Kashif Shahzad, RAN Implementation Supervisor

Kashif Shahzad

RAN Implementation Supervisor

ERICSSON Pakistan

Location
Pakistan - Faisalabad
Education
Diploma, Electrical
Experience
14 years, 4 months

Share My Profile

Block User


Work Experience

Total years of experience :14 years, 4 months

RAN Implementation Supervisor at ERICSSON Pakistan
  • Pakistan - Faisalabad
  • August 2013 to September 2018

Integration & commissioning of RBS 6000 Family which includes RBS 6201, RBS 6102 and RBS 6601.
• Integration of 4G LTE sites.
• Script loading of 4G LTE sites.
• Troubleshooting of Internal Alarms on all the RBS above mentioned
• Installation of sites & getting them on-aired during swap activity as per Ericsson quality standards
• Commissioning of MW Chassis which include AMM 20P, AMM 6P, AMM 2P & ML CN by using Release 5 Baselines
• Configurations & troubleshooting of microwave links
• Up gradation of all TXN nodes from release 3 to release 5.
• Connectivity & Visibility of POP sites through SPO
• Traffic Routing of WARID sites and service for LTE sites.
• Implementation of DCN on all cluster sites for visibility at NMS
• Acceptance of MW links, Swap sites and newly installed 4G LTE sites.
• Configuration of Emerson rectifier for alarms & Generator starting
• Integration & commissioning of RBS 6000 Family which includes RBS 6101, RBS 6102, RBS 6201 & RBS 6301.
• Integration of 3G sites on Mobilink project.
• Troubleshooting of Internal Alarms on all the RBS above mentioned
• Installation of sites & getting them on-aired during swap activity as per Ericsson quality standards
• Commissioning of MW Chassis which include AMM 20P, AMM 6P, AMM 2P& ML CN by using Release 4 and 5 Baselines
• Configurations & troubleshooting of microwave links
• Preparation of Rings for PMCL network which includes XPIC, Space diversity & 1+1 Microwave links
• Connectivity & Visibility of POP sites through SPO
• Traffic Routing of PMCL sites
• SNCP creation for PMCL Network
• Traffic shifting from Huawei OSN to SPO in coordination with NMS Team

Field Engineer at CM-Pak
  • Pakistan - Karachi
  • October 2009 to July 2013

Ensure smooth network operation and Service Availability in the outsourced environment
• Improvement of network KPIs and performance of the network
• Ensure smooth operation of Network and office Facilities environment
• Management of company’s operations Centre(s), Data Centre(s), Switching Centre(s), Radio Access network, Microwave and fiber transmission network, IP network, LAN/WAN;
• Management and Governance of the Managed Services Partner and other contractors and partners
• Network performance monitoring and optimization;
• Takeover of new equipment from Projects team into the network and facilitate handover to the managed services partner
• Contracts review for all the local contractors
• Liaising with other operators for interconnects and interference management;
• Submission of management reports and regulatory reports to the CTO
• Responsible for Network Inventory Management
• Troubleshooting of ERICSSON RBS 2116 Internal & External Alarms & Submitting reports on daily basis
• Troubleshooting of ERICSSON Mini Link TN Alarms & Submitting reports on daily basis

Team Lead (installation & commissioning) at ERICSSON Pakistan
  • Pakistan - Lahore
  • January 2007 to August 2009

• Integration and commissioning of Ericsson RBS 2000 family
• Team lead for BSS implementation
• Expansions and Integration with relative BSS Network
• Weekly Progress review meeting with Supervisor/Regional Manager
• Reports for monthly rollout target achievements given by the RS/RM
• Team Lead for the installation of Power system for the BTS.
• Perform quality inspection of under construction BTS Sites as per pre-defined Standards.
• To ensure the quality of work and safety issues during installation
• On site Installation commissioning, Integration, Troubleshooting, Maintenance Configurations, loop testing & cross connections of SDH & PDH Equipment.

Shift Incharge (Power House) at SAPHIRE Group of Industries
  • Pakistan
  • May 2004 to January 2007

• Finalization of program and works including all activities in accordance with electrical and mechanical program of work.
• To make sure the coordination between all activities in order to avoid any delay.
• To maintain the computer system of power plants.
• To update the Maintenance Engineer about the on going major activities.
• Voluntarily working as Control Room Operator for best performance Award.
• Installation, testing, commissioning & maintenance of Micro computer control system, and monitor and regulate engine performance.
• Examination, testing & routine maintenance of gas engines type (JGS JENBACHER320 & CATTER PILLER 3516B), Filter cleaning, Tappet clearance of plugs, maintaining the running temperature of engine.
• Operation of gas engines and to maintain relative record.

Education

Diploma, Electrical
  • at G.C.T Faisalabad
  • December 2003

I have done DAE (electrical) in 2003 in 1st division.

Specialties & Skills

Integration
Installation
Commissioning
Testing

Languages

English
Intermediate
Urdu
Expert