Work Experience

Total years of experience :39 years, 5 Months

Project Manager - Outage at ALSTOM Middle East
  • United Arab Emirates - Dubai
  • My current job since March 2002

1. As Project Manager:
• Meetings with customers, preparing tenders for site infrastructure and activities, scope reviews, where necessary contractor evaluations, technical scope, administrative and commercial planning, initiating orders for material, human resources, tools, Checking Spare parts / inventory and Documentation, supporting and monitoring site activities.
• Responsible for all Field Service Gas Turbine / Steam Turbine & Generator overhaul projects within the area of my jurisdiction, within Power Service Segment and Project Organization within the Gulf regions: Iran, Egypt, Jordan, Oman, UAE & Saudi Arabian regions.
• Application the phases of strategic planning on, Human resources, tools & Equipment preparation, materials, mobilization, project handling, inspections & project monitoring, overhauls and demobilization
• Responsible for costs control, site work schedule, liaises between the Project Management PM), Poject Manager System (PMS) and Site Organization.

2. As Outage Site Manager:
• Overhauling of 2-units 140 MW Gas Turbine & Generators GT13D at Umm Al Nar, Abu Dhabi, UAE in 2006 & 2007 respectively
• Overhauling of 4-units 172 MW Gas Turbine & Generators, GT13E2 at Hormozgan, Iran in 2005, 2008, 2009 & 201
• Overhauling of DEWA E ST06 Steam Turbine & Hydraulic System - 2011

Note: Overhauling starts from shutdown reading, unit shutdown & cooling, disassembly, inspection & modification (if required), reassembly & re-commissioning.

3. As Technical Project Engineer:
• Carry out Overhauling & Project Engineering for 8-units 100 MW Gas Turbine GT11D5 at Rabigh, Saudi Arabia from 2002 to 2004.
• Carry out Overhauling & Project Engineering for 16-units 100 MW Gas Turbine, GT11D5 at Jeddah PP3, Saudi Arabia.

QA/QC Manager at Saudi Binladen Group - IPP
  • Saudi Arabia - Riyadh
  • October 1996 to November 2001

Position : QA-QC Manager
Job Descriptions : Responsible for the following:
1. SCECO C - 1, 200 Megawatt PP9 Project, Riyadh. 1.4 Billion Dollars Project. (16 Gas / 4 Steam Turbines)
SCECO - Power Projects:
• Review Qualification of Vendors, Manufacturer & Sub-contractors.
• Establish Project QA/QC Manual, Plan & Procedures (Method Statement) as per ISO 9000
• Develop Inspection and Test Plan for BOP Mechanical Installation -Pump Station & Fuel System, Water Supply & Treatment, Water Chemical Injection System, Water Sampling, Compressed Air System, Fire & Foam, HVAC System and Crude Oil Tanks.
• Quality Control / Inspection for Thermo & Electro-Mechanical Installation
• Witness, Review / Attest In-process testing for Electro-Mechanical processes and Vendor Inspections.(witness factory testing)
• Welding Inspection, Review / Attest all NDT Examination from third party agencies.

Senior Inspection Engineer at Al Mutawa Samyong Company (AMSYCO) Ltd.
  • Saudi Arabia - Dammam
  • February 1995 to September 1996

Position : Senior Inspection Engineer
Job Descriptions : Responsible for the following:
SAUDI ARAMCO - Crude Oil Pipelines:
• Gas & Oil Pipelines (various sizes) for GOSP sites between, Abqaiq, Shedgum and Aindar - KSA, - QC Welding / NDT Inspector.
• Magnetic Flux Leakage for Tank Floors.
REFINERY / PETROCHEMICAL PROJECTS;
• Supervise inspection of On-site Construction of Steel Tanks, Welding inspection and Non-destructive Testing.
• Supervise Magnetic Flux Leakage (MFL) Inspection and Ultrasonic Testing (UT) for Tank Bottom Floors above 10-15 years old.
• Supervise inspection for Post Weld Heat Treatment - SWCC Projects.
• Approving Officer for All Non-destructive Testing Procedures, Ultrasonic Test (UT), Radiographic (RT), Magnetic Particle Test (MPI) and Dye Penetrant Test (DPT)
• Conduct Magnetic Flux Leakage (MFL) Inspection for 10-15 year old Tank Bottom Floors at Rastanura Refinery Tank Farm and Yanbu Bulk Plant.
• Conduct Welding Inspection for Tanks, Pressure Vessels and Process Pipelines - Rastanura Refinery Up-grade Project.

QA/QC Engineer at Saudi Electro-Mechanical Const. Co. (PETCON), KSA
  • Saudi Arabia - Dammam
  • August 1991 to December 1994

Position : QA/QC Engineer
Job Descriptions : Responsible for the following:
1. Expansion Project, Petromin Shell, Refinery, Jubail KSA.
• Supervision / Manage construction of Crude Oil Tank farms.
• Meeting with customer, Cost Control, Schedule & Weekly progress reports
• Review Technical drawings & Material Specifications.
• Final Project Turn over & Documentation




2. QA/QC Engineer (Aramco Approved)- Saudi Aramco Projects, Rastanura & Abqaiq, KSA - GOSP
SAUDI ARAMCO - Plant Refinery Projects:
• Rastanura Up-grade Project, Package # 3 & 6, QC Welding Inspector - Process lines, Tanks & Vessels.
• Berri Gas Plant Expansion Project, Installation of Process lines, Heat Exchangers, Tanks & Vessels. - QC Welding inspector.
• Abqaiq BMS Project - Boiler Management System, Upgrading of Boiler # 12 & 14. - QC Welding inspector.
PETROCHEMICAL PROJECTS:
• Working under John Brown E & C for IBN Hayyan VCM Expansion Project, Jubail KSA. In charge in Quality Control for fabrication & Installation of Pyrolysis Modularization Furnace, Quench Scrubber, Heat Exchangers related Mechanical work and Plant Equipment.
• Working under Toyo Engineering Corporation to conduct Quality Control for fabrication and installation of 5 Units Reactor Vessels, for Petrochmical Industries Co. ltd., Prolypropylene Project - Al-Humaidi Kuwait.

Project Manager at LAGOS Corporation, Phil
  • Philippines
  • January 1986 to January 1991

Position : Project Manager
Job Descriptions : Responsible for the following:
• Site Development- Ayala Alabang Village, Phi
• Responsible for Site Management on Site Development Project Area 7-a.
• Review monthly progress report.
• Established target schedule for the installation of Drainage system, Water Distribution System & Sewerage system
• Water Improvement Project, US Naval Base, Olongapo City Phil.
• Responsible for Site Management for the Construction of Water Supply system at US Naval Base.
• Construction of 2-concrete water reservoirs & water pipeline.
• Review monthly progress report.
• Attend monthly meeting with US Naval Base project personnel

Project Engineer at Asian Water & Sewerage System (AWASS), KSA
  • Saudi Arabia - Jubail
  • January 1984 to January 1986

Position : Project Engineer
Job Descriptions : Responsible for the following:
• Royal Commission Jubail & Yanbu Project, No. 168-C01 for Site Development Project.

Education

Bachelor's degree, Mechanical Engineering
  • at Divine Word University
  • March 1978

Graduated in Bachelor of Science in Mechanical Engineering

Specialties & Skills

Inspection
Job Descriptions
Installation
Primavera
Auto CAD
MS Word
MS project

Languages

English
Intermediate

Memberships

ASNT
  • level II
  • February 1995
Phil. Mechanical Engineer
  • Member
  • August 1982