Quantity Surveyor
1.Telview International Limited,2.Deepak Associate, 3.Aztec Integrated Consult,4. SDEM Steel Erector
Total years of experience :11 years, 5 months
• Preparation of contract documents
• Tender Evaluation and Analysis
• Re-measurement of works as executed by contractors (weekly Programme)
• Checking application by the contractor for payment progress or interim progress
• Evaluate the final cost of the work based on measured quantities at the contractor’s application
• Project inspection and supervision to ensure that payment for work done are in accordance with the contract.
• Interim valuation of works during the progress of the contract arising from contractor application for payment certificate progress or interim progress
• Interim financial report and cost check.
Past project handled in Nigeria:
(i) The construction of 4 storey administrative office complex for the Polytechnic, Ibadan, Oyo state, Nigeria
(ii) Geregu II 434 Mega Watt Power Project in Ajaokuta, Kogi State, Nigeria. This project was handled by Siemens AG The following works were undertaken:
(a) Camp buildings for Siemens AG staff (57 flat) at new German camp, Ajaokuta Steel City, Kogi state, Nigeria.
(b) Camp power works: Installation of underground armored cables for camp power for street light and fence light, Installation of main distribution boards, and SDB.
(c) Camp development which involves septic tank construction, drainages, piping, walk ways, over-head water tank of 30000 litres of water and concrete road of about 600 metres.
(d) Camp road works- 600metres
(e) Temporary wire fence
(f) Construction of Siemens site office cmplex.
(g) Site development:
(h) Site Power:
(i) Site road network
(j) Construction of cars park
(k)Collating data of steel members erected and cladding works for monthly valuation.
(l) Collating and calculating equipment and machine daily schedule for weekly assessment and monthly valuation.
(n)Rehabilitation of Roads (5.2Km) in Akure North Local Government, Ondo State
(o)Rehabilitation of roads and asphalt overlay (7.6KM) for Irele Local Government, Ondo State