roads, and walkways.

Key Responsibilities:
• Managed civil works for cable laying, substation construction, contractors, vendors, and construction of various types of buildings including chambers, internal roadways, walkways, drainage, and sewerage systems.
• Prepared and submitted necessary documents while ensuring all important aspects were covered to obtain permits from various authorities for NDRC, Tile Removal, and Asphalt cutting as per site surveys.
• Coordinated site surveys, prepared shop drawings of cable routes, managed procurement of civil works, and inspected materials to guarantee adherence to quality assurance.
• Maintained cordial working relationship with all ministries, departments, and other municipal bodies for Roads, Traffic and Safety to adhere to local construction regulations and requirements.
• Ensured quality of documentation and test reports adhered to client needs as well as authorities while providing feedback through monthly reports to recommend any changes required.
• Reviewed Quality Assurance and Quality Control documents, shop drawings, and followed up with relevant departments for their timely approval.
• Kept continuous liaison with main contractor, consultants, vendors, subcontractors, and architects for approvals, inspections, documentation, and RCDR items,
• Proactively monitored all execution plans while keeping project schedule in context and kept senior management as well as project managers informed about overall progress.

Project Engineer at M/s. Power Flow Engineering
  • United Arab Emirates - Abu Dhabi
  • July 2006 to November 2009

Project Name: Construction of Trunk Sewers and Associated Treated Sewerage Effluent System Lot A
Duration: Sep 2008 - Nov 2009
Client: ADSSC
Consultant: Parsons International Ltd
Scope of Work:
• Construction of pump house, reservoir, manholes, and chambers for sewerage work.
• Laying of GRP pipe measuring DN 600 & DN 2200 for a 60 kilometers length.
• Laying of DN 400 HDPE for a 35 kilometers length.

Project Name: Supply and installation of 33 / 11 KV stations in Al Ain.
Duration: Jan 2007 - Aug 2008
Client: ADWEA / AADC
Consultant: Mott Mac Donald Ltd
Main Contractor: Larsen & Toubro.
Scope of Work:
• Construction of 6 of 33 / 11 KV sub-stations with associated cabling in different Al Ain locations, fire pumps, water tanks, internal roads, and walkways.

Project Name: Supply and installation of Electronic Consumer Water Meters in Al Ain.
Duration: Jul 2006 - Dec 2006
Client: ADWEA / AADC
Consultant: Hyder Consulting Middle East
Scope of Work:
• Installation of electronic consumer water meter in Al Ain.
• Provided house connection for new users.

Key Responsibilities:
• Constructed pump houses, laid GRP & HDPE pipes as well as manholes for sewerage lines and other various types of chambers to treat water supply.
• Prepared several technical documents including shop drawings, material submittals, method statements, monthly or weekly reports, and technical submittals as per project schedule.
• Coordinated with various stakeholders for the project to help conduct site inspections, oversee daily site activities, and ensure all work is completed as per given time schedules.
• Conducted weekly and monthly site meetings with engineers and other staff to review progress of projects while initiating any actions required to keep deliverables on track.
• Oversaw and managed various aspects of project management involving site activities, preparation of reports, procurement of materials, and handling of subcontractors.
• Conferred with staff, vendors, and other management personnel for purchases, specifications, procedures, deliverables and statuses of projects.

Project Engineer at M/S Tech Max Construction
  • India
  • January 2005 to June 2006

Designation Chronology:
• Jan 05 - Jun 06: Project Engineer
• Jun 01 - Dec 04: Site Engineer and Estimator

Key Responsibilities:
• Responsible for administration of important construction contracts while guaranteeing all project tasks have been completed on timely basis.
• Supervised junior site staff including foremen, reviewed reports, checked to report any difficulties and corrected safety violations.
• Strictly adhered to all safety requirements set by local authorities as well as company polices to avoid accidents or mishaps at construction sites.
• Tracked and controlled schedules for construction as well as associated costs to keep expenses from spiraling out of control.
• Carried out other important tasks related to project management including costing, material procurement, and fulfillment of staffing requirements.

Site Engineer and Estimator at M/s. Techmax Constructions
  • India
  • June 2001 to December 2004

Key Responsibilities:
• Monitored and analyzed projects before and during construction to initiative corrective actions to prevent deviations from schedule.
• Coordinated with other departments to act as facilitator and expedited work implementation as per laid schedule.
• Produced work related proposals while ensuring all important aspects including work methods, scheduling and equipment were covered.
• Interfaced with clients to prepare and submit subcontract inquiries, checks, and accurate bills of quantities for various materials.
• Responsible for creation of project estimates for specific disciplines, appraisals and conducted detailed analysis of tender documents.

Education

Bachelor's degree, B-Tech Civil Engineering
  • at Kerala University
  • May 2001

Other Professional Training & Certifications: • PMP • Certified Cost Engineering Course (CCE) • Course for “FIDIC Contracts and its Management” completed Work Approvals: • Approval from AADC as Resident EngineerEngineer • Approval from TRANSCO as a competent person • Approval from TAKREER as a competent person

Specialties & Skills

Site Supervision
Quality Assurance
Procurement
Project Management
Civil Engineering
Team Management, Deadline Oriented, Multitasking, Work Under Pressure
MS Word, MS Excel, MS PowerPoint, MS Outlook, Internet Usage
Auto CAD, Primavera P3- Basic knowledge, PMP, CCE, Internal Auditing
Vendor Management, Permit Approvals, Liaison, Coordination, Technical Oversight
Communication Skills, Interpersonal Skills, Leadership, Analytical Skills, Presentations
Construction, Planning, Project Management, Contracts Development, Quality Control
Shop Drawings, Material Submittals, Method Statements, Project Deliverables
Quality Assurance, Cost Estimations, Resource Allocation, Material Requisition, Site Meetings