Total Years of Experience: 19 Years, 9 Months
January 2013
To Present
SR Site mechanical manager
at germin trading and contracting
Location :
Qatar - Doha
fire fighting works, (construction), HVAC works
Drainage, Plumbing works, Mechanical ventilation, Pipe line and storage petrolume tanks, steel structure
Drainage, Plumbing works, Mechanical ventilation, Pipe line and storage petrolume tanks, steel structure
September 2010
To October 2012
Site manager (SAUDI ARABIA) (Sep
at JELZ INTERNATIONAL
Location :
Saudi Arabia - Riyadh
1-full awaring with fabrication and erection sprinkler system (pendent &upright &sidwall) by using grooved system or threaded or welding system, and coordination with HVAC and electrical departments before pipes installation.
2-Erection landing valves, siames inlet connection and roof outlet connection and zone control valve (temper swish, gate valve and test drain).
3-Installation FM200, Co2 and FHC and all accessories.
4-Istallation mechanical pump, electrical pump and jockey pump, and assembly all inlet and outlet piping.
5-making tack off material for every project such as pipes, threaded fitting, grooved fitting and welding fitting.
6-fire allarm erection such as adressable or cinventional system, all accessaries such as control panal, bell, break glass, acts
7-plumbing erection and fabrection and all accessories
8-HVAC piping construction
2-Erection landing valves, siames inlet connection and roof outlet connection and zone control valve (temper swish, gate valve and test drain).
3-Installation FM200, Co2 and FHC and all accessories.
4-Istallation mechanical pump, electrical pump and jockey pump, and assembly all inlet and outlet piping.
5-making tack off material for every project such as pipes, threaded fitting, grooved fitting and welding fitting.
6-fire allarm erection such as adressable or cinventional system, all accessaries such as control panal, bell, break glass, acts
7-plumbing erection and fabrection and all accessories
8-HVAC piping construction
August 2009
To September 2010
Site Engineer and QC (EGYPT)
at ECO ASSOCIATES
Location :
Egypt - Suez
1- Fabrication and erection the vertical and horizontal tanks including on the ladders and stairs, Determination the location of the nozzles on the tanks.
2-Fabrication and erection al lsize pipes (cutting, chamfering, fitting up, welding and painting).
3-Fabrication and erection sid wall ducts, float ducts, socket plate ducts and intallation all the blowers in saint goban glass egypt factory.
4-Responsiple for inspection of raw materials and visual inspection of welds metal speciment according to AWS specification A5.1, A5.5.
5-Very good knowledge to visual inspection for the tanks and pipes such as plumness, peaking, banding, roundness, fit up, alinment, slearances and welding.
6-Maintains Control and update all welding procedures specification (WPS) and welding Qwalification Records(PQR) in accordance to the latest copany standards, international relevant codes.
7-Carrying out activities (RT, UT, MT, PT, VT) according to project specs& NDT scope requirement.
8-Very good knowledge ISO 9001 and applying all documents such as flow chart, inspection test plane, time scheduale, mane power list, equipment list, weakly progress, inspection report, non confomity report, corrective action, customer satisfaction, callibration plane, project problems.
9-Managment the coordination between the safety and construction function to ensure the implementation of the company"s safety plan at the sites.
2-Fabrication and erection al lsize pipes (cutting, chamfering, fitting up, welding and painting).
3-Fabrication and erection sid wall ducts, float ducts, socket plate ducts and intallation all the blowers in saint goban glass egypt factory.
4-Responsiple for inspection of raw materials and visual inspection of welds metal speciment according to AWS specification A5.1, A5.5.
5-Very good knowledge to visual inspection for the tanks and pipes such as plumness, peaking, banding, roundness, fit up, alinment, slearances and welding.
6-Maintains Control and update all welding procedures specification (WPS) and welding Qwalification Records(PQR) in accordance to the latest copany standards, international relevant codes.
7-Carrying out activities (RT, UT, MT, PT, VT) according to project specs& NDT scope requirement.
8-Very good knowledge ISO 9001 and applying all documents such as flow chart, inspection test plane, time scheduale, mane power list, equipment list, weakly progress, inspection report, non confomity report, corrective action, customer satisfaction, callibration plane, project problems.
9-Managment the coordination between the safety and construction function to ensure the implementation of the company"s safety plan at the sites.
August 2008
To August 2009
QC Coordination (EGYPT) (August
at ECO ASSOCIATES
Location :
Egypt - Cairo
1-monitoring welder"s performance (welder"s test, qualification, identification calculation repair rate for aech one ) ensure only qualified welders are performing.
2-Participate in preparing welding &NDT procedures according to codes&specs (ASME IX, API 650, API 11.4 D1.1).
3- Check for fit up (clearance, allowances, dimentions, alignments).
4-Check for intern cleaning, distortion control, welding current, votage, chipping, grinding, and gouging.
5-Ensuring the QC activities are incorporated with the overall construction plane fabricaetion, erection, welding, quality control of piping system& tanks &steel structure and the ducts.
Advices and recommends and approves all WPS for all related welding application works.
Coordination beween all projects and folow up the QC activity.
2-Participate in preparing welding &NDT procedures according to codes&specs (ASME IX, API 650, API 11.4 D1.1).
3- Check for fit up (clearance, allowances, dimentions, alignments).
4-Check for intern cleaning, distortion control, welding current, votage, chipping, grinding, and gouging.
5-Ensuring the QC activities are incorporated with the overall construction plane fabricaetion, erection, welding, quality control of piping system& tanks &steel structure and the ducts.
Advices and recommends and approves all WPS for all related welding application works.
Coordination beween all projects and folow up the QC activity.
April 2007
To August 2008
Site engineer (EGYPT)
at EL SWEDI FOR CABLES CO
Location :
Egypt
1- Witness and supervise hydro test proceeding of piping loops, risers, penumatic tests.
2-Construction and inspection of reinforcement after final intallation as per approved drawing.
3-Assembly and inspection the steel structure.
4-following up technical submittals the roports which related to materials.
5-Awaring with all manufacuring steps of installation the insulated phase buses (IPB) such as grinding, chamfering, fitting up, welding and painting.
2-Construction and inspection of reinforcement after final intallation as per approved drawing.
3-Assembly and inspection the steel structure.
4-following up technical submittals the roports which related to materials.
5-Awaring with all manufacuring steps of installation the insulated phase buses (IPB) such as grinding, chamfering, fitting up, welding and painting.
October 2005
To April 2007
construction engineer (Egypt) (Oct
at Military forces, EGYPT
Location :
Egypt - Cairo
1- Fabrication and erection the steel structure in the millitary workshop.
2-Applying the millitary orders quickly and achieeving high progress.
3-Aleading the productive works to high quality.
4-Inpection of the repair works during construction.
2-Applying the millitary orders quickly and achieeving high progress.
3-Aleading the productive works to high quality.
4-Inpection of the repair works during construction.
October 2003
To September 2004
Inspector
at Elmassa groop
Location :
Egypt - Alexandria
1- Carrying out NDT activities(RT, MT, PT, VT, UT) according to project specs.
2-Monitoring welder" performance qualification (welder test).
3-Check for fit up(clearance, allowance, dimention, aligment and visual inspection).
4-Ensure the quality control activitites incorporated with the all construction plan(fabrication, erection, welding, quality control of piping systems, tanks, steel structure and ducts..
2-Monitoring welder" performance qualification (welder test).
3-Check for fit up(clearance, allowance, dimention, aligment and visual inspection).
4-Ensure the quality control activitites incorporated with the all construction plan(fabrication, erection, welding, quality control of piping systems, tanks, steel structure and ducts..
Share on Facebook
Share on Twitter
Share Via Email